multi-technician ndt inspector / rope access operator
NDT.org Member Since: 2010
Added: 8/22/2010
Last Updated: 12/4/2012
Country:
Malaysia
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
I prefer permanent jobs.
Certifications
PCN Level 2 Ultrasonic Testing (PCN no: 306483)
PCN 3.4 Radiographic Interpreter (PCN no: 306483)
CSWIP Level 2 Liquid Penetrant (Weld) (CSWIP no: 62664)
IRATA Level 1 Rope Access (IRATA No: 1/31235)
ASNT (UT, MT, PT) by SGS Petrotechnical Inspection Services (M.) Sdn Bhd
Radiation Protection Supervisor (RPS) and ASNT RT by Oceaneering International GmbH.
NIOSH Oil & Gas Safety Passport OGSP (Cert No: OG004217 J)
MSTS Asia Safety Training. BOSIET, OLF modules, EBS & travel safety by boat OPITO approved (Cert. No: 045605)
MSTS Asia Safety Training. Confined Space Entry (Cert No: 4122510)
MSTS Asia Safety Training. H2S Breathing Apparatus (Cert No: 4127576)
Education
1) Ministry Of Education Malaysia (SPM O Level Gred 3)(Ref.No.: SM72350IG)
2) School Of Audio Engineering Institute International Malaysia-Diploma in Audio Technology (Diploma Ref. No.: 102854)
Experience
6 years of industrial experience in various positions at field/ offshore/ workshop, NDT Inspector/ NDT Technician personnel qualified with focus on Quality Analysis and Quality Controlling supervising and coordinating in oil & gas and petrochemical production and construction sector. Involved in multi-disciplined NDT (UT/ RI/ RT/ MT/ PT/ Hardness Testing and Visual) method and Rope Access jobs in various project.
Advance in fabrication and in-service inspection. Welding inspection, UT thickness gauging survey, coating inspection, shutdown inspection, off line inspection, corrosion survey, field inspection and radiography testing and film review of welds. Identify lines from ISOs, P&IDs creating full system isometrics and inspection report.
Offshore production/ injection FPSO of risk based inspection in Ultrasonic, Radiography, MPI, DPI, Visual and Hardness Testing of structure, lifting beam, vessels, piping, flare units, gas lift units, hydrocyclone system, riser units, mooring system etc, several inspection of confined space in engine room with UT and MPI testing of sea chest units.
Onshore welding, structural, piping and mechanical works of welding inspection according to the client procedure specification, drawing, international standard codes for fabrication workshop in pipe mill manufacturing and fabrication yard for offshore jacket, topside and module.
Various inspection and testing of NDT procedure for installation/ maintenance/ repair for refineries and power plant shutdown and turnaround.
Worked with various major clients e.g. Chevron Angola, SBM Monaco, Petronas Carigali, Shell Brunei, Chevron Australia, ONGC & Sime Darby Engineering, Saipem France, Larsen & Toubro Limited, Total Fina Elf and Malaysia Marine Heavy Engineering & Technip.
Familiar with ASME, AWS, API, BS, EEMUA, EN, PTS international standard code and clients procedures also (under ABS, GL ,BV and DNV regulations).
Presently working with a UK based competitive Inspection company (OCEANEERING) as Multi NDT Inspector with Rope Access in Angola (Chevron Project) SBM FPSO Kuito. (From 2012 May.)
A ) ( Contract basics )
Employer :SGS Petrotechnical Inspection Services (M.) Sdn. Bhd. Industrial Division.
Date Jointed :September 2011 May 2012
Position :Radiography Interpreter / Engineering Inspector
Main-cont :Erndtebrucker Eisenwerk GmbH & Co.Kg ( EEW. Malaysia ) SAW Carbon Steel Pipe Mill Manufacturing Workshop.
Location :Tanjung Langsat, Pasir Gudang, Johor.
Project :SHELL BULAN
Date :October 2011 December 2011
Client :SHELL BRUNEI
Project :NASR AND UMM LULU DEVELOPMENT PROJECT PHASE 1
Date :November 2011 December 2011
Client :Petromac (ADMA-OPCO)
Project :3 Gas Compressor Station Project (Dasht,Parchin,Semnan)
Date :November 2011 December 2011
Client :Sekaf Technical & Contruction Co.
