Evident Ultrasonic Inspection Equipment
API Inspector

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
I prefer temp jobs.
I prefer permanent jobs.
Certifications
-Welding Inspector PCN level II Ruane UK
from Ruane TATI, Kemasik, Kemaman, Terengganu, Malaysia

-ASNT level II MT / UT


-In-house training in Ultrasonic Testing, Magnetic Particle, Dye Penetrant Testing,
Radiography Testing, at Intestmal Corporation Training Room conducted by qualified
Level III and Senior Inspector.

-PCN WELD INSPECTOR LEVEL 2 (General) (RTO/QA7) Course at Ruane-TATI,
Kemasik, Kemaman, Terengganu.

-NIOSH PETRONAS SAFETY PASSPORT COURSE at NIOSH East Coast Branch,
Kertih Terengganu.
-CIDB Safety Course conducted by qualified Construction Industry Development
Board Malaysia Instructor at Intestmal Corporation Training Room.

-Confined Space Training for Authorized Entrant at Gas Processing Plant Complex A,
Kertih, Terengganu.


-Attend Sea survival course includes HUET (Helicopter Underwater Emergency Training), CPR, Fire Fighting at SMTC Miri, Sarawak, Malaysia



-A.P.I 510 Pressure Vessel Inspections Certification Preparation Course accordance to API510, API572, API576, API571, API577, ASME II, ASME V, ASME VIII, and ASME IX at Concorde Hotel, Shah Alam by Authorised A.P.I Instructor from IRC, U.K

-Attend Authorized Entrant & Standby Person for Confined Space as per
Requirement Course Code at ITC Skill Development Sdn Bhd, Puchong
conducted by NIOSH Trainer.
Education
Bachelor of Environmental Science at University Malaysia Sabah
Experience
A. Company : INTESTMAL CORPORATION SDN BHD
Date join : Jan 2004 to present
Position : Technical Inspector

Scope of work :
• To performed NDT activities such as Ultrasonic Flaw Detection Testing,
Ultrasonic Thickness Measurement, Magnetic Particle Inspection, Red Dye
Penetrant Inspection, Videoscopic Inspection and Hardness Testing for various
assignment.
• Assigned as Welding Inspector to monitor all welding activities before, during and
after welding for several projects involved.
• To witness welder test (WQT), hydro testing, leak testing, post weld heat
treatment (PWHT) and material verification.
• Reviewing radiograph as per project requirement.
• To participate on preparation of final documentation, welding summary and filing
of close-up reports in accordance to client reporting and documentation system.
• To assist Senior Inspector during performed report presentation session to client
representative upon completion of works and brief on inspection finding and raise
of technical recommendation.

Involved in the following projects:

Sept 2006 to present
-Seconded to Petronas Penapisan Melaka Sdn.Bhd as RV inspector to determine of RV overdue date inspection and interval, cause of failure of RV, selection for RV service/overhaul during Turnaround activities and perform external visual inspection on RV according to MI-30516: On stream Visual Inspection for Relief Valve and MI-20529: Inspection Documentation Through Photography Methodology

July to August 2006
-Seconded to Optimal Chemical (M) Sdn Bhd as Static Equipment Inspector during
TLE Retubing July 2006. To review repair procedure, WPS and WQT. To witness of preparation before welds and during welding progress under conducted by BORSIG contractor from Germany.

May – July 2006
-Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as NDT Technician during
maintenance and repair work. To performed UT Thickness Measurement and
collecting thickness measurement data.
-Seconded to Esso Malaysia Berhad as NDT Technician during maintenance and
repair work at Refinery Plant. To perform UT Thickness Measurement activities and
collecting thickness measurement data, Dye Penetrant Inspection and Magnetic
Particle Inspection.

April 2006
-Seconded to Polyplastics Asia Pacific Sdn Bhd as Static Equipment Inspector during
Emergency Shutdown April 2006. To performed internal and external inspection
activities.

March to April 2006
-Seconded to Ethylene (M) Sdn Bhd as Visual cum Plant Inspector. To performed
internal and external inspection activities.

February – March 2006
-Seconded to Optimal Chemical (M) Sdn Bhd as Static Equipment Inspector during
Optimal Turnaround 2006 at Olefins Plant. To performed external and internal
inspection activities.

January 2006
-Seconded to TNB Research Sdn Bhd as Videoscope Inspector. To performed
Videoscopic Inspection activities at Sultan Ismail Power Station, Paka, Terengganu.
Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as NDT Technician during
maintenance and repair work. To performed Dye Penetrant Inspection activities.

Nov 2005
-Seconded to MCOT, Miri as NDT Technician during maintenance and repair work.
To performed Ultrasonic Thickness Measurement activities and collecting thickness
measurement data.
-Seconded to Esso Malaysia Berhad as NDT Technician during maintenance and
repair work at Refinery Plant. To perform UT Thickness Measurement activities and
collecting thickness measurement data, Dye Penetrant Inspection and Magnetic
Particle Inspection.


Sept – Oct 2005
-Seconded to Esso Malaysia Berhad as NDT Technician during maintenance and
repair work at Refinery Plant. To perform UT Thickness Measurement activities and
collecting thickness measurement data, Dye Penetrant Inspection and Magnetic
Particle Inspection.

August 2005
-Seconded to Petronas Penapisan (Melaka) Sdn Bhd as NDT Technician during plant
maintenance and repair work. To performed UT Thickness Measurement activities
and collecting thickness measurement data.

