NDT.org

NDT.org : Resumes : Welding Inspector


Posted: 9/7/2009 1:08:36 AM
Resume Header/Title:

Welding Inspector

Country:

Malaysia

Extra Info:

I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.

 Login for contact information.
 
 
 
 
 
 
Certifications:

PCN WELDING INSPECTION LEVEL II

Education:

DEGREE IN MECHANICAL ENGINEERING UTHM
DIPLOMA IN MECHANICAL ENGINEERING UTHM

Experience:

Working / Training History
1.Company Name :PFCE Sdn.Bhd / Kejuruteraan Sri Lambaian (KSL)

Position :Supervisor

Date Joined :5 May 2009 Date Left:End of shutdown
(12 July 2009)

Location:OPTIMAL CHEMICAL SDN.BHD (KERTEH), TERENGGANU

Title of job :Acetylene Reactor Improvements, Dost project Tie in installation, Re-Route Sampling Point, MP Condensate to Coalescer piping/valve bypass, Decanter Bottom Piping improvement & Replace butterfly valve to Globe Valve

Work Description
a)Prepared copy of job package for all leader including Job Safety Analysis (JSA), Job Method Sheet (JMS), Equipment Isolation Sheet (EIS) for blinding/de blinding line, P & ID Drawing & Isometric Drawing

b)Monitor seven ( 7 ) person work leader (Each group have 6 person)

c)Completed progress & daily report to submit for general supervisor & manager.

d)Prepared & submit manpower total daily Report

e)Prepared temporary equipment for manpower (Word & Excel)
f)Completed document attachment for permit, lifting using crane & hot work permit
g)Make sure all properties for Joint Integrity Team (JIT) applied and as a contractor witness for tighten stat bolt at all control valve.
h)Also involve in inspection line for Radiography Testing (RT), Dye Penetration, Hydro test & Pressure test for joint welding.
i)Arrange for permit request. [ Vehicle Entry, Cutting, Grinding welding, confine space (hot work) & various task of cold work].Lorry & tolls, equipments inspection
j)Monitor to remove stat bolt, check tagging/LOTO, Rigging using chain block, level block and lifting using crane.
k)Monitor Touch-up painting, fire proofing & Grouting
l)Completed fire proofing at piping structure & New Foundation Concrete
m)To make sure are correct Red Tag Master (RTM), Review PSSR & Return To Operation (RTO)

2.Company Name :Arashins Services Sdn.Bhd
Position :Work Leader
Date Joined 14 march 09 Date Left:End of shutdown (24 March 09)

Location : EXPORT TERMINAL KEMAMAN TERENGGANU (ET), PETRONAS GAS BERHAD (GPP A) & VINIL CLORIDE (M) SDN.BHD (VCMSB)
Title of job:Remove, service and install control valve

Work Description
a)Arrange for permit request. [ Vehicle Entry, Cutting, Grinding welding, confine space (hot work) & various task of cold work].Lorry & tolls, equipments inspection
b)

c)Monitor to remove stat bolt, check tagging/LOTO, Rigging using chain block, level block and using crane.
Service valve & actuator overhaul and install 7 unit control valve (Globe valve, Fisher, 2” rating 300-6” rating 600psi) including stroke test.

d)Make sure all properties for Joint Integrity Team (JIT) applied and as a contractor witness for tighten stat bolt at all control valve.

e)Also involve in painting job, instrument tubing installation & stroke test.

f)Meeting for Job Safety Analysis


3. Company Name : Eagle Burgmann Sdn. Bhd
Position : Work Leader
Date Joined : 2 March 09 Date Left : 13 March 09
Location : PETRONAS GAS BERHAD (GPP B / 5& 6) KERTEH
Title of job : Seal pot system for cryogenic Pump (7 Unit smart transmitter)
Work Description a) Arrange for permit request. . [Vehicle Entry & Installation tubing and transmitter]. Lorry & tolls, equipments inspection
b)

c) Install ˝” stainless steel pipe and flange already pre fabrication at yard. Tighten stat bolt. Remove existing and install new system line
Installation transmitter for calibration
d) Install bracket, nitrogen gas and tubing from nitrogen line to transmitter system. Refill pressure inner seal pot
e) Refill and drain liquid lubricant (barrier liquid with pump)

4. Company Name : Arashins Services Sdn.Bhd
Position : Work Leader
Date Joined : 1 February 2009 Date Left : 7 February 2009 (End of Shutdown)
Title of job : Remove, service and install control valve
Location : PETRONAS GAS BERHAD (GPPA DPCU-2 / KCS) KERTEH
Work Description a) Arrange for permit request.
b)

c) Monitor to remove, service valve & actuator overhaul and install 28 unit control valve (Globe valve, Fisher, 1”-20” rating 300-800psi) including stroke test.
d) Make sure all properties for Joint Integrity Team (JIT) applied and as a contractor witness for tighten stat bolt at all control valve.
e) Also involve in painting job & instrument tubing installation.