Project :Flare Tower to Gudrun Project
Date :November 2011 December 2011
Client :Norsk Stall
Project :LPG/LDHP
Date :November 2011
Client :Chevron Australia Pty Ltd
Project :LPG/LDHP
Date :November 2011 December 2011
Client :GENOYER PHOCEENNE
Project :MURPHY SERENDAH & PATRICIA
Date :October 2011 November 2011
Client :MITCO
Project :Patricia Satellite (PT-SA) Substructure for SK309/311
Date :October 2011 November 2011
Client :MITCO
Project :Conductor Pipes
Date :October 2011 November 2011
Client :Edgen Murray Pte Ltd
Project :TOTAL OFON 2 Bracing
Date :September 2011 October 2011
Client :Saipem France
Project :GSPC PLQP (FLARE BRIDGE PART 1 & 2), PLQP JACKET MAIN LEG, SKIRT SLEEVE & TGBM
Date :September 2011 October 2011
Client :Larsen & Toubro Limited
Project :Tipiel Project, Columbia Pile
Date :July 2011 September 2011
Client :Commercial Tubi Acciaio
B ) (Freelance basics)
Employer :Danamin Sdn. Bhd.
Duration :July / 11 / 2011 July / 18 / 2011 ( 8 days )
Project :Outage Unit 10 1st turnaround 2011
Client :Malakoff Corporation Berhad.
Location :Tanjung Bin Power Plant, Pontian, Johor.
Position :Multi-Disciplined NDT Technician ( UTTG / MT / PT )
C ) ( Contract basics )
Employer :SGS Petrotechnical Inspection Services (M.) Sdn. Bhd. Industrial Division.
Date Jointed :July 2009 June 2011 ( 24 months )
Position :UT Inspector / Engineering Inspector ( RI / MT / PT )
Main-cont :Erndtebrucker Eisenwerk GmbH & Co.Kg ( EEW. Malaysia ) SAW Carbon Steel Pipe Mill Manufacturing Workshop.
Location :Tanjung Langsat, Pasir Gudang, Johor.
Project :Paradip IOCL Refinery - Pipeline
Date :March 2011 Present
Client :Larsen & Toubro Limited
Project :Global Tech 1 Offshore Wind Turbine Pile / Tripod
Date :March 2011 Present
Client :ARGE Tripod Global Tech 1
Project :PGB LNG Regasification - Bracing
Date :February 2011 Present
Client :Muhibbah Engineering
Project :Cheviot Cosco - Pile
Date :Dicember 2010 February 2011
Client :Octabuoy 20101009
Project :Petrofac Berantai Bracing
Date :November 2010 February 2011
Client :Mitco Japan Sdn. Bhd.
Project :GSPC - Pile
Date :October 2010 December 2010
Client :Deen Dayal Field Development
Project :Topaz Project Plem Top Up Bracing
Date :October 2010
Client :Activia International ( PTE ) LTD
Project :Hamenan & Bijar Gas Compressor Station - Pipeline
Date :September 2010 November 2010
Client :Shima Farmand Company
Project:Darsht, Parchin & Semnan Gas Compressor Station - Pipeline
Date :September 2010 November 2010
Client :Sekaf Technical & Construction Company ( Sekaf TCC )
Project :Gorgon Barrow Island LNG Jetty Project Pile / Cone
Date :September 2010 March 2011
Client :Saipem France
Project :MHN Process Platform + LQ Project ( Phase 2 ) - Pile / Leg
Date :September 2010 November 2010
Client :Larsen & Toubro Limited
Project :MHN RD 4WPP Project Pile / Bracing / Leg
Date :September 2010 November 2010
Client :Larsen & Toubro Limited
Project :B193 5 Wellhead Platform ( 2nd Batch ) Pile / Jacket
Date :September 2010 January 2011
Client :Sime Darby Engineering & ONGC
Project :Gorgon Barrow Island LNG Plant Pile / Leg / Cone
Date :August 2010 February 2011
Client :Saipem France
Project :ICP-R Process Platform Jacket / Leg / Bracing
Date :August 2010 October 2010
Client :Afcons Gunanusa Joint Venture
Project :MHN RD 4 Well Platform ONGC - Jacket / Leg
Date :August 2010 October 2010
Client :Larsen & Toubro Limited
Project :MHN Proceed Platform & LQ ( MNP TG Building ) Jacket / Leg
Date :July 2010 September 2010
Client :Larsen & Toubro Limited
Project :Tank Terminal Johor - Pipeline
Date :July 2010 September 2010
Client :Symon Global & Kim Seng Huat
Project :Berth A 1 Project at Jamnagar Pile
Date :July 2010
Client :Reliance Ports & Terminal Limited
Project :MHN Pipelines & Modification Supply Of Tubular - Bracing
Date :June 2010 July 2010
Client :Supreme Offshore Contruction & Technical Services Ltd.
