Certifications
QUALIFICATION

: SPM
: KIMPALAN (IKM)
: MARA/PETRONAS 6GC WELDER .
: ULTRASONIC TESTING 3.1,3.2,3.9
Experience


DESIGNATION NDT LEADER
OCT 2008 TO PRESENT NDE CONSULTANCY & SERVICES SDN. BHD.
CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT OLEFINS TURNAROUND 2009


SCOP OF WORK

● Will be reporting to Third Party TA Manager.
● Fully assist Third Party Supervisor by providing necessary NDT when requested or as specified in SOE.
● To ensure all NDT technicians performing the NDT activities are only Optimal approved personnel.
- To comply with NDT request form update work process.
● To comply with all standard and code as specified in Third Party Contract Document.
● Will manage overall NDT activities for the plant and ensure all NDT will be done within the time given.
● To ensure subordinate understand their role and responsibilities.
● Responsible to compile all NDT report and attach to respective Third Party Inspector reports.
• To ensure all permitting are in order before perform work.
To prepare and monitor equipment and manpower loading (daily)






















DESIGNATION NDT COORDINATOR
NOV 2002 TO SEPT 2008 CAREION TECHNOLOGIST SDN. BHD.


CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT NON ACCESSABLE LOCATION AND RECONFIRMED TML
DRAWING FOR EOG PIPING AREAS.
SCOP OF WORK MONITORING UTTM WORK AT EOG PLANT.


CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT OPTIMAL TURNAROUND 2007
SCOP OF WORK MONITORING ALL WORK ACTIVITIES FOR THE
TURNAROUND 2007 AT ALL PLANT AREAS
( EOG, BUTANOL, UTILITY, DERIVATIVES, OLEFINS )


CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT (PPM/RBI 2007 PROJECT )
SCOP OF WORK MONITORING ALL WORK ACTIVITIES FOR THE
ULTRASONIC TESTING THICKNESS MEASUREMENT AT
EOG , BUTANOL , DERIVATIVES , UTILITY AND OLEFINS
PLANTS.

CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT (PPM/RBI 2006 PROJECT )
SCOP OF WORK MONITORING ALL WORK ACTIVITIES FOR THE
ULTRASONIC TESTING THICKNESS MEASUREMENT AT
EOG , BUTANOL , DERIVATIVES , UTILITY AND OLEFINS
PLANTS.


CLIENT BP PETRONAS ACETYLS
PROJECT BPPA TURNAROUND 2006
SCOP OF WORK MONITOR WORK ACTIVITIES FOR UTFD ,
DPT AND MPI INSPECTION
AT PIPING AND EQUIPMENT.


CLIENT KERTIH TERMINAL
PROJECT KERTIH TERMINALTURNAROUND 2006
SCOP OF WORK MONITOR WORK ACTIVITIES FOR UTFD ,
MPI INSPECTION AT HEAT EXCHANGER,
VESSEL AND TANK.












CLIENT NCB RESOURCES (M) SDN. BHD.
PROJECT TANK 1218 ROOF & STRUCTURE REPLACMENT
AT SHELL REFINING COMPANY, PORT DICKSON.
SCOP OF WORK MONITOR WORK FOR ULTRASONIC FLAW DETECTED
INSPECTION ON THE STRUCTURE AREA.




CLIENT PETLIN (M) SDN. BHD.
PROJECT PETLIN TURNAROUND 2006
SCOP OF WORK CARRIED OUT BORE SCOPE / CCTV INSPECTION FOR
HEAT EXCHANGER, VESSEL, TANK AND REACTOR.




CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT OLEFINS TURNAROUND 2006
SCOP OF WORK CARRIED OUT BORE SCOPE, PMI, FERRITE
AND DPT TESTING AT FURNACE AND
HEAT EXCHANGER AREAS.



CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT DERIVATIVES (PPM/RBI 2005 PROJECT )
SCOP OF WORK CARRIED OUT ULTRASONIC TESTING THICKNESS
MEASUREMENT ON THE DERIVATIVES PIPING AREAS.



CLIENT OPTIMAL CHEMICAL (M) SDN. BHD.
PROJECT OLEFINS UNPLANNED TURNAROUND 2005
SCOP OF WORK CARRIED OUT BORE SCOPE, PMI, FERRITE
DPT AND RT TESTING AT FURNACE AND
HEAT EXCHANGER AREAS.


