certified cswip 3.1 welding inspector no.33628 - qc engineer
NDT.org Member Since: 2010
Added: 8/22/2010
Last Updated: 8/22/2010
Country:
Egypt
Status:
I am willing to Travel.
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
Certifications
cswip 3.1 certificate no. 33628 exp 12 april 2013
UT,RT,MT,PT LEVEL 2 CERTIFICATES
Education
B.SC. in ENGINEERING (MECHANICAL POWER - 2006 )
ZAGAZIG UNIVERSITY.
Experience
SEP 2010 TILL NOW :
QC ENGINEER in CONSOLIDATED ENGINEERING CONSTRUCTION CO. W.L.L. (CECC) .
Project : Halul Harbour Upgrade Project
Client : Qatar Petroleum
Location : Halul Island, Arabian Gulf, 90 km from Doha - QATAR
FEB 2007 TILL SEP 2010 :
Q.C Engineer in ASEC(ARESCO) for CONSTRUCTION and PRODUCTION INDUSTRIES.
1. FOR PRODUCTION INDUSTRIES :
Q.C Engineer in ARESCO FACTORY FROM :
MAR 2010 TILL SEP 2010
APRIL 2007 TO JUNE 2007
JUNE 2008 to OCT 2008.
2. FOR CONSTRUCTION INDUSTRIES :
A. FROM OCT 2009 TO MAR 2010 :
Project : SOUTH VALLEY Cement Plant-BENI SWEIF- EGYPT.
Client : ASEC
B. FROM NOV 2008 TILL OCT 2009 :
Project : AL-TAKAMOL Cement Plant -ATBARA SUDAN
CONSULTING: FLsmidth.
C. FROM NOV 2007 TILL MAY 2008:
Project : SINAI Cement Plant LINE ΙΙ EGYPT
CONSULTING: FLsmidth.
D. FROM NOV 2007 TILL MAY 2008:
Project : ELMINIA CALCIAM CARBONATE Plant EGYPT
CONSULTING: ALBINE
RESPONSIBLE FOR :
1- IN PRODUCTION INDUSTRIES
Total Inspection for all steps as the sequence of quality plan to the plate work and steel structure from receiving material to final product, follow up NDT methods and preparing all documentation.
2- IN CONSTRUCTION INDUSTRIES
Responsible for the quality control in the all project starting from the hummer crusher to the packing area including the following Areas :
- Raw Materials Handling Area.
- Raw Meal Production Area.
- Clinker Production Area.
- Cement Grinding Area.
- Cement Storage and Dispatch Area.
- Utilities Area.
3- FOR WELDING OPERATION :
o BEFOPRE WELDING :
1. checking All applicable documents
2. The drawings are clear and issue number is marked.
3. Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) are available and have been approved as required by the authority and is employed in production.
4. welders as required are used in production.
5. Quality plan is authorized and endorse with signature, date and company stamp.
6. material identification is verified against documentation.
7. Material composition, type and condition are checked.
8. equipment are in safe condition and adequate for job.
9. Dimension, tolerance, preparation, fit-up and alignment are in accordance with the approved drawings.
10. Cleanliness is maintained.
11. Preheating is in accordance with specified procedure.
o DURING WELDING :
1. Welding processes such as root pass and tack welds must be monitored and inspected.
2. Welding should be completed without undue interruption and within specific period.
3. Essential variables such as current, voltage, travel speed and number of runs must be monitored.
4. Inter pass cleaning, temperature and run sequence should be inspected
5. Welding is compliance with welding procedure sheet and applicable standard.
o AFTER WELDING :
1. Dimension accuracy must be checked.
2. Visual inspection is carried out to ascertain acceptability of appearance of welds.
3. Post welding heat treatment if any should be monitored and recorded.
4. NDT report is assessed.
FOR ERECTION OPERATIONS :
UTILITIES AREA ( TANKS , PIPE RACK , COMPRESSOR ROOM ,
.)
Piping "fabrication and installation".
Kiln erection.
Cooler erection.
hammer impact crusher.
Preheater erection.
tertiary air duct erection.
Atox Mill erection.
Cement Mill erection.
Filters erection ( jet pulse electrostatic precipitator ).
stacker and reclaimer erection.
screw conveyor , belt conveyor and drag chain erection.
Pan conveyor erection.
Bucket elevator erection.
stack erection .
Cyclones and steel plate bins erection.
Steel Structure erection as ( preheater - pipe Rack,
.).
AND OTHERS