TEAM Industrial Solutions
QC INSPECTOR

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: INDIA
Status:
I need a job as soon as possible.
Certifications
„h CSWIP 3.1 CERTIFIED WELDING INSPECTOR (CERT.No 11161)

„h ASNT LEVEL ¡VII in RT, MT, PT
Education
„h B-TECH DEGREE in Mechanical Engineering from Govt.College of Engineering, Kannur.
(1988- 1992 Batch, Calicut University, INDIA.)

Experience
Having 12 years experience as a QC INSPECTOR related to Inspection of Piping, Pressure vessels, Pipeline and Structural in Refinery, Petrochemical, Power, Aluminium, Oil and Gas Industry Projects in BAHRAIN, UAE & INDIA.


Employer SHAW-NASS MIDDLE EAST WLL,BAHRAIN
Industry EPC CONTRACTORS.
Position QC INSPECTOR
From/To 17TH MAY 2005 TO 17TH NOVEMBER2005
Major Projects Fabrication Of piping systems ¡Vfor DOLPHIN-JGC Raslaffan project.

Employer NASS MECHANICAL CONTRACTING WLL,BAHRAIN
Industry MECHANICAL CONTRACTORS.
Position QC INSPECTOR
From/To 6TH SEPTEMBER 2004 T0 23RD MARCH 2005
Major Projects For ALBA (Aluminium Bahrain B.S.C) Pot Line 5 Expansion Project-Fabrication & Erection of Pot Superstructures and Piping.

Employer MARITIME INDUSTRIAL SERVICES CO. LTD. (MIS) SHARJAH, U.A.E
Industry ONSHORE/ OFFSHORE EPC CONTRACTORS
Position QC INSPECTOR
From/To 25TH NOVEMBER 2002 TO 3RD APRIL 2004
Major
Projects „h For SBM- Construction of Process Modules for FPSO.
„X For Petrofac Iran- Fabrication of Pressure Vessels. (Dorood Project Onshore Facilities& New Plant).
„X For Saudi Aramco- Fabrication of U stamp Pressure vessels (Qatif Facilities at Berry Gas Plant)
„X For BP AMOCO- Repair work of coded molesive vessel.
„X For Technip Italy- Fabrication of Pressure Vessels. (Arak Olefins Plant Expansion.)


Employer PETRON ENGINEERING CONSTRUCTION LTD, MUMBAI, INDIA.
Industry CONSTRUCTION
Position QC INSPECTOR
From/To 12TH SEPTEMBER 1993 T0 31ST AUGUST 2002
Major Projects „h For Mangalore Refinery&Petrochemical Ltd-C.D.U, V.D.U, N.S.U, Kero Heaters Fabrication& Erection.
„h For Mangalore Refinery&Petrochemical Ltd- C.C.R Piping, Structural Fabrication and Erection.
„h Pipeline (U/G) from Mangalore Refinery&Petrochemical Ltd to Mangalore Port.
„h For ABB-ALSTOM POWER- Construction of 250MW LF Fired Power Plant at Naively, India.
„h For Mangalore Chemical & Fertilizer Ltd ¡VAmmonia&Urea Plant Shutdown Work.
„h Pipeline (U/G) From New jetty to Mangalore port terminal
„h For Chennai Refinery Ltd- C.D.U, V.D.U Heaters.












Nature of Works Handled:
„h Monitor fabrication activities to ensure that production carry out their activities in accordance with project specifications. Prevent any non-conformance from occurring for in-process materials, during cutting, fit-ups, welding, NDT, inspection and testing, painting and erection.
„h To study and familiarize with project specifications for materials, fabrication, installation and all testing requirements.
„h Witness Welding Procedure qualification and Welder Qualification test.
„h Monitor that materials are correctly identified at various stages of production.
„h Fit-ups are correctly made as per WPS. Randomly check that Internal Release Note information is correctly filled by the shop foremen for proper traceability information.
„h Visual inspection of welds and report to Welding Engineer.
„h Check filled and completed Internal Release Notes after welding, and specifies NDT to be performed. Co-ordinate with Documentation and NDT clerks for providing information on material and weld traceability and NDT.
„h Carry out daily welder audits to check on welder performance, use of consumables, welding machines, WPS etc.
„h Check approved PWHT procedure is available and witness PWHT.
„h Stage inspection of fabricated items prior to painting by carrying out visual inspection for welding and materials for finish and appearance.
„h Co-ordinate with production and project engineers, receive Hydro-test Packs, review Test Packs, co-ordination with parties for witnessing witness tests, verify re-instatement etc.
„h Periodic checks at each stage of blasting&painting. Check ambient temperature, Relative humidity, Surface condition, Blast profile, Primer thickness, Finish coat Thickness (Wet / Dry film thickness as applicable) and record all relevant information.
„h Liase with Documentation Clerks and co-ordinate for providing any missing information for the compilation.


NVI NDT