NDT.org

NDT.org : Resumes : welding /ndt inspector

RF System Lab Video Borescope and Visual Testing
Posted: 1/18/2008 8:20:33 AM
Resume Header/Title:

welding /ndt inspector

Country:

Malaysia

Extra Info:

I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.

 Login for contact information.
 
 
 
 
 
 
Certifications:

: ASNT Level II in RT/ MT/ PT
MLVK Level I in RT
: PCN Level II in Welding Inspector
Welding Inspector 3.1 course conducted by MINDT
Radiographic Interpretation course conducted by TWI
OPI in-house training in RT/ MT/ PT.
Basic radiography course conducted by MINT
SEQU Sea Survival and HUET
OTS Sea Survival and Offshore Safety Orientation.

Experience:

Apr06 - Present :FOCUS INSPECTION SDN BHD
Employed as Radiography Interpreter & Senior NDT Supervisor for both onshore and offshore project

Okt 07 – Okt 07 : Saipem Asia Pacific
As NDT Supervisor & Radiography Interpreter for the Bumi, Bulan & Suriya – Gas Field Development Project, onboard Saipem Castoro 8. Offshore Malaysia Thailand.

Jul 07 – Sep 07 : Intraline Resources Sdn Bhd
As Qc carried out Visual Inspection for the Talisman & NewField Offshore Installation Project onboard HD-60, Offshore Malaysia.

Feb 07- May07 : Hyundai Heavy Industries
As a Radiography Interpreter for 36” x 7.2 km and 48” x 32 km pipeline installation for BTIP Onshore Facilities/Offshore Pipelines Project, on barge HD 289
Nigeria


Jul06-Aug 06 : Saipem uk Limited
As Radiography Interpreter on 20’’ dia x 95 km
Offshore pipeline onboard semac1, Sakhalin Russia.

May. 96 – Mar 06 : OILFIELD PIPELINE INSPECTION SDN BHD
Employed as Radiography Interpreter & NDT Supervisor for both onshore and offshore project

Oct. 04 – Dec 05 : Consolidated Contractors International Co
As a NDT Coordinator on 42” x 443km – Kutaisi Baku, Azerbaijan.

June 04 - Sept. 04 : Nippon Steel Corporation
Carried out x-ray radiography for on 8” & 12” dia pipeline For Chevron MFP Stage IIB Project, on Barge Pelangi, Alpha, Thailand.

Sept 03 – Apr 04 : Hyundai Heavy Industries Co. Ltd
As a NDT Supervisor carried out radiography on 10”, 28” & 30” x 50 km each pipeline installation & riser installation for Hang Zhou Bay Pipeline Project, on barge HD 289 China.

Mar 03 – Jun 03 : Argus As a Qc carried out Visual Inspection on 14” dia pipe for KNOC- DONG HAE-1Gas Development Project, Korea.

Dec 02 – Feb 03 : Hyundai Heavy Industries Co. Ltd
As a Radiography Interpreter Carried out WPS on 28” Test Piece for PGN Offshore Pipeline Project to Hang Hong Yard, and HD- 423, Singapore & Batam.

Jul 02 – Aug 02 : J Ray McDermott Far East Inc.
As a Radiography Interpreter carried out x-ray radiography on 6” to 16” dia pipeline Installation for JVPC Rang Dong Project,Offshore Vietnam.

July 02 – July 02 : Penang Shipbuilding Corporation
Carried out gamma-ray radiography for Resak Compressor Module at Pulau Jerjak, Penang.

May 02 – June 02 : J Ray McDermott Far East Inc.
As a Multi Technician carried out UT/MT/PT/RT on 6” to 16” dia pipeline installation for JVPC Rang Dong Project, Offshore Vietnam.

April 02 – May 02 : Global Malaysia Sdn Bhd
Carried x-ray and gamma ray radiography on 8” dia pipe for Semarang, Kecil Development Project in Labuan.

Nov 01 – Mar 02 : Sime Sembcorp (M) Sdn Bhd
NDT Supervisor carried out x & gamma-ray radiography on various size of pipe for Manjung Power Plant Project in Ipoh.

Sept 01 – Oct 01 : Global Offshore M’sia Sdn Bhd
Carried out x-ray radiography on 12” & 14” dia pipeline and riser Installation for SSB F23SW & MU Field Development on barge 264, Labuan.

Apr 01 – Sept 01 : Sime Sembcorp (M) Sdn Bhd
Carried out x & gamma-ray radiography on various size of pipe for Manjung Power Plant Project in Ipoh.

