UT Level II / Rope Access Technician
NDT.org Member Since: 2006
Added: 1/2/2006
Last Updated: 1/2/2006
Country:
Malaysia
Status:
I am willing to Travel.
Currently working but always looking.
I need a job as soon as possible.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.
Certifications
.PCN UT Level II
.ASNT Level II (UT/MT/PT)
.IRATA Level I
Education
S.P.M. (General Education of Malaysia)
COURSES ATTENDED
Ruane TATI course on PCNUT
OPI in-house training for ASNT Level II (UT/MT/PT)
SEQU Sea Survival course
MSTS Basic Sea Survival and Basic Fire Fighting course
CONSIST Basic Offshore Safety Escape Training-BOSET
ESP Rope Access Technology Training Services-IRATA Level I
Experience
Jun 06 July 06: ESP Rope Access Technology Sdn. Bhd.
As a Rope Access technician carried out ultrasonic testing for Petroleum Development Oman Project (PDO), Oman .
Sept 01 Apr 06: OILFIELD PIPELINE INSPECTION SDN. BHD.
As a multi technician for onshore & offshore project .
Feb 06 Mar 06 : TL Offshore Sdn. Bhd.
As a multi technician carried out UT/MT/PT on the
Petronas Carigali Sdn. Bhd.(PCSB)
10 LEDP-A to PU-A pipeline on barge
J Ray McDermott (DB 30), Terengganu .
Dec 05: BP Chemical (Malaysia) Sdn. Bhd.
Carried out ultrasonic testing for December 2005
Shutdown at BP Chemical Plant, Gebeng .
Aug 05 Nov 05 : TL Ofshore Sdn. Bhd.
As a multi technician carried out UT/MT/PT on the
ExxonMobil Guntung E Platform Installation (EMEPMI)
on barge K1 & Sarku Samududra, Terengganu .
May 05 Aug 05 : Hyundai Heavy Industries Co. Ltd
As a multi technician carried out UT/MT/PT on 28 dia.
pipeline for Chunxiao Gas Complex Development
Offshore Project (CNOOC) on barge HD 2500,
Chunxiao Offshore Field, China .
Feb 05 Apr 05 : TL Ofshore Sdn. Bhd.
As a multi technician carried out UT/MT/PT on
EMEPMI 2004-2006 for pipeline and riser installation,
Brunei Shell Project on barge DLB 264, Kota Kinabalu,
Sabah .
Nov 04 Dec 04 : TLO Offshore Sdn. Bhd.
As a multi technician UT/MT/PT on pipeline and riser
installation for EMEPMI 2004-2006 Project on barge
DLB 264, Terengganu .
Feb 04 July 04: Hyundai Heavy Industries Co. Ltd
As a multi technician carried out UT/MT/PT on topside,
jacket and structure installation for Huizhou 19-3/2/1
Developmrnt Project on barge HD 2500, China .
Nov 03 Jan 04 : Hyundai Heavy Industries Co. Ltd
As a multi technician carried out UT/MT/PT on 8, 10
and 12 pipeline and riser installation for MHB Puipeline
Project on barge HD 2500, Mumbai, India .
Sept 03 Oct 03: Global Offshore Sdn. Bhd.
As a multi technician carried out UT/MT/PT on 14
pipeline installation for WQT work SSB Serai Project on
barge DLB 264, Indonesia .
May 03 Sept 03: Htyundai Heavy Industries Co. Ltd
As a multi technician carried out UT/MT/PT on structure
installation for Maersk Oil Qatar AS Block 5
Development Project (Phase 1) on barge HD 2500, Qatar.
Apr 03 May 03 : J Ray McDermott Far East
As a multi technician carried out UT/MT/PT on jacket
installation for Conoco Belanak on barge DB 30 at South
Natuna Sea, Indonesia .
Apr 03: BASF
Carried out ultrasonic inspection at BASF yard, Gebeng .
Nov 02 Mar 03 : Hyundai Heavy Industries Co. Ltd
As a multi technician carried out UT/MT/PT on structure installation for Maersk Oil Qatar AS Block 5 Development Project (Phase II) on barge HD 2500, Qatar
July 02 Nov 02
: Mechmar Keppel Engineering Sdn. Bhd.
Carried out ultrasonic testing for MKE 295 at Mechmar Keppel yard in Shah Alam, Selangor .
: Boon Chang (M) Engineering & Construction
Carried out ultrasonic testing and magnetic particle inspection for Steel Bridge Penang .
: Boon Chang (M) Engineering & Construction
Carried out ultrasonic testing for Proton City at Tanjung
Malim, Perak .
May 02 July 02: Teknik Lengkap Offshore Sdn. Bhd.
Carried out ultrasonic testing for MLNG 3 Shore
Approch in Bintulu, Sarawak .
May 02
: Mechmar Keppel Engineering Sdn. Bhd.
Carried out ultrasonic testing for MKE 295 at Mechmar
Keppel Yard in, Shah Alam, Selangor .
: Boon Chang (M) ultrasonic testing and magnetic particle
inspection for steel bridge Penang .
: Right Gas Sdn. Bhd.
Carried out ultrasonic testing for Daito Hotel Project .
: Kai Peng Engineering Sdn. Bhd.
Carried out ultrasonic testing for Athens Power
Plant,
Shah Lam .
Apr 02 May 02: Boon Chang (M) Engineering & Construction
Carried out for testing for Proton City at Tanjun g Malim.
Sept 01 Dec 01: Saipem Asia Sdn. Bhd / Oilfield Pipeline Insp. Sdn. Bhd.
Carried out ultrasonic testing of linepipe at BP & PPSC
for Bluestream Project in Kuantan .
Oct 00 July 01: OPTIMAL CHEMICAL (M) SDN. BHD.
Project Scope of work: Malaysian Olefins Project (MOP)
Performed ultrasonic flaw detection on pipe fingers
joints and heavy wall piping in accordance to code and
specification .
Compilation of ultrasonic flaw detection reports as per
client specification .
Familiarise with UT code ASME See. VIII .
Responsible for the compilation of report for the overall NDT inspection activities .
Assosted in the safety monitoring of safety activities .
Ensure all NDT procedures are executed as per
specification .
Ensure contractors equipment is as per contract and
specification and is properly maintained services and store .
Jan 01 Oct 00 : Performed ultrasonic flaw detection for foundries, oil palm mills in and pressure vessels fabrication workshops in various parts of Malaysia .
Project involved
Ultrasonic flaw detection on Road Tankers for Mechmar,
Bestoball Shah Alam .
Ultrasonic flaw detection of Ammonia Tanks at CCM .
Ultrasonic flaw detection at Several Fabrication Shop in Pasir Gudang and Selangor .
Ultrasonic flaw detection on two gas saperator at Kerteh Compressor Station, Kerteh, Terengganu .
Performed thickness measurement on vessels at PGSB
GPP 1 Kerteh and Export Terminal Kemaman,Terengganu .
Performed ultrasonic flaw detection on Boiler at Vestech Engineering Ipoh, Perak .
Comments
5 Years of experience in OIL & GAS / PETROCHEMICAL / FABRICATION INDUSTRIES.