Mistras Group
Counstruction Supervisor
This job is closed
NDT.org Job Number: 12664 * Please reference NDT.org Job Number on all correspondence
Phone: 0098-912-215-7999
Country: Iran
1. PERSONAL DETAILS

Full Name : BENYAMIN SAHLEH
Date of Birth : September 22.1969
Nationality : IRANIAN
Marital Status : MARRIED
Language : PERSIAN - ENGLISH


2. EDUCATION

Year Education
1991 1995 B.Sc. in Metallurgical Engineering from MSA Application eng.university

Extra Info:
I am willing to Travel.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.

(RTI) Radiography Test Interpretation
Level II ASNT (Exp. July 2007) (TWI-UK)

(UT) Ultrasonic Test
Level II ASNT

(MT) Magnetic Particle Test
Level II ASNT (TWI-UK)

(PT) Liquid Penetrant Test
Level II ASNT (TWI-UK)

Certification Scheme for Welding Inspection Personnel (CSWIP)Level 3.1 (TWI-UK)

International Welding Inspector
Basic Level (Awarded by IIW)

ASME Sec VIII, Div. 1 (Pressure Vessel)
(Design, Fabrication, Inspection, Alteration,
Repair)(Trainer: K. MOKHTARIAN, Vice chairman Pressure Vessel Subcommittee, ASME USA)
ISME (Iran)- May 2004

CNG (Cylinders, Stations, Installation, Workshops, Personnel)
Bureau Veritas (Tehran-Iran)- Sep 2005

.MECHANICAL WORKS INSPECTION
Training about inspection in the following subjects:
1.Materials
2. Welding
3.NDT
4.Pressure vessels
5.Diesel engines
6.Gas and Steam turbins
7. Centrifugal Pumps
8. Painting and Lining
9.Cranes
10.Reporting


Skills:
Experience:
Period : February 2003- up to now
Company : Bureau Veritas Iran(BV)
Position : Senior Mechanical & Welding & NDT Inspector
Project :
Darquain Field Development Phase 2-Iran (ENI)(2005~up to now)(Resident Site Inspector, Working as Welding Inspector)

South Pars Field Development Phases 6&7&8-Iran (TIJD)(2005)
(Vendor Shop Inspector, Working as Mechanical & Welding Inspector)

Salman Field Development EPC-2-Iran (PEDCO)(2004~2005)
(Resident Site Inspector, Working as Welding and NDT Inspector)

Pars Petrochemical Company-Iran (PPC)(2004)
(Resident Site Inspector, Working as Mechanical & Welding & NDT Inspector)

Darquain Field Development Phase 1-Iran (ENI)(2004)
(Vendor Shop Inspector, Working as Mechanical & Welding & NDT Inspector)

South Pars Field Development Phases 4&5-Iran (ENI/HDEC)(2004)
(Site & Vendor Shop Inspector, Working as Welding & NDT Inspector)

Pipe Line Construction Phases 4 &5-On Shore Portion-Iran(ENI/SADAF)(2004)
(Resident Site Inspector, Working as Welding & NDT Inspector)

Pipe Manufacturing-Iran (Ahwaz Pipe Mill)(2003)
(Resident Inspector in Manufacturer’s Shop, Working as Mechanical & Welding Inspector)

CNG Cylinder Manufacturing-Iran (JTG)(2003)
(Shop Inspector, Working as Mechanical Inspector)(ISO 11439)

CNG Conversion Kit Installation on Vehicles-Iran (IFCO)(2003~2005)
(Shop Inspector, Working as Mechanical & CNG Specialist)


Job Description :
Material Inspection:
Visual and Identification Inspection, Mill Test Certificate Review.
Mechanical & Welding Inspection:
Welding Inspector’s Duties (according to duties described in CSWIP Specification) such as WPS/PQR Review & Welding Visual Inspection & Welder Qualification Test & Supervision of PQR Test; and Reviewing Technical Procedures.
NDT Inspection:
Radiography Test Interpretation of Welding.
Witnessing and Supervising on UT, PT, MT.

Detailed Projects/Instruments/Items:
Pressure Vessel, Air Cooled Fan, Heat Exchanger, Flare, Riser, Jacket & Top Side, Pipe Manufacturing, Pipe Line, Piping, CNG Cylinder Manufacturing, Steel Structure.

Codes/Standards:
ASME (Section II-VIII-IX-B 31.3)
AWS (D 1.1)
API (5L-1104-650)
ASTM
BS (4515)
ISO (287-288-11439-15500-15501)

Period : 1999- September 2000
Company : Machine Sazi Arak (M.S.A)
Position : Head of Q.C of assembling and machinery group in MSA
Project : South Pars Gas Development Phases 1
Job Description : • Inspection of various equipments such as boilers , heaters, pressureVessels, heat exchangers, storage tank.
• Planning for Quality Control
• Team Leader welding inspection and NDT tests.
• Review the Welding Procedure Specification(WPS),Process
Qualification Record (PQR) and Witness the Destructive Test in
the Laboratory .
• Review the Quality Plan ,Manufacturer’s Process Specification ,Quality Manual
• Review of construction Drawings.

Period : 1998-1999
Company : Machine Sazi Arak (M.S.A)
Position : Head of Q.C of Crane and machinery shops in MSA
Project : South Pars Gas Development Phases 2 & 3
Job Description : Managing QC departments and inspectors, welders to catch up the plan, welding and visual inspection of welding lines and drums and steel structure.

Period : 1997-1998
Company : Machine Sazi Arak (M.S.A)
Position : Production Supervisor
Project : Karkheh, masjed solayman and Karun III Dam
Job Description : • Supervision on production of mechanical parts such as Rotor Spider , Fans, Pressure Vessels , Storage Tanks , Air Coolers
• Inspection of various equipments such as boilers, heaters, pressure Vessels, heat exchangers, storage tank.


Period : 1996-1997
Company : Machine Sazi Arak (M.S.A)
Position : Method man in Design Dep. in MSA
Project : Air coolers, Pressure vessel , Heat exchanger
Job Description : • Preparing of PWHT procedure for various projects such as Karkheh Dam,Masjed solayman Dam, Air coolers,…
• Preparing of WPS for various projects such as Karkheh Dam,Masjed solayman Dam, Air coolers,…
• Review of construction Drawings.


Evident Ultrasonic Inspection Equipment