Curtiss Wright Nuclear
Electronics Engineer with 6+ years experience in equipment maintenance

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Singapore
Status:
I am willing to Travel.
I need a job as soon as possible.
I prefer permanent jobs.
Education
* Bachelor of Science in Electronics & Communications
Engineering
- University of San Carlos
- Nasipit, Talamban, Cebu City Philippines 6000
Experience
19 September 2011 – 18 August 2014
Technical Specialist – Maintenance (Barrier)
Hewlett-Packard Singapore Private Ltd
1150 Depot Road Singapore 109673

* Perform line support and preventive maintenance
to various Photolithography equipment in a class 1000
cleanroom which includes but not limited to Akrion SMS
Wet Bench, Micralign™ Projection Mask Aligners,
Semitool Equinox Developer, Nitto Laminator, and IVS120 &
135 Metrology

* Maintain equipment to achieve optimized equipment
uptime and process yield target

* Review and analyze core equipment issues and
address equipment obsolescence

* Other roles & responsibilities:
 Department Spare Part & Cost Coordinator
• Achieve BDAPM R&M quarterly spending to be within
budget
• Manage POs triggered and invoiced
• Facilitate end-user requests which include PO
cancellation, SAP spare parts loading, SAP spare part
information changes and SAP spare parts deletion
• Effectively manage parts inventory level and
address parts obsolescence

 Spare Part Coordinator (Barrier)
• Establish and manage a system to track and
analyze spare usage and cost incurred in maintaining each
machine
• Ensure availability of spare parts and optimized
reorder point settings
• Provide timely support to all spare part loading,
changes and deletion from the SAP system
 EHS Maintenance Representative (Barrier)
• Effectively implement the company’s EHS
Objectives and Programs within Barrier workcenter
• Achieve 100% compliance to all applicable
Regulatory and other Requirements
• Achieve 100% compliance and minimize observations
during audits
 EHS Internal Audit Team Member & Safety Inspector
• Successfully conduct internal audit on the
compliance and effectiveness of the EHS implementation
based on HP EHS Management System Standard and all
applicable Regulatory and requirements by MOM
• Conduct monthly safety inspection to assigned
workcenter and generate inspection report


3 January 2008 – 17 September 2011
Engineer
James Contractor Private Ltd.
102 Woodlands Industrial Park E3, Singapore 757838

* Assisted the Project Manager in the management
and implementation of telecom pipelines, underground
copper cables, and fiber optic cable network (both
outside plant and FTTH) installations

* Coordinated with OpenNet’s representatives and
subcontractors in the implementation of the projects and
monitoring of projects and customers' maintenance
requests

* Managed maintenance requests and assigned field
staff to attend to the correction of the issues raised

* Prepared and managed necessary documentations and
applications as required by different authorities
(including but not limited to LTA applications, Power and
Gas work notifications)

* Verified and ensured all installations are within
standards set by the customer

* Established document control system to control
and manage all drawings, report and summary of works for
each project

* Generate testing reports and summary of works
performed for each project

* Maintained and updated project register for
active and completed projects

* Managed fiber termination and testing equipment
including repair and calibration requests


13 October 2003 – 7 August 2007
Equipment Engineer – Circuit Assembly Plant
Lexmark International Philippines Incorporated (now Funai
Electric Cebu, Inc.)
MEPZ 2, LapuLapu City, Philippines 6015

* Performed scheduled Preventive Maintenance for
Dicing Saws, Tab bonder, Electrical Testers, Pull/Peel
Testers, Wafer Washers and Nikon Measurescope

* Conducted repair and restoration of broken down
equipment in a Class 1,000 Cleanroom Environment. (i.e.
Tab Bonder, Dicing Saws, Electrical Tester, Pull/Peel
Testers, Wafer Washer and Nikon Measurescopes)

* Performed installation, debugging, acceptance and
qualification of new equipment and/or equipment
modifications

* Performed product change-over to support
production schedule

* Provided technical support during qualification
of new products

* Conducted engineering evaluations and equipment
modifications geared towards problem resolution, process
enhancement, yield improvement, cost minimization and OEE
improvement

* Coordinated with other department concerning
technical issues related to line maintenance and
development of manufacturing equipment

* Established and managed system procedures related
to Preventive Maintenance and Equipment Development

* Established and maintained Equipment Records of
all CA-Plant manufacturing equipment (i.e. Equipment 201
File, Preventive Maintenance Database, & Equipment
History)

* Interfaced with the suppliers/vendors and Lexmark
headquarter counterparts on equipment related issues and
improvements

* Conducted technical training on machine
operations and basic troubleshooting to manufacturing
technicians
Mistras Group