CLIENT PAKARUJI SDN. BHD.
PROJECT FPG OLEOCHEMICALS (M) SDN. BHD.
SCOP OF WORK CARRIED OUT ULTRASONIC TESTING THICKNESS
MEASUREMENT ON PRESSURE VESSEL, COLUMN,
TANK , HEAT EXCHANGER / TUBE AND PIPING SYSTEM.













CLIENT YONGNAM ENGINEERING SDN BHD
SCOP OF WORK CARRIED OUT UT/MPI/DPI FOR THE YONGNAM PROJECT;
1) PROPOSED CONSTRUCTION OF 1 BLOCK OF TRADE CENTER & SHOPPING MALL WITH 2 BLOCK OF CAR PARK (7STOREYS) AT SUBPARCEL Z9 AND PLAZA Z11 PARCEL Z, PERSINT 1 , PUTRAJAYA ,SELANGOR FOR PUTRAJAYA HOLDINGS SDN BHD .





FEB 2000 TO OKT 2002 DANAMIN TRADE AND SERVICES SDN BHD
DESIGNATION NDT INSPECTOR

CLIENT YONGNAM ENGINEERING SDN BHD
SCOP OF WORK CARRIED OUT UT/MPI/DPI FOR THE YONGNAM PROJECT;
1) MANJUNG – 3 X 700 MW COAL FIRED POWER STATION
CLIENT: LEIGHTON CONSTRACTIONS (M) SDN BHD FOR TNB
.

2) PROPOSED BUTANOL / DERIVATIVES FACILITIES
PROJECT ON LOT M1 KERTEH TERENGGANU .
CLIENT : BECHTEL INTERNATIONAL INC.


3) LUMUT 3 PROJECT
CLIENT : ALSTOM POWER ASIA PASIFIC SDN BHD


4) BOP PIPING FOR TECHNOLOGI TENAGA PERLIS
CONSORTIUM AT PERLIS COMBINE CYCLE POWER PLANT KA 13E2 – 3 LOCATED AT KUALA PERLIS ,PERLIS MALAYSIA


5) AIR INTAKE , EXAUST SYSTEM AND PIPING WORKS FOR
PANGLIMA CCGT POWER PLANT AT KUALA SUNGAI BAHRU ,MELAKA
.

6) FABRICATION OF TURBINE HALL STRUCTURAL
STEELWORK & OTHER ASSOCIATED BUILDINGS FOR
TOSHIBA 350 MW POWER PLANT AT PRAI PENANG .









NOV – DIS 1999 SHAMIRA SDN BHD
DESIGNATION NDT INSPECTOR
CLIENT PETRONAS GPP 5 & 6
SCOP OF WORK CARRIED OUT MPI/DPI FOR THE DPCUTURNAROUND GPP5 & 6 PROJECT AT KG TOK ARUN ,PAKA . TRG.


FEB 99 – OKT 99
DESIGNATION QC INSPECTOR
COMPANY PERMINT ENGINEERING SDN BHD
CLIENT TOYO ENGINEERING CORPORATION
PROJECT AROMATICS PROJECT

SCOP OF WORK REVIEWING PROJECT SPECIFICATION ,
WELDING PROCEDURE OWN INSPECTION AS
PER INSPECTION AND TEST PLANT (ITP)

MATERIAL INSPECTION.
CHECK THE PROCTECTION AND STROGE OF ALL
BULK MATERIAL ON PIPE YARD.

WELDING
CONDUCTING WELDER QUALIFICATION TEST (WQT)
MONITORING AND INSPECT EDGE PREPARATION.
FIT –UP AND WELDING PROCESS AS PER (WP)
PROTECTION FROM INJURIES WEATHER CONDITION
(RAIN AND HEAVY WIND )
PREHEAT (IF REQUIRED)
CHECK CORRECT USAGE OF WELDING RODS
AND ELECTRODE .
VISUAL INSPECTION AFTER FINISHED WELD
CHECK WELDER IDENTIFICATION
REQUEST NDE IF REQUIRED

LINE CHECKING
CHECK SPOOL PIECES FOR CORRECT TYPE OF
MATERIAL AND LINE NUMBER
CHECK ORIFICE FLANGE AGAINS ISO DRAWING
AND INTERNAL FLUSH GRIND
CHECK FLOW DIRECTION AGAINS ISO DRAWING
AND INTERNAL FLUSH GRIND .
CHECK FLANGE SURFACE AND LINE FOR
CORRECT VALVE .
CHECK GASKET TYPE AND VISUALLY INSPECT
GASKET
OVERALL LINE CHECKING BEFORE HYDRO TESTING

DOCUMENTATION
DAILY WELDING VISUAL ACCEPTANCE REPORT
REVIEWING TEST PACKAGE .