5. Company Name : Mushtari Engineering Trading Sdn. Bhd (METSB)
Position : Safety Supervisor
Date Joined : 17 Nov 2008 Date Left : 4 Dec 2008 (End of project)
Title of job : Cutting, Grinding & Welding for valve replacement
Location : PETRONAS GAS BERHAD (GPP B / 5& 6) KERTEH
Work Description a) Involve in Cutting, Drilling, Grinding and Welding, Painting, Non Destructive Testing (NDT) Dye Penetration for installation additional pipe support.
b)
Handle daily tool box meeting and make sure all working activity in safe condition and relevant for that job.
c) Involve in job preparation (Mobilization, demobilization, manpower loading, equipment & tools)
d) Joint JSA approver Meeting & Liaise with client for job request
Permit settlement, vehicles inspection.

6. Company Name : Arashins Services Sdn.Bhd
Position : Work Leader
Date Joined : 8 Nov 2008 Date Left : 16 Nov 2008 (End of Shutdown)
Title of job : Remove, service and install control valve
Location : PETRONAS GAS BERHAD (GPP A. GPP4) KERTEH
Work Description a) Involve in Cutting, Grinding and Welding, Painting, Non Destructive Testing (NDT) Dye Penetration & Radiography Testing (RT).
b) Involve/Arrange work leader for permit request & firewatcher for GPP A shutdown.
c) Joint job safety analysis (JSA) approver Meeting & Liaise with client for job request.

7. Company Name : Mushtari Eng. Trading Sdn.Bhd./ Dolphin Supply & Service Sdn.Bhd / Triple Valient Eng. Sdn.Bhd
Position : Leading Work Leader
Date Joined : 21 May 2008 Date Left : 31 July 2008 (End of Shutdown)
Work Description : Involve in Cutting, Grinding and Welding, Painting, Hydro test, Post Weld Heat Treatment (PWHT), Non Destructive Testing (NDT) Dye Penetration, Ultrasonic testing (UT), Radiography Testing (RT) & Insulation.
Location : ETHYLENE POLYETHYLENE MALAYSIA SDN.BHD KERTEH (EPEMSB)
a) Involve/Arrange work leader for permit request & firewatcher for EPEMSB shutdown.
b) Joint JSA approver Meeting & Liaise with client for job request
c) Involve in job preparation (Mobilization, demobilization, manpower loading, equipment & tools)
d) Prepare timesheet, arrange gate pass and complete general task

8. Company Name : Allisons Engineering Services Sdn.Bhd
Position : Project Engineer
Date Joined : May 2006 Date Left : May 2008
Work Description a) Responsible on project preparation (Costing) and on going project.
b) Dealing with suppliers main contractor and client for the project.
c) Dealing with supervisor and manpower.
d) Preparation paper work and service report of the project
e) Conduct /Monitor job until complete including timesheet preparation.
f) (Start from Site visit, estimate costing, manpower loading, briefing session, equipment rental, tools, consumables, meals, PPE preparation, advance/salary, consumables & monitor until job completed)

9. Company Name : Allisons Engineering Services Sdn.Bhd, Paka Terengganu
Position : Admin Executive
Date Joined : February 2006 Date Left : Continue new position
Work Description a) All mechanical job Prepare Costing project and supervise manpower at site.
b) Management, finance and handle the general account.

10. Company Name : San-Ichi Asia Parsific, Taman Austine Perdana, Johor Bharu
Position : Junior Engineer
Date Joined : Nov 2005 Date Left : February 2006
Work Description : Prepared the design and methodology to design mould casing and monitor
Molding process.

