NDT.org

NDT.org : Resumes : Rope Access NDT / Welding Inspector


Posted: 1/30/2006 9:16:23 PM
Resume Header/Title:

Rope Access NDT / Welding Inspector

Country:

Malaysia

Extra Info:

I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.

 Login for contact information.
 
 
 
 
 
 
Certifications:

• TWI TRAINING & CERTIFICATION (SEA) S/B, MALAYSIA
CSWIP 3.1 V WELDING INSPECTOR (2003)
EXPIRY DATE V 29/04/2008

• RUANE-TATI SDN. BHD, KEMAMAN, TERENGGANU, MALAYSIA (2002)
PERSONNEL CERTIFICATION OF NDT LEVEL II - PCN NUMBER 209406
ULTRASONIC TESTING (UT) 3.1, 3.2 & 3.9
MAGNETIC PARTICLE TESTING (MT)
PENETRANT TESTING (PT)
EXPIRY DATE V 23/01/2010

• IRATA ROPE ACCESS ABSEILING LEVEL 1 (2003)
IRATA NO: 1/9281

Experience:

EMPLOYER : ESP (INTERNATIONAL) LTD
POSITION : UT INSP/ ROPE ACCESS L1
DATE : JAN 2005 V OCT 2005
PROJECT /CLIENT : SBIM ( SYTEM BASE INTERGRITY MANAGEMENT)ADMA-OPCO, ABU DHABI, U.A.E.
JOB DESCRIP. : MONITORING & SEARCHING INTERNAL/EXTERNAL CORROSION FOR PIPING/PIPELINE LINEWORKS USING ROPE ACCESS TECHNIQUE (RAT) ACCORDING TO CLIENT & STANDARDS SPECIFICATION


EMPLOYER : TL OFFSHORE SDN. BHD
POSITION : QA/QC INSPECTOR
DATE : JULY 2004 V DEC 2004
PROJECT : PETRONAS CARIGALI SDN.BHD.
X 14 KM PIPE LAY (8DIA. 10DIA. AND 14DIA. ) FAIRLEYVBARAM PIPELINE INSTALLATION FROM FAIRLEY BARAM PLATFORM, BRUNEI WATER TO BARAM A PLATFORM, SARAWAK WATER COMPLETED WITH RISERS INSTALLATION
X BARAM-8 PLATFORM REMOVAL (SARAWAK SHELL BERHAD)
X JACKET AND TOPSIDE INSTALLATION OF SFK-A (SOUTH FURIOUS PLATFORM, SABAH SHELL PETROLEUM CORPORATION).
X JACKET AND COMPRESSOR MODULE INSTALLATION AT SABAH WATER.SFD III PIPELINE PROJECT V EXXON MOBIL EPMI CONDUCTED WPQT AND WQT FOR PIPELINE AND TOPSIDE INSTALLATION AT CREST MARINE BASE, JOHOR PORT, PASIR GUDANG


EMPLOYER : LOTT INSPECTION SDN. BHD.
SECONDED TO SARKU ENGINEERING SDN. BHD
POSITION : QA/QC INSPECTOR
DATE : 7 MAY V 15 JUN 2004
PROJECT : E11 REJUVENATION PROJECT
JOB DESCRIP. : REVIEWING SPECIFICATION, AFC DRAWING, SHOP DRAWING AND WORK
PACK. PERFORMING VISUAL, DIMENSION AND FIT-UP INSPECTION VERIFYING PWHT AND PERFORMING WELD INSPECTION AS PER REQUIREMENT. ENSURING WELDER USING CORRECT, APPROVED AND QUALIFIED WELDING PROCEDURES. PERFORMING NDT SUCH AS MPI AND DPI ON THE SPOOL PIPE AND FABRICATED STRUCTURES. PREPARING AND MONITORING PUNCH LIST AND FLUSHING ITEMS. WITNESSING HYDRO TEST PACKAGE FOR PIPING SYSTEMS.


EMPLOYER : FAME OFFSHORE SDN. BHD.
SECONDED TO NIPPON STEEL CORPORATION (M) SDN. BHD.
POSITION : QA/QC INSPECTOR
DATE : 23 MAC V 27 APRIL 2004
PROJECT : 24 JINTAN PIPELINE RE-INSTALLATION (BATAM)
JOB DESCRIP. : INVOLVED IN MONITORING AND INSPECT WPQT AND WQT ACTIVITIES


EMPLOYER : OILFIELD PIPELINE INSPECTION S/B (OPI)
POSITION : NDT MULTITECH
DATE : DEC 2003 V FEB 2004
PROJECT : PTT BONGKOT FIELD WP-14 PHASE II FOR PIPELINE LAYING AND JACKET INSTALLATION IN THAILAND