AUG 98 – JAN 99 OILFIELD PIPELINE INSPECTION SDN BHD
DESIGNATION NDT INSPECTOR
CLIENT SEED – DDSAL SDN BHD
SCOP OF WORK CARRIED OUT RT ON 36”PIPELINE FOR PGUP LOOP
PROJECT FOR SEGAMAT TO KERTEH PROJECT IN
KUANTAN ,PAHANG.

CLIENT LEIGHTON LAMA (CMB) J/V
SCOP OF WORK CARRIED OUT UT/MPI/RT ON 10” AND20” PIPELINE
INSTALLATION FOR CABOT OFFSHORE TERMINAL
PIPELINE PROJECT ON BARGE LUNAR MURNI IN
PORT DICKSON ,N .SEMBILAN

CLIENT SUKWON IDECHE ENGINEERING (M) SDN BHD
SCOP OF WORK CARRIED OUT UT/RT AT PHS EXPANSION PROJECT IN
KUALA KANGSAR ,PERAK.

CLIENT HANMI SILO ( M ) SDN . BHD .
SCOP OF WORK CARRIED OUT UT AT PHS EXPANSION PROJECT IN
KUALA KANGSAR ,PERAK.

CLIENT BRIDGESTONE ( M ) SDN . BHD .
SCOP OF WORK CARRIED OUT ACFM TEST AT BRIDGESTONE
FACTORY IN SHAH ALAM, SELANGOR .

CLIENT ANSTEEL SDN . BHD .
SCOP OF WORK CARRIED OUT UT FOR THE ANSTEEL FACTORY AT
BANTING ,SELANGOR .

CLIENT LIONS SANKYU TEKKO SDN . BHD .
SCOP OF WORK CARRIED OUT UT AT LPG PUMP SHELTER
AIR – COMPRESSOR IN KLANG, SELANGOR.

CLIENT PESAKA INSPECTION SERVICES SDN . BHD .
SCOP OF WORK CARRIED OUT UT/MPI/DPI/ ON THE EAGLE EYE,
DROWORKS ROOF ,DROWORKS FLOOR AND
ROTARY TABLE AT RIG SEAHAWKS ( OFFSHORE ) .

CLIENT MECHMAR KEEPER ( M ) SDN . BHD .
SCOP OF WORK CARRIED OUT UT/MPI/DPI/ ON THE BOILER AND
VESSEL FOR MECHMAL KEEPER PROJECT
AT SHAH ALAM , SELANGOR .

CLIENT ALGOTECH ( M ) SDN . BHD .
SCOP OF WORK CARRIED OUT RT ON THE 24 “ PIPELINE
AT PORT DICKSON , N .SEMBILAN .







MARCH98 –JULY 98 DANAMIN TRADE & SERVICES SDN BHD
DESIGNATION NDT INSPECTOR

CLIENT VELOSI (M) SDN BHD
SCOP OF WORK CARRIED OUT MPI/DPI FOR THE PETRONAS
REFINERY PROJECT AT SUNGAI UDANG ,MELAKA.





CLIENT YONGNAM ENGINEERING SDN BHD
SCOP OF WORK CARRIED OUT UT/MPI/DPI FOR THE YONGNAM
PROJECT :
1)RETROFITTING OF CONTROL TOWER AT
SINGAPORE CHANGI AIRPORT.

2) PROTON CITY PLANT TANJUNG MALIM ,PERAK
PACKAGE A-3 PAINT SHOP, ENERGY CENTER,
MAINTENANCE CENTER AND FORKLIFT REPAIR
SHOP (PHASE 1)

3) PERAK MANJUNG SIEMEN EXPANSION PROJECT
PL 2 PADANG RENGAS ,PERAK .

4) STEEL STRUCTURE & AIR INTAKE SYSTEM
SIEMENS KWU SANTA RITA. PHILLIPHINES
UNIT 10 ,20 ,30 ,AND 40.

5) STEEL STRUCTURE & AIR INTAKE SYSTEM
SIEMENS – AIR INTAKE SYSTEM FOR LECTRICITY
OF VIETNAM UNIT 10 ,20 .

Applied Technical Services