Evident Ultrasonic Inspection Equipment
resume rifayee

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: India
Status:
I am willing to Travel.
I am on a job and will finish soon.
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
I prefer permanent jobs.
Certifications
Objective and Resume Summary
To be an active member of a reputed organization where there will be ample exposure to input my skills and experience to achieve the organizational goals and also to gather more experience enabling me to improve my knowledge base
Education
A Diploma Mechanical Engineer with ASNT Level-2 in RT, UT, MPT &PT having steady-state experience in construction activities / projects/Shop floor (Static Equipments as well as Piping &Structural) since 1989.
Experience
DETAILS OF PROFESSIONAL EXPERIENCE :

Presently (September 2007 onwards) working with SNAMPROGETTI – EPCC (Eni Group) in Abu Dhabi as Mechanical completion supervisor, for their reputed Ruwais project in Ruwais Near Abu Dhabi. (NGL Gas Plant) for GASCO.Taking care of Mechanical completion & involving pre-commissioning activities as per the planned commissioning schedule of Subsystem & System wise to completing the work. Preparation mechanical completion package & Commissioning Dossier hand over to End-user. Involved in preparation and closing of Punch list items and maintaining its records & certification documents with company database as PCOS (Project completion system) & SICON.

Responsible for coordinating, monitoring all aspects of Mechanical Completion work and reporting to System Completion Manager. Co ordinate with PMC-PMT and internal personnel for site walk down. Prepare & Receive original punch list from discipline Dept head and record them on the punch list record logbook. Assure that the punch lists are entered onto the Mechanical Completion Database; Supply a work printout of the punch list to the discipline Supervisor / subcontractor on request.
Take punch list from file for responsible signature when the job on the field is completed. Maintain updated progress of closed punch list item.

July.2006 to July 2007: Worked as Site Engineer Piping with Consolidated Contractor International company at KGP project (NGL train) for ARAMCO in Dammam, Saudi Arabia. Responsible for site piping fabrication & erection activities. Prior to my deployment to site, I was located at the piping Fabshop to oversee the spool fabrication and to solve engineering problems at source & Coordinate with client Bechtel technip JV.

August.2005 to April 2006 : Worked as Piping supervisor with Bentini-Namfatt Energy JV (EPCC)
at Melut Basin Oil Development Project (Down Stream) Booster station in SUDAN. Responsible for Supervision of piping sub-contractor during fabrication, installation and testing of carbon and stainless process pipe work in accordance with project specifications. Progress reporting and monitoring & solving of construction technical queries. Coordinate with PMC PETRONAS

August 2002 to June 2005: Worked as Mechanical & Piping Supervisor with Bahwan Engineering company in Sultanate of Oman.

Project 1: QALHAT LNG TRAIN –3, Sur, Sultanate of Oman.
Supervision of Mechanical preassembly of internals & installation works to install major process equipment, supporting structures and associated process pipe work. Coordinate with client Chiyoda Foster Wheeler JV.
Supervision of Pre-assembly and erection of equipments i.e. Fired Heater, Air Fin Cooler, Heat Exchanger, Absorber, Process Columns, Vessels and its Internals. Good knowledge in Equipment Plan Drawing, assembly Drawing. Preparing the Equipment Foundation and Packer Plate Setting. Scheduling and Planning of Erection activities. Preparing Riggings plans, mobilizing and allocating works for the site crew, and co-coordinating site related activities with client.
Project 2: DHDS AND SRU for Oman Refinery Co. sultanate of Oman.
Fabrication & Installation of process piping, Raising site generated technical queries and initiating field modifications. Updating piping isometrics to as-built status.Punching of process and utility piping systems prior to hydro-test and Initiation of field modifications if required as per client requirements. Reporting to Project control management personnel for daily and weekly progress, and the scheduling of site based works.
Coordinate with client SK Engineering and Construction, South Korea.
 Prefabrication and erection of pipes with supports.
 Fuel gas and utility piping & pressure parts erection and welding.
 To ensure work to be carried out in accordance with relevant method statements & Project procedures
 To study the drawing for priority fabrication, Erection and testing activity.
 To provide the technical service to the skilled manpower.
 To ensure the availability of sufficient resource to execute the job.
 To plan and monitor construction activity to meet the target on date.
 To execute the piping prefabrication and erection work in all aspects of QC requirement HSE Matters, schedule, and progress.
 Secondary responsibility liaises with and assists the Field Engineering Manager to develop practical resolution to Engineering problems found during the installation work.
 HYDRO / PNEUMATIC TEST
Project 3 : 180 MW Power Plant for Dofar Power Co. at Shalala in Sultanate of Oman
Responsible & involved with Site Inspection activities of Piping materials, prefabricated spools.
 Timely Rendering of Inspection Services.
 Correctness of Inspection services.
 Reporting the conformance of result for acceptable jobs.
 Issuing rejection report for rectification and raising non-confirming report for further resolution in case not rectified as per requirement where the results are not meeting specification.
 Overall record keeping and its monitoring for each of the job inspected to cross check before releasing final acceptance.
 All incoming material inspection, dimension, fit-up, welding NDT, Testing and QA/QC related activities of structural, piping, and its documentation.
 Monitor subcontractor's performance for compliance with quality requirements.
 Identify and raise NCR"s for Non conformities.

September 1993 to August 2002: Worked as various positions as mechanical supervisor. inspection Engineer & Site Engineer with Ell Ess Engineering Pvt Ltd in Mumbai India for various Petrochemical, Chemical &pharmaceuticals plant equipments & Piping works done under the supervision of Technimont ICB Ltd &UDHE India Ltd.

Summary of Major Projects handled in India :-
M/s. Century Chemicals Ltd., Mumbai, M/s. TATA Chemicals Ltd., Gujarat, M/s N.R.C. Ltd., Mumbai, M/s. Kothari Petro Chemicals Ltd., Pondichery, M/s. Orchid Chemicals Ltd., Tamilnadu, M/s. Mradia Chemicals Ltd., Gujarat. M/s. Dr. Reddy’s Laboratories Ltd., Hyderabad. M/s Hindustan Ciba geigy Ltd, Cibatul Ltd, Medicorp Ltd etc.

• Development of vendors for fabrication of various equipments like Pressure vessel, Heat exchanger, reactor, Mixer, Autoclave, Filters, Separators etc. Planning & scheduling of fabrication activities to ensure timely completion of the equipment.
• Fabrication and erection of CS, SS, Alloysteel, CS with Rubber lined,&GRE in plant piping done in various chemical &Pharmaceutical industries.
• Steam & Condensate Piping, Cold & hot water Piping, Flue duct & exhaust chimney.
• Erection of Rotary & static Equipments and its alignment
• Direct control over fabrication & erection of Piping for Various systems.
• Planning & arranging day to day activities Coordination with client, consultant & vendor

October 1991 May 1993: Worked as Mechanical supervisor with Asmak Engineering company in Tirunelveli.Responsible for machining components related for coir &paper plant machinery.
September 1990 to September 1991
Employer : Kattabomman Transport corporation
Position : Apprenticeship Training as Technician for State transport corporation,Tamilnadu
September 1989 to August 1990: Worked as Site supervisor with Geetha Enterprises in Tuticorin for 210 MW Thermal power plant construction & shutdowns. Responsible for Piping work with the boiler.

Other Experience :-
1. Exposure MS Office in preparation of Engineering Documents.
2. Extensively traveling in world for execution purposes.
3. Maintenance of different types of valves used in process piping.