Project :Ujung Pangkah Development Offshore Phase2 (CCP & AUP EPCC ) Jacket / Leg / Bracing
Date :June 2010 August 2010
Client :Edgen Murray Pte. Ltd.
Project :MHN Process Platform + LQ ( MNP TG Building ) Jacket / Leg
Date :March 2010 June 2010
Client :Larsen & Toubro Limited
Project :MHN Process Platform + LQ Project - Jacket / Leg / Bracing
Date :March 2010 June 2010
Client :Larsen & Toubro Limited
Project :MHN Platform + LG Pipelines & Modification - Pipeline
Date :March 2010 May 2010
Client :Larsen & Toubro Limited
Project :ONGC B193 5 Wellhead Platform Pile / Leg
Date :February 2010 February 2011
Client :Sime Darby Engineering & ONGC
Project :Kinabalu Jacket / Leg
Date :January 2010 April 2010
Client :Malaysia Marine Heavy Engineering & Technip
D ) ( Freelance basics )
On Call Job Request
Employer :SGS Petrotechnical Inspection Services (M.) Sdn. Bhd. Industrial Division.
Duration :December / 17 / 2009 December / 20 / 2009 ( 4 days )
Client :PETRONAS Dagang Berhad.
Location :PETRONAS Dagang, West Port, Port Klang, Selangor.
Project :Provision of Inspection & Corrosion Monitoring Service
Position :UT Technician / Rope Access
Project Involved of EEW Malaysia
July 2009 March 2010 ( 9 months )
Project :Gajah Baru Jacket / Leg
Date :December 2009 March 2010
Client :PETRONAS Carigali Sdn. Bhd.
Project :Water Pipeline
Date :November 2009 February 2010
Client :Pantech Corporation Sdn. Bhd.
Project :Pipeline
Date :November 2009 January 2011
Client :Mc. Junkin Redman Corporation
Project :Yetagun Phase 4 Development Project- Jacket / Leg
Date :October 2009 December 2010
Client :Edgen Murray Pte. Ltd.
Project :MHN Platform Process Jacket / Leg
Date :September 2009 April 2010
Client :Larsen & Toubro Limited
Project :Turkmenistan Block 1 Gas Development Project - Pile
Date :August 2009 December 2009
Client :Malaysia Marine Heavy Engineering & Technip
Project :Offshore Wind Turbine Pile / Tripod / Leg
Date :July 2009 May 2010
Client :BARD I OWF
E ) ( Freelance basics )
Employer :WIRA Adventure Sdn. Bhd.
Date jointed :June / 04 / 2009 June / 28 / 2009 ( 25 days )
Client :Mesiniaga Berhad.
Location :1A Jalan SS16/1, 47500 Subang Jaya Selangor.
Project :Window Cleaning Services Menara Mesiniaga.
Position :Rope Access Window Cleaner.
F ) ( Contract basics )
Employer :SGS Petrotechnical Inspection Services (M.) Sdn. Bhd. Industrial Division.
Duration :February 2008 November 2008 ( 10 months )
Client :Bangchak Petroleum limited ( BCP )
Location :Phra Khanong District, Bangkok, Thailand.
Project :BCP Refinery Process Piping Revamp
Position : UT Crosschecker / NDT Inspector
G ) ( Freelance basics )
Employer :Shamira Sdn. Bhd.
Duration :October 2007 December 2007 ( 3 months )
Client :Ishi Power Sdn. Bhd.
Location :Tanjung Bin Power Plant, Pontian, Johor.
Position :UTFD Technician
H ) ( Contract basics )
Employer :SGS Petrotechnical Inspection Services (M.) Sdn. Bhd. Industrial Division.