Feb 01 – Mar 01 : Right gas Sdn Bhd
NDT Supervisor carried out x-ray radiography for KL Looping Jalan Bangsar and Damansara.

May 00 – Dec 00 : Hyundai Heavy Industries Co. Ltd
Carried out x-ray radiography Interpreter on 4” and 32” dia pipeline installation For Total South Pars Development Project on Barge HD 2500, Iran.

Apr 00 – May 00 : Fieldwork Engineering Sdn Bhd
Radiography Interpreter carried out gamma ray radiography on 2” to 60” dia pipe For CUF Mechanical Package 3 Project in PAKA, Terengganu.

Dec 99 – Apr 00 : Hyundai Heavy Industries Co. Ltd
Carried out x-ray radiography on 4”, 6”, 8”, 10 & 12” dia Pipeline installation for ONGC CEMP-1 Pipeline Installation Project on Barge HD- 2500, India.

Sept 99 – Nov 99 : Hyundai Heavy Industries Co. Ltd
Carried out x-ray radiography on 36” dia pipe for Yang-Ann Tung.Hsio offshore Project onboard HD 423, Taiwan.

Jun 99 – Sept 99 : Pigas Engineering Sdn Bhd
Carried out x-ray radiography on 2” to 8” dia pipe for EPCC of NGDS To Duta Plaza Project, Jalan Ampang, Kuala Lumpur.

Jun 99 – Sept 99 : Pigas Engineering Sdn Bhd
Carried out x-ray radiography on 2” dia pipe for EPCC to NGDS To Ascott Services Apartment and PNB Services Apartment Project, Kuala Lumpur.


Mac 99 – May 99 : Global Offshore Industries
Carried out x-ray radiography on 24” dia pipe for Pailin Pipeline and Facilities Project on Barge 264, Thailand.

Mac 99 – Mac 99 : RM Top Sdn Bhd
Carried out x-ray radiography for KLCC Project.
Sept 98 – Dec 98 PT Citra Indonesia/Spie Capie
Carried out x-ray radiography on 42” dia pipeline for Tunu GTS5-EPSC2 Project Balik Papan, Indonesia.

May 98 – Aug 98 : Nippon Steel Corporation
Carried out x-ray radiography on 6” to 18” dia pipeline Installation for Pogo Benhamas Project on Barge Kuroshio II, Thailand.

Mac 98 – Apr 98 : Diversified Engineering & Construction Sdn Bhd
Carried out x-ray radiography for NGDS Mandarin Hotel in KLCC Project

Dec 97 – Feb 98 : Torsco Sdn Bhd
Carried out x-ray radiography on 8” to 48” dia pipeline For Putra Jaya District Cooling Project in Kg. Acheh, Lumut.

June 97 – Nov 97 : TL Offshore/McDermott Far East Pte Ltd
Carried out x- and gamma-ray radiography on 8” to 12” Riser and pipeline Installation for Offshore PCSB Saga Kota Kinabalu Project at Teknik Padu Barge.

Apr 97 – May 97 : Sri Takada Sdn Bhd
Carried out gamma-ray radiography Ύ” to 16” pipe
For Multi Product Pipeline Project.

Jan 97 – Mac 97 : KNN-NKK Joint Venture.
Carried out x-ray radiography for 1” to 16”
Pipeline Project, Port Dickson to Port Klang.

Jan 97 - Jan 97 : Ho Hup Construction Co Bhd
Carried out x-ray radiography on 16” dia pipeline for
KLCC Phase II Stage II Project Kuala Lumpur.

Aug. 96 – Dec 96 : Casbina Sdn Bhd
Carried out x-ray radiographer for Senawang Project.


July 96 - Aug 96 : Nusantara Technology Sdn Bhd
Carried out x-ray radiography for Kejuruteraan Gosan
Project.

June 96 – July 96 : Best Sincere Sdn Bhd.
Carried out x-ray radiography for KLCC Chill Water

May 96 - June 96 : Tyco Engineering Construction Sdn Bhd
Carried out x-ray radiography for KLCC Cooling
Tower Project.


Jan 96 – May 96 : PRESCAN SDN BHD
Employed As a NDT Technician for onshore project.
As an Assistant Radiographer for various project in
Kerteh Terengganu.


All Contents Copyright (c) 2014 NDT.org
Use Subject to Terms and Conditions
Phone: 888.278.8804 | webmaster@ndt.org