NDT Level III in UT,ET, MT & API 510
NDT.org Member Since: 2012
Added: 12/13/2012
Last Updated: 12/13/2012
Country:
India
Status:
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
I prefer permanent jobs.
Certifications
ASNT Level – III
- ULTRASONIC TESTING
- EDDY CURRENT TESTING
- MAGNETIC PARTICLE TESTING
API 510 - Certified Pressure Vessel Inspector
Certified AUT Operator with GE Weldstar
Certified PAUT and TOFD operator with OMNISCAN MX/MX2
ASNT Level – II
- Radiography Testing
- Liquid Penetrant Testing
- Visual testing
Education
M.Tech ( Welding Engineering) 2009
National insititute of Techonoloogy, (REC) Trichy - 8.26 GPA
B.Tech( Mechanical Engineering) 2007
Srikalahastheeswara Institute of Technology, Srikalahasthi.
68.23%
Experience
Inspection of API 5L X 70 thk 12.7mm
Pipeline(122
Km) Girth weld Joints for NEW crude oil 30 inch
Pipeline(122 KM) transit line- 4 from point ‘A’ to CMM
project by Kuwait Oil Company as approved AUT Operator &
NDT Level III.
The inspection of API 5L X 65 thk 16 & 18mm
Pipeline Girth weld Joints for Emergency pipeline Repair
System (EPRS) project at YEMEN LNG, Belhalf as approved AUT
Operator & NDT Level III.
Inspection on longitudinal, circumfential
seam &
Nozzle joints of (SA 516 Gr.70, SA 387 Gr 22 Cl2, SA 335 Gr
P22 + Cladd SS 316L range of thicknesses of 18 to 95 and
147mm...)Pressure Vessels(Prereformer, Heat Exchangers,
Reboilers, Steam Genarators .....) at Larsen & Toubro, Powai
as approved Phased array & TOFD Operator & Level III using
Omniscan.
Inspection on longitudinal, circumfential
seam &
Nozzle joints of (SA 335 Gr P22 with thickness of
137mm...)Pressure Vessels(Prereformer) at ESSAR
PROJECTS,Surat as approved Phased array & TOFD Operator &
NDT Level III using Omniscan.
Phased array inspection on “TKY structral
welds for
LAGGAN TORMORE project” as NDT Level III, for M/s. Petrofac/
Total E & P UK Ltd., Kuwait.
Automated lamination check of heater for
Engineering
& Procurement Services For Al Noor 3a&Shakiya A2c Miniflood
Project as NDT Level III for M/s, Arabian/WPOR/PDO,Oman
AUT Pipeline Grith Weld Inspection for
Dahej-
Vijaipur Pipeline Project as AUT Operator for M/s GAIL
using GE Weldstar under inspection of M/s E.I.L as operator.
AUT Pipeline Grith Weld Inspection for
Vijaypur
Dhadri Pipeline Project - Section C as AUT Operator for M/s
GAIL using GE Weldstar under Supervision of M/s E I L India
as operator.
Inspection on Piping Joints (thickness of
14, 24,
28, 36, 45 and 68 mm) for Capitative power plant project as
approved Phased array Operator & Level III by HMEL (HPCL-
Mittal Energy Ltd).
In service inspection of (SS 316L, Brass and
Cu-
Ni)Non-Ferrous heat exchanger tubes by Eddy Current testing
(OD 19.05 & 25.4 with different thicknesses)at NOCL,
Cuddalore during Dec 2009 – Jan 2010.
In service inspection of Non-Ferrous(SS 316L
&
Titanitum) heat exchanger tubes(OD 19.05 & 25.4 thickness of
1.68 & 2.1) by Eddy Current testing at OMAN LNG, Sur in OCT
2010.
In service inspection of (Titanitum) Non-
Ferrous
heat exchanger tubes by Eddy Current testing (OD 19.05 &
25.4 with different thicknesses)at at YEMEN LNG, Belhalf in
April 2011.
In service inspection of (Carbon steels,
alloy
steels like ......SA 179, SA 216 )Ferrous heat exchanger
tubes by Eddy Current testing (OD 19.05 & 25.4 thicknesses
of 2.11, 2.77 & 3.10 mm) at NOCL, Cuddalore during Dec 2009
– Jan 2010.
In service inspection of (SA 179)Ferrous
heat
exchanger tubes by Eddy Current testing (OD 19.05
thicknesses of 2.11 & 2.77 mm) QP-Fahahil Stripping Plant ,
Qatar in MAY 2012.