Duration :November 2006 August 2007 ( 10 months )
Client :Sime Engineering & Sino Hydro Corporation
Location :IMPSA (M.) Sdn. Bhd., Lumut, Perak.
Project :Bakun Hydro & Macagua Hydro Power Generation Modification
Position :Multi-Disciplined NDT Technician
I ) ( Contract basics )
Employer :Arashins Services (J.) Sdn. Bhd. ( Seconded to Sime Darby Sdn. Bhd. )
Duration :February 2006 September 2006 ( 8 months )
Client :Saibos Akogep / Total Fina Elf ( EPNL )
Location :Teluk Ramunia Yard, Johor.
Project :Amenam / Kpono Oil & Gas Export Project (AMP2 Phase 2) (Amenam 2 Topsides)
Position :UT Inspector
J ) ( Contract basics )
Employer :Arsea Engineering Sdn. Bhd.
Duration :November 2005 January 2006 ( 3 months )
Client :Tenaga Nasional Berhad
Project :Conought Bridge Power Station Rejuvenation, Klang, Selangor.
Position :UT Technician
K ) ( Contract basics )
Employer :Testex (M.) Sdn. Bhd.
Date jointed :February 2005 October 2005 ( 9 months )
Position :Multi-Disciplined NDT Technician
Project Involved
Project :CIQ-HGV Operation Office
Location :Namfatt Fabricators Sdn. Bhd. Shah Alam, Selangor.
Client :Gerbang Perdana
Project :Air Compressor Shelter Sudan
Location :Namfatt Fabricators Sdn. Bhd. Shah Alam, Selangor.
Client :Petrodar
Project :QC26 Crane Shutdown
Location :Northport Pelabuhan Klang, Selangor.
Client :Northport
Project :1st Turnaround 2005
Location :Panglima Power Sdn. Bhd. ( Powertek ) Telok Gong, Melaka.
Client :Panglima Power Sdn. Bhd. ( Powertek )
Comments
DUTIES AND RESPONSIBILITIES
NDE inspection carried out as per standards and test plan.
Conducting UT scanning, Radiographic testing, Magnetic particle testing, Liquid Penetrant testing, Hardness testing and Visual of welds and parent metal of piping, equipments and structures.
Competent in using special Safety tools Allmet, (EX II 2 G c T3/ II 2 D c 1850 Certified Pneumatic Grinding Tools)
Supervised radiation safety barrier as per (RPS) to barricade test area for radiography activities.
Evaluate of radiographic films.
Co-coordinating with maintenance and operation department for accustomed to a permit to work environment.
Detection and monitoring of hydrogen induced crack on pressure vessels, gas and crude production lines.
Detection of corrosion and other service defects on various vessels, pipelines, effluent water lines, flare units, gas lift units, hydrocyclone system, riser units, sea chest units, mooring system etc.
Reviewed, identify piping plan, layout ISO and P&ID line list, test package and creating full system isometrics and inspection report.
Maintain the records of inspection and testing till the end of contract.
Witnessing the procedure qualification record (PQR) as per WPS.
Witnessing the welder qualification test (WQT) as per approved WPS.
Ensure that welding carried out as per company approved WPS and welder qualification.
Witnessing identify certification, dimensional and mill cert.
Fit-up inspection, cutting, misalignment, grove angle, root face, root opening, tack weld and preheat temperature, line and joint number, joint surface cleanliness.
Visual and dimension inspection of weld profile surface, weld defects, arc strike, inter pass and post weld cleaning and dimensional clearance.
To ensure that all welding and associated actions of work are carried out by applying testing criteria in accordance with applicable specification standard and evaluate results.
Performing NDT activities Ultrasonic Flaw Detector scanning, Radiography Interpretation, MPI and DPI on item before, during and after fabrication process.
Conducting confident making decisions, good inward inspection, welding verification for welding repair works as per Non-conformance report, NDE request RT to evaluate result of weld defects from UTFD scanning and Film Interpretation.
Surveillance and final inspection over the finish item at workshop and at field prior delivery to client.
Work among QC Main-cont / Client Representative timely and expedite completion of job.
To prepare final documentation of NDT activities, welding summary, and filling off reports in accordance to Main-cont / Client reporting and documentation system.
Having knowledge and experience in SMAW, SAW, FCAW, GTAW and GMAW welding.
Material identification and classification.