Mistras Group
API 510/570

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: MN Minnesota
Country: United States
Status:
I am willing to Travel.
I am willing to work overseas.
I prefer temp jobs.
Certifications
API-510 Pressure Vessel Inspector
API-570 Pressure Piping Inspector
SAQCC (South Africa) CP Pressure Vessels PV# 627
TWIC Card Holder
Active Nuclear "L" Clearance
ASNT-TC-1A Level II RT,MT,PT,UT,VT
Education
2003 - 2005 Ridgewater College Hutchinson,MN
Non-Destructive Testing Inspection – Diploma

2001 - 2002 Northland Tech College Thief River Falls,MN
Aviation Maintenance – Diploma
Experience
Dec 28th – Dec 29th MTB Quality Consultants Cambridge,MN
API-510 (Contract)
Northern Natural Gas(Client). Performed external dimensional inspection vessels and attachments. Final document audit and visual inspection of coatings before shipment of vessels. Propane storage vessels at Arrow Tank and Engineering.

Oct 11nd - Oct 21st 10’ Sentinel Inspection Corpus Christi,TX
API-510/570 (Contract)
Flint Hills Resources T/A Gas Oil Hydrocracker Unit
Internal and external visual inspection of exchangers, drums, towers and piping. Writing repair recommendations.

Sept 23nd - Oct 8th 10’ Iesco Inspection Wilmington,CA
API-510/570 (Contract)
Conoco Phillips T/A. Sulfuric Alkylation Unit
Internal and external visual inspection of exchangers, drums, towers and piping. Writing repair recommendations.

Aug 26th - Sept 15th 10’ Moody International Secunda,South Africa
API-510/570 (Contract)
Sasol Synfuels T/A. Coal Gasification Plant-Rectisol Unit
Internal and external visual inspection of exchangers, drums, towers and piping. Writing repair recommendations.

May 3rd - May 26th 10’
NDE Level II (Contract) Petrospect Inspection Freeport,TX
DOW Chemical T/A. Ethanol Oxide Distribution Unit, TriChloride Unit. Visual, UT and PT inspection of pressure vessel, piping and welds.

March 28th - April 18th 10’ IHI Southwest Technologies Oswego,NY
Phased Array UT Tech (Contract)
Constellation Energy Nuclear Outage. Robotic Visual and Phased Array inspection of reactor core shroud and dryer vessel welds


Jan 5th 10’ - Feb 25th 10’ Pertrospect Inspection Garyville.LA
NDE Level II (Contract)
Marathon Oil T/A. HF alky, Frac, and crude unit. Supported project with visual and NDE inspection of pressure equipment, piping, heaters, exchangers, and towers.

Aug 25th - Sept 16th 09’ Moody International Secunda,South Africa
API-510 (Contract)
Sasol Synfuels T/A. Coal Gasification Plant-Rectisol Unit
Internal and external visual inspection of exchangers, drums, and towers. Writing repair rommendations.

April 13th - July 24th 09’ Midwest Ind. X-Ray Plymouth,MN
RT Crew Leader (Contract)
Level II RT,MT,PT,UT
Pipeline construction inspections, welder qualifications

Feb 23rd - April 1st 09’ System One,LLC Riverview,MI
API-510 (Contract)
Taminco Chemical. Visual inspection of vessels, exchangers, towers, and columns. Writing repair rommendations. Schedule NDE and maintenance

Jan 11th - Jan 24th 09’ Conam Insp. Wilmington,CA
NDE Level II (Contract)
Conoco Phillips. Supervision of radiography in the field.

May 3rd - Oct 24th 08’ Midwest Ind. X-Ray Plymouth,MN
RT Crew Leader (Contract)
Pipeline construction inspections, welder qualifications, ethanol plant projects

Feb 28th - March 29th 08’ Team Ind. Services Corpus Christi,TX
NDE Level II (Contract)
Citgo Oil T/A. Crude unit and Coke drum replacement.
corrosion inspection of vessels and piping

Jan 8th - Feb 27th 08’ Conam Insp. Signal Hill,CA
NDE Level II (Contract)
BP Carson,CA T/A, FCC, Alky and Sulphur unit

Sept 16th - Nov 16th 07’ Conam Insp. Seattle,WA
NDE Level II (Contract)
Boeing facilities project leader, pipeline weld qualifications, concrete x-ray

April 23rd - Sept 15th 07’ Midwest Ind. X-Ray Plymouth,MN
RT Crew Leader (Contract)
Pipeline construction inspections, welder qualifications

March 26th - April 20th 07’ Conam Insp. Signal Hill,CA
NDE Level II (Contract)
BP Carson,CA T/A Hydro-Cracker Unit
Radiography of welds during timed windows, MT,PT on new and existing piping

June 7th 05’ - March 8th 07’ Stork TCT St Paul,MN
NDE Tech (Full Time)
Level II RT,PT,MT,UT,PMI and Ground Penetrating Radar
Flint Hills Refinery construction inspection, Hydrogen and Ultra-Low Sulphur
Diesel units. Industrial inspection of water towers, bridges, boilers, structure. Concrete x-ray, eddy current of aerospace components and ground penetrating radar.
Comments
API-510/570 equipment inspector. College educated specializing in turnaround inspection. I have worked in the petroleum industry, domestic and internationally, nuclear and product quality control. I am a team player that is task oriented. Motivated to get the equipment back online the right way.


References
Contract TA Inspector
Derek Trites,API-510,570,653,CWI
612-462-6231

Tesoro Unit Inspector
Ben Brandt,API-510,570,571,580,Lvl III UT 612-423-4577

Contract TA Inspector
Richard Burrow, API-510,570,571 618-917-4723

Skills:
Computer
Knowledgeable in Microsoft Word, Excel, attaching digital photographs to reports
Personally equipped with laptop and digital camera

Evident Ultrasonic Inspection Equipment