11. Company Name : MSET Shipbuilding Sdn.Bhd Kuala Terengganu
Position : Practical Trainee- Maintenance Department
Date Joined : 11 April 2005 Date Left : 18 June 05
Work Description : Overhaul 200 hp engine boat, underwater fitting, maintenance of police Ship, marine ship, machining etc.
Involved in construction Tanjung Huma Ship at Pulau Duyong



Project Track Record Supervision while in Allisons Engineering Services Sdn.Bhd


Month Job Description Client Main contractor
Sept 05 Scaffold Erection / Dismantling Petronas Ammonia Sdn.Bhd T.K.E Sdn.Bhd
Sept 05 Fabricate wooden Box For Mechanical Parts Global Process System Global Process System
Sept 05 Fabricate 3 Units Mercury Containers Petronas Carigali Sdn.Bhd PBJV Engineering Sdn.Bhd
Sept 05 Supply Work Leader at EPEMSB Ethylene Malaysia Sdn.Bhd Berlimo Sdn.Bhd
Dec 05 Organized NPSP Course for 10 Persons NIOSH Terengganu Sing Liang Ping Sdn.Bhd
Dec 05 Installation Mainhole at Kerteh Port Petronas Kerteh Port Sdn.Bhd Kerteh Resources & Tech Sdn.Bhd
Jan 06 Supply Fire Watcher For CUF Plant CUF Sdn.Bhd Tenaga Masshor Sdn.Bhd
Jan 06 Supply Work Leader & Semi skill fitter Petronas Carigali Sdn.Bhd Complete Oilfield Stimulation Serv. Sdn.Bhd
Feb 06 Supply SO, FW & CS Workers Petronas Ammonia Sdn.Bhd Petrochemical & Power Plant Sdn.Bhd
Feb 06 Supply And Fabricate Steel Hose Reel Box Esso Malaysia JCE Supply & Services Sdn.Bhd
Feb 06 Supply Safety Attendance Optimal Chemical Sdn.Bhd UBF Maintenance Sdn.Bhd
Feb 06 Supply Mechanical fitter Vinyl Cloride Malaysia Sdn.Bhd Tenaga Masshor Sdn.Bhd
Apr 06 Scaffold Erection / Dismantling Gas Processing Plant
( GPP 2 ) R.M Leopad Sdn.Bhd
Apr 06 Supply CSE manpower Petronas Penapisan Sdn.Bhd Felda Prodata Sdn.Bhd
May 06 Scaffold Erection / Dismantling Petronas Gas Berhad R.M Leopad Sdn.Bhd
May 06 Supply Work Leader at EPEMSB Ethylene Malaysia Sdn.Bhd Pasca Bina Sdn.Bhd
June 06 Rental Portable Toilet Petronas Gas Berhad Tyansu Energy Sdn.Bhd
June 06 Supply manpower Confine Space Gas Processing Plant
( GPP 5,6 ) Tenaga Masshor Sdn.Bhd
June 06 Supply hole watcher Vinyl Cloride Malaysia Sdn.Bhd Tenaga Masshor Sdn.Bhd
Oct 06 Supply firewatcher Vinyl Cloride Malaysia Sdn.Bhd Tenaga Masshor Sdn.Bhd
Oct 06 Supply mechanical Fitter & Work Leader Ethylene Malaysia Sdn.Bhd Petrochemical & power plant Sdn.Bhd
Nov 06 Remove and replace pump skid & motor blade Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Nov 06 Overhaul water pump Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Nov 06 Repair Water Tank Leakage Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Replace Galvanized Spool Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Service One Unit Motor Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Remove and replace chequer Plate Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Remove and Replace new motor Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Service Non Return Valve Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Dec 06 Supply hole watcher Vinyl Cloride Malaysia Sdn.Bhd Tenaga Masshor Sdn.Bhd
Dec 06 Supply mechanical Fitter & helper Ethylene Malaysia Sdn.Bhd Petrochemical & power plant Sdn.Bhd
Dec 06 Fabricate Drainage Tray Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
May 06 C3003 Column Cleaning
(PDH Plant, Gebeng)
Petronas MTBE, Gebeng Tanjung Kerteh Engineering Sdn.Bhd
Jan 07 Repair & Service plumbing system & floor tiling – Kitchen area
Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Jan 07 Remove and replace ducting Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Jan 07 Service and refill fire extinghuser Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Jan 07 Replace frame walkway Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Feb 07 Service, repair & replace valve at swimming pool Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Feb 07 Repair Cooling Coil Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Mar 07 Remove fin and replace G.I Plate Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Apr 07 Fabricate and supply wind Breaker Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Apr 07 Supply & Install Sink Water mixer Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Apr 07 Overhaul Condenser pump Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
May 07 Painting Compressor House Petronas Gas Berhad Tyansu Energy Sdn.Bhd
May 07 Supply manpower (Safety Work Permit & Safety Attendant)
Optimal Chemical Sdn.Bhd Petrochemical & power plant Sdn.Bhd
May 07 Replace Gate Valve 4" Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
May 07 “Naik Taraf Longkang – Jln K.Trg-Kuantan” Project JKR Terengganu Permai Unggul Sdn Bhd
May 07 “Membina Jambatan – Pusat Sains Kreativiti Chendering” Project
IDH Venture Sdn Bhd Usaha Cekal Bina Sdn Bhd
June 07 Supply Safety Supervisor Petronas Penapisan Sdn Bhd Rekayasa Indusri Malaysia
July 07 Drainage Construction Petronas Penapisan Sdn Bhd Rekayasa Indusri Malaysia
July 07 Mainhole Construction Petronas Penapisan Sdn Bhd Rekayasa Indusri Malaysia
July 07 Collection Pit Construction Petronas Carigali Sdn Bhd Pasca Bina Sdn Bhd
July 07 Repair Drainage
Repair Mainhole Leaking
Upraise Mainhole Petronas Gas Terengganu Sdn Bhd Pasca Bina Sdn Bhd
Sept 07 6” Butterfly Valve and Non Return Valve (Jacuzzi) Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Sept 07 Construct 4 Unit Fondation Monkey Ladder Petronas Gas (GPP B) Arashin Services Sdn Bhd
Oct 07 6” Butterfly Valve and Non Return Valve (Waterfall) Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Repair Leaking Pipe Underground Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Replace 2 Unit 6” Gate Valve Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Service And Cleaning Underground Sewage Tank Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Repair 2 Unit Pump at Golf Area Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Fabricate Railing at Swimming Pool Area Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Replace Roofing at Awana Maintenance Workshop Office Awana Kijal Golf Beach & Spa Resort Awana Kijal Golf Beach & Spa Resort
Oct 07 Supply Manpower (S.A & S.W.P) at Optimal Site Optimal Chemical (M) Sdn Bhd Petro Chemical & Power Plant
Jan 08 Install Slapper & Construct Walkway Ethylene Polyethylene (M) Sdn Bhd Pasca Bina Sdn Bhd
Mar 08 Construct Additional Multi Purpose Hall Petlin (M) Sdn Bhd TMM Engineering Sdn Bhd
April 08 Construct and installation structure PBJV Yard PBJV Group Sdn.Bhd Pasca Bina Sdn Bhd
May 08 Construct and installation structure Muzrah Eng. Yard Muzrah Eng. Sdn.Bhd Pasca Bina Sdn Bhd




