NDT TECHNICIAN
NDT.org Member Since: 2009
Added: 11/11/2009
Last Updated: 11/11/2009
State:
LA Louisiana
Country:
United States
Status:
I am willing to Travel.
I need a job as soon as possible.
I am willing to work overseas.
I prefer permanent jobs.
Certifications
Recently completed an NDT course at Louisiana Technical College which encompasses five disciplines: Visual Inspection, Ultrasonic Testing, Magnetic Particle, Liquid Penetrant and Radiography Testing based on Level 1 and Level 2 coverage in compliance with SNT-TC-1A and CP-189 standards. Awarded Certificate of Appreciation from the 9th Annual NDE Workshop by New Orleans section of ASNT for hands-on application of NDE Techniques used in industry mostly in the area of calibrating of NDT equipments like (UT)—DMS 2, 37DL Plus, USN 58L, Epox XT etc. Currently level one, but in progress for certifications both levels 1 and 2. Prior to this new career shift, worked for an Architectural and Engineering company. Also trained in design and drafting with (Auto Cad) systems.
Education
EDUCATION: Louisiana Technical College (Certificate Program- NDT-5 Disciplines), CAD Concept Inc. (Auto CAD Certificate), Technological Institute of the Philippines (BS Architecture). ASNT (Certificate of Appreciation for hands-on application of NDE Techniques used in industry
Experience
EMPLOYMENT HISTORY:
STUPP CORPORATION: Baton Rouge LA, Sept. 2009
(NDE Level 1): World premier producers of custom steel line pipe to the energy industry. Responsibilities include but not limited to ensure that all prime pipes meet specifications. To achieve this, some of the methods performed are specific calibrations, UT thickness reading, UT shear wave, visual inspection of pipe OD, ID, bevels and weld full length for any indications. Also perform dimensional checks like; wall thickness, trim groove, diameter, straightness, squareness, roundness or ovality of the pipe according to Stupp specs 5 L-0006 (API)
PSI (Engineering, Consulting, Testing) CO. Jefferson LA, July 2009 – August 2009
(NDE Trainee): Temporarily did a job for a span of few weeks before the assignment ended. Duties included but not limited to complete extensive VT and analysis on welds for steel frames and structures of buildings. Also I participated in the use of Non Destructive Testing in evaluating the usefulness for identifying indications or cracks by performing MT and PT on the reinforcement steel bars for New Orleans levee barrier being constructed presently by Cajun Construction Co.for Army Corp. Engineers.
DELTACOM INC. Baton Rouge, LA July 2005 – Dec 2008
(Sr. Account Executive): Delta Com is a full communication companies with integrated Telecom Voice, Data and internet connectivity that incorporates the power of phone systems, printer and laptop. Due to this array of products and services, my position demands various categories of business clienteles. I was responsible for establishing new accounts as well as maintaining the existing, ranging from small to large size businesses. My approach was to consult with the clients to evaluate their potential needs.
IONEX TELECOM INC. Dallas TX June 2000 –May 2005
(Account Executive): Generated new accounts through consultative selling and targeting the potential market share as well as expanded the existing account by big margin. I was also responsible for consulting and evaluating client’s needs. Coordinated the installation of the products such as T-I
DYNAMIS INC. (A division of Kirby Company) Dallas, TX May 1993 –June 2000
(Sales/Management) Promoted new products as well as increased sales of the existing product line. Successfully hired, trained and managed 15 sales representatives also maintained an excellent closing ratio, which produced revenue growth. Top Achiever: (Five diamond medallion), a prestigious sales award
DELCON INC. (Architectural and Engineering CO): April 1991 –May 1993(Intern Architect): Consulted with clients to determine functional and spatial requirements of new structures or renovations. Partnered in design concept and execution of working drawing. Planned layout of projects and integrated engineering elements into unified design for clients’ review and approval. Served as a project site coordinator.
Comments
To achieve complete inspection, some of the methods performed are specific calibrations, UT thickness reading, UT shear wave, visual inspection of pipe OD, ID, bevels and weld full length for any indications. Also perform dimensional checks like; wall thickness, trim groove, diameter, straightness, squareness, roundness or ovality of the pipe according to Stupp specs 5 L-0006 (API)