July 2005
-Seconded to Petronas Fertilizer (Kedah) Sdn Bhd as Static Equipment Inspector
during PFKSB Turnaround 2005. To performed internal and external inspection
activities.

June 2005
-Seconded to MTBE (M) Sdn Bhd as NDT Technician during PDH Turnaround 2005.
To performed Dye Penetrant Inspection, UT Thickness Measurement activities and
collecting thickness measurement data.

April – May 2005
-Seconded to Petronas Penapisan Melaka Sdn Bhd as NDT Technician during
maintenance and repair work at PPMSB Plant. To perform UT Thickness
Measurement activities and collecting thickness measurement data.

March – April 2005
Seconded to MTBE (M) Sdn Bhd as NDT Technician during MTBE Turnaround
2005. To performed Dye Penetrant Inspection activities.

Jan – Feb 2005
-Seconded to Petronas Penapisan Melaka Sdn Bhd as NDT Technician during
maintenance and repair work at PPMSB Plant. To perform UT Thickness
Measurement activities and collecting thickness measurement data, Dye Penetrant
Inspection and Magnetic Particle Inspection.
-Seconded to Esso Malaysia Berhad as NDT Technician during maintenance and
repair work at Refinery Plant. To perform UT Thickness Measurement activities and
collecting thickness measurement data, Dye Penetrant Inspection and Magnetic
Particle Inspection.

Dec 2004 – Jan 2005
-Seconded to MCOT, Miri as NDT Technician during maintenance and repair work.
To performed Ultrasonic Thickness Measurement activities and collecting thickness
measurement data.
-Seconded to MTBE (M) Sdn Bhd as NDT Technician during Mini Shutdown 2004.
To performed Dye Penetrant Inspection activities as per client request.

November 2004
-Seconded to Esso Malaysia Berhad as NDT Technician during maintenance and
repair work at Refinery Plant. To perform UT Thickness Measurement activities and
collecting thickness measurement data, Dye Penetrant Inspection and Magnetic
Particle Inspection.


October 2004
-Seconded to TNB Janamanjung Power Plant as UTTM Technician during Onstream
Inspection for Unit 1 Package A & B. To performe UT Thickness Measurement
activities and collecting thickness measurement data onto static equipment and other
related equipment as per client request.

August to Sept 2004
-Seconded to Petronas Methanol Labuan as QC/Welding Inspector during PML
Turnaround 2004. To performed inspection activities and to monitor welding
activities on static equipment and other related associate pipings at PML Plant,
Labuan.
-Seconded to Petronas Gas Berhad as NDT Technician during Export Terminal
Turnaround 2004. To performed dye penetrant inspection activities.

June – July 2004
-Seconded to Perwaja Steel Sdn Bhd as NDT Technician during maintenance work. To
performed Magnetic Particle Inspection activities on static equipment at Teluk
Kalong, Kemaman.
-Seconded to Nam Fatt Fab. Sdn Bhd, Shah Alam as NDT Technician during project
CIQ Roof Structure Phase 2. To performed Magnetic Particle Inspection at Nam Fatt
Workshop.
-Seconded to Esso Malaysia Berhad as NDT Technician. To performed UT Thickness
Measurement and collecting thickness measurement data, Magnetic Particle
Inspection and Dye Penetrant Inspection during on-call project.
-Seconded to Petronas Penapisan Melaka Sdn Bhd as NDT Technician during
maintenance and repair work. To performed UT Thickness Measurement activities
and collecting thickness measurement data on static equipment at Unit 23 PSR 2.

May 2004
-Seconded to TNB Janamanjung as NDT Technician during Equipment Inspection for
RBI Project. To performed Magnetic Particle Inspection and Dye Penetrant Inspection
on static equipment and other related equipment as per client request.

April 2004
-Seconded to Petronas Penapisan Melaka Sdn Bhd as NDT Inspector during PPMSB
Phase 3 Turnaround 2004.

February 2004
-Seconded to Melia Com. Sdn Bhd as Assistant DPI Technician.

Comments
Summary of experiences

3+ years involved in various project and job scope in metal fabrication included Oil and Gas.
Experienced in welding and plant inspection as welding inspector, fabrication supervisor, QA/QC inspector, and static equipment inspector.

• Involved welding inspection on piping and structure work in various project.
• Performed inspection and borescope inspection on piping, rotary equipment, boiler tubes, reactor, heater coil, heat-ex changer, monitoring welding work and review the WPS, and execute people, and etc
• As NDT Inspector during performed Ultrasonic Thickness Measurement, Magnetic Particle Inspection, Red Dye Penetrant Inspection, and Hardness Testing for any assignment.
• As Inspector on preparation on final documentation, and filing of reports in accordance to client reporting and documentation system.
• As Inspector during performed report presentation session to client representative upon completion of works and brief on inspection finding and raise of technical recommendation
• Monitoring/whitness welding work and review WPS, PQR and WQT.
• Relief Valve inspector to compile and verify RV and RD listing in comparison with the existing list. To retrieve manufacturer procedure and drawing for all RV and RD. To compile of RV essential data i.e. design data, operational and drawing. To identified of corrosion rate based on associated equipment and piping and to complete PACER report.
• Plant Turnaround/static equipment Inspector.
Mistras Group