Working Track Record Supervision while in contract basis

Month Job Description Client Main contractor
May – July 08 Replace various valve, spool pipe, steam drain & NDT Job Ethylene Malaysia Sdn. Bhd (Shutdown 2008) Mushtari Engineering Trading Sdn. Bhd
July 08 Insulation Job Ethylene Malaysia Sdn. Bhd (Shutdown 2008) Triple valiant Sdn.Bhd
Sep 08 Structure Installation T.C.O.T Dayang
Nov 08 Cutting & Grinding to replace valve, gasket, flange, elbow & pipe
(Turn around 2008) Gas Petronas Processor A
(GPP 4 Shutdown 2008) Arashins Sdn.Bhd
Nov 08 Install additional pipe support for absorb heavy vibration problem at platform & structure support Gas Petronas Processor B
(5,6) Mushtari Engineering Trading Sdn. Bhd
Feb 09 Remove, services & Install Control valve Gas Petronas Processor A
(GPP 2 Shutdown DPCU & KCS) Arashins Sdn.Bhd
March 09 Instrument-Install transmitter and replace tubing for nitrogen replacement Gas Petronas Processor B
(5,6) Eagleburgmann Sdn.Bhd
March 09 Remove, Service and Install Control Valve Export Terminal Shutdown
(March 2009) Arashins Sdn.Bhd
April 09 Install HCO2 Tank Gas Petronas Processor A
(GPP 2 & 3) Arashins Sdn.Bhd
April 09 Replace Concrete Slab Vinil Cloride Malaysia Sdn.Bhd (VCM) Arashins Sdn.Bhd
May- July 09 Tie In Piping Project For sphere Tank Optimal Minor Project/Shutdown. Plant Technical Service (PTS) Optimal Chemical Sdn.Bhd PFCE Sdn.Bhd/ Kejuruteraan Sri Lambaian Sdn.Bhd (KSL)

Comments:

PROVEN


All Contents Copyright (c) 2014 NDT.org
Use Subject to Terms and Conditions
Phone: 888.278.8804 | webmaster@ndt.org