EMPLOYER : FAME OFFSHORE SDN. BHD.
SECONDED TO NIPPON STEEL CORPORATION (M) SDN. BHD
POSITION : QA/QC INSPECTOR
DATE : 10 SEPTV 29 NOVEMBER 2003
PROJECT : PETRONAS CARIGALI SDN BHD
X 38.9 KM 16 PIPELINE INSTALLATION-KINARUT DRILLING PLATFORM (KINDP) TO ERB
WEST (EWDP)
X ANGSI PIPELINE INSTALLATION
JOB DESCRIP. : INVOLVED IN MONITORING PIPELINE INSTALLATION ACTIVITIES.
ENSURE THE MATERIAL IS COMPLY WITH PROCEDURES AND SPECIFICATIONS PROVIDED BY CLIENTS PRIOR WELDING ACTIVITIES. ENSURE THE JOINT PREPARATION, SURFACE CLEANLINESS AND PREHEATING METHOD IS SATISFACTORILY. ENSURE ALL WELDING PARAMETER OF EVERY LAYER IS COMPLYING WITH THE WPS DURING THE WELDING PRODUCTION. VISUALLY INSPECTED THE TOTAL QUALITIES OF WELDMENT ARE FREE FROM VISION DEFECT AND ENSURE THE WELDMENT AND METAL SURFACE ARE CLEAN. REVIEW NDT RESULT AND TRY TO REDUCE THE DEFECT DURING THE WELDING PRODUCTION. ENSURE PIPELINE WRAPPING AND COATED THE BARE PIPE SURFACE AND THE TEMPERATURE OF MASTIC IS SATISFACTORILY TO THE MANUFACTURER RECOMMENDED. REPORT WRITING ON ALL ACTIVITIES AND SUBMITS/PRESENT TO THE HIGHER AUTHORITY FOR FURTHER ACTION.


EMPLOYER : VELOSI (M) SDN BHD
POSITION : UT / WELDING INSPECTOR
DATE : SEPT 2002 V SEPT 2003
PROJECT : SARAWAK SHELL BHD AND PETRONAS CARIGALI SDN. BHD.
X M1 EXPANSION
X REMOVING KETAM PLATFORM
X M3 MODIFICATION FOR SERAI TIE-INS
X B-SCAN (ERB-WEST AND TEMBUNGO) FOR PRESSURE VESSEL INSPECTION.
X MARINE 305 REJUVENATION AND MODIFICATION WORKS
JOB DESCRIP. : TO PERFORM INSPECTION FOR OFFSHORE PRODUCTION AND DRILLING
PLATFORM FACILITIES COMPRISING OF PIPING , FITTING RISERS, CHEMICAL TANKS, CONDUCTORS, JACKETS, PRIMARY AND SECONDARY STRUCTURE, NODE AND ETC.. TO CARRIED OUT UT-A SCAN ON T,K,Y JOINTS AND OTHERS ON OFFSHORE FACILITIES. PERFORM UT WALL THICKNESS MEASUREMENT ON PIPING AND VESSEL. PERFORM B-SCAN ON RISERS, PIPING AND VESSELS. CONDUCT DPI AND MPI WHEN REQUIRED. COORDINATE WITH THE CONTRACTOR TO MINIMIZE WORK INTERFERENCE DUE TO TESTING OR PROCEDURE ROUTINES. FAMILIAR WITH SAFETY PROCEDURES AND REQUIREMENTS. MONITORING FABRICATION AND INSTALLATION AT OFFSHORE FACILITIES AND TO ENSURE ALL WORKS PERFORMED ARE ACCORDANCE CLIENT REQUIREMENT.


EMPLOYER : DANAMIN TRADE & SERVICES
POSITION : UT TECHNICIAN
DATE : 24 JULY - 12 AUGUST 2002
LOCATION : GPP 4 (SHUTDOWN TURNAROUND 2002)
JOB DESCRIP : CARRIED OUT ULTRASONIC FLAW AND THICKNESS GAUGING (UTTG)


EMPLOYER : ARSEA ENGINEERING SDN. BHD.
POSITION : QC INSPECTOR
DATE : APRIL 2001 V NOVEMBER 2001
PROJECT : FABRICATION AND INSTALLATION OF LUMUT LIGHT HOUSE
WORK SCOPE : ENSURE ALL MATERIAL, EQUIPMENT AND COMPONENT IS MEET THE CLIENT
SPECIFICATIONS BY REFERRING TO THE ASTM STANDARD AND MILL CERTIFICATED. MONITOR THE FABRICATION ACTIVITIES BY FOLLOWED CUTTING LAYOUT DRAWING, MARKING AND PRE-DIMENSION. ENSURE ALL WELDING VARIABLE IS COMPLIANCES TO AWS D1.1 AND CHECKED THE JOINT FIT-UP/PREPARATION IS COMPLIANCE WITH THE WPS PROVIDED BY CLIENT. ENSURE ALL WELD POSITION AND SAFETY PRECAUTION IS FOLLOWED IS FOLLOWED BY WELDER. COMPILING ALL RECORD AND REPORT ON THE FABRICATION. REPORT WRITING ON ALL FABRICATION / WELD ACTIVITIES AND PRESENT/SUBMIT TO THE ENGINEER.


EMPLOYER : INTESTMAL CORP. SDN. BHD.
POSITION : NDT TECHNICIAN
DATE : FEBRUARY 2000 V MAC 2001
JOB DESCRIP. : CONDUCT MPI AND DPI FOR ONSHORE PRODUCTION AND FACILITIES COMPRISING OF PIPING, FITTING RISERS, CHEMICAL TANKS, VESSEL,CONDUCTORS, PRIMARY AND SECONDARY STRUCTURE, NODE AND ETC..


All Contents Copyright (c) 2014 NDT.org
Use Subject to Terms and Conditions
Phone: 888.278.8804 | webmaster@ndt.org