NDT.org

NDT.org : Resumes : NDT inspector / NDT QA


Posted: 11/8/2007 2:49:51 AM
Resume Header/Title:

NDT inspector / NDT QA

Country:

Malaysia

Extra Info:

I am willing to Travel.
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.

 Login for contact information.
 
 
 
 
 
 
Certifications:

PCN level 2 in Ultrasonic Testing 3.1,3.2
PCN level 2 Radiography Interpretation
ASNT level 2 Magnetic Particle
ASNT level 2 Dye penetrant

ASNT level 2 in UT, MT, PT (in house)Favelle Favco conducted by Lott Inspection.

ASNT level 2 in UT, MT, PT (in house)by Nusantara Technologies Sdn Bhd.

Attended course 7 QC tools for QA/QC personnel conducted by Favelle Favco Sdn Bhd.

Education:

Diploma Aircraft Maintenance Technology 2007. CGPA : 3.90
MUET : Band 5
SPM : 5A 3B 2C

Experience:

Period : June 2008 till present
Company : Nusatest Sdn Bhd

Client : Aker Solutions Malaysia
Project: Maersk, Transocean, Sevan
Job Description : NDT Coordinator. Coordinate inspections HT,MT,UT on riser pipes. Coordinate manpower for 24hours availability.

Client: TUV Nord
Project: KEV UNIT 5 Shutdown
Job Description: NDT Coordinator of 5 techs for completing UTM, UT, MT and PT on boilers, tubes and pressure vessels.

Client : Solar Alert Sdn Bhd.
Project : Riser PCSB.
Job Description : UTFD on riser according to ASME VIII Div 1 appendix 12.

Client : Z.A Smart Sdn Bhd
Project : Hydrogen BGV tank shutdown
Job Description : UT on long seam and circ seams, MT (fluorescent)on internal and UT Thickness measurement.

Client : CCM Plant Fertilizer
Project : Ammonia Tank
Job Description : UTM, HT and DPI on long seams and circ seams.

Client : Dickson Marine Sdn Bhd.
Project : Barge no 3.
Job Description : UTM on barge body, corrosion mapping.

Client : Jutasama Sdn Bhd.
Project : Ningxia Coal Based Propylene Project (Pressure Vessel)
Job Description : UTFD according to ASME VIII, BS 1113:1999. Lamination check according to ASTM A578.

Client : Petra Fabricators Sdn Bhd.
Project : Various (Vessels)
Job Description : UTFD according to ASME VIII, BS 1113:1999. Lamination check according to ASTM A578.

Client : Kone Crane Sdn Bhd.
Project : Jimah overhead Crane
Job Description : UTFD according to AWS D1.1 CLass R and MT according to Table 6.1.

Client : Tenaga Tiub Sdn Bhd.
Project : KEV Kapar Unit 5 and Unit 6 Shutdown.
Replacement of water wall tube of furnace.
Job Description : As Team Leader.UTFD according to ASME VIII using special probe.

Client : Hirose Electric Sdn Bhd.
Project : Air Receiver Tank
Job Description : UTM on tank wall, corrosion mapping.

Period : Jan 2008 till May 2008
Company : Favelle Favco Cranes Sdn Bhd.
Job Description : UT, MT and PT on various joints of cranes according to AWS D1.1 2006 (Class R) and Table 6.1.
Review radiography film.
Liase with subcontractor to schedule radiography inspection.
Manage all NDT consumable and liase with management.
Do NDT reports to be incorporated into Manufacturing Data Records (MDR).
Do UT on Welder Qualification Test.
Coordinate NDT activities in factory.

Period : Jul 2007 - Sept 2007
Company : Malaysian Flying Academy
Job Description : Aircraft Technician cum NDT Inspector. Doing Dye Penetrant on wheel hub and landing gear components.

Comments:

Excellent skill in Microsoft Office.
High Proficiency in English.(writing and verbal)
Willing to relocate if needed.


All Contents Copyright (c) 2014 NDT.org
Use Subject to Terms and Conditions
Phone: 888.278.8804 | webmaster@ndt.org