Mistras Group
NDT specialist-PCN Level III (UT, MT,PT,RT) PAUT Level II

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Nigeria
Status:
I am willing to Travel.
I am willing to work overseas.
Certifications
PCN Level 2
Ultrasonic Inspection UT- (For 3.1 Plate, 3.2 Pipe. 3.8 Nozzle and 3.9 Node)
Phased Array - PAUT
Radiographic Film Interpretation (RFI)
Basic Radiation Safety (BRS) –L1
Radiographic Testing (RT)
Magnetic Particle Inspection (MPI)
Dye Penetrant Testing (DPI)

PCN Level 3
Radiographic Testing (RT)
Dye Penetrant Testing (DPI)
Magnetic Particle Inspection (MPI)
Ultraconic Testing (UT)

EUROPEAN STANDARD EN 473
Magnetic Particle inspection - MPI Level 2
Dye-penetrant Inspection - DPL Level 2

AMERICAN SOCIETY FOR NON-DESTRUCTIVE TESTING
ASNT Level 2
Ultrasonic Inspection For Plate, Pipe and Node
Radiographic Testing Inspection
Radiographic Film Inspection
Magnetic Particle inspection
Dye-penetrant Inspection
Education
St Theresa’s Primary School, Okobo 1987-1994
Government Technical College, Abak 1995-2001
Don Bosco Training Institute, Onitsha 2002-2004
Rivers state university of science and technology 2006-2012
NDT International Chennai India
Experience
Having 10 years experience in NDT Field and Quality Control.

Project/ Location: Don Bosco Training Institute, Onitsha Anambra State
Period: Aug 2004-Dec 2005
Client: Salesian of Don Bosco SDB
Accountabilities and responsibilities: Fabrications of School facilities like chair and lockers, protector, table etc.
Mathematics, technical drawing, measurement and evaluation, workshop theory and workshop practice instructor.

Project/Location: Amenam Kpono / Offshore
Company /Period: Saipem Contracting Nigeria Limited / Dec 2006 - April 2007
Client: Total E $ P Nigeria limited
Accountabilities and responsibilities: Performing MT and PT on piping and pipeline during fabrication and erection stage in Amenam Platform.
Performing radiographic inspection on pipes ¾̋- 16̋ diameters using either of the following techniques: Contact exposure, panoramic technique, super imposed technique, ellipse technique, DWDI, DWSI and SWSI technique. Using Gamma ray source as per iridium192 and selenium 75.

Project/Location: Akpo Project / New Operation Base PHC
Company /Period: Saipem Contracting Nigeria Limited / May 2007 - Feb 12, 2008
Client: Total E $ P Nigeria limited
Accountabilities and responsibilities: Performing MT on the excavated area, bevel edge, finished welds, which include butt and fillet weld.
Lamination and thickness check on plate and pipes. And Radiographic inspection on plate and pipe of various thickness and diameter respectively.

Project/Location: Nembe Project. / New Operation Base PHC
Company /Period: Saipem Contracting Nigeria Limited. / Feb 2008 - July 2008
Client: SPDC
Accountabilities and responsibilities: Performing radiographic inspection on pipes from 8̋ - 36̋ diameter using crawler machine, panoramic tube & directional tube X-ray machine.

Project/Location: UNICEM CEMENT PLANT, CROSS RIVERS STATE
Company /Period: Linkso Nigeria Limited. / July 2008 - Nov 2008
Client: Unicem
Accountabilities and responsibilities: Ultrasonic Inspection on piles of 4-Meter diameter.

Project / Location: Gbaran Ubie Pipeline, Flowlines and Intersite Cable. / Yenegoa , Bayelsa State
Company/Period: Saipem Contracting Nigeria Limited Nov 2006/ July 2010 Client: SPDC
Accountabilities and responsibilities: Radiographic inspection on pipeline from 6inche– 36inche diameter using crawler machine, panoramic tube & directional tube X-ray machine, MT and PT on excavated area.

Project/ Location: Obagi Flow station
Company /Period: Corromasters Inspection / Aug – Sept 2010
Client: Total
Accountabilities and responsibilities: Integrity and Corrosion check on storage tank and high & low-pressure pipeline

Project/ Location: ASHAKA CEMENT PLANT, GOMBE STATE.
Company /Period: Linkso Nigeria Limited / Nov 2010
Client: Lafarge- WAPCO
Accountabilities and responsibilities: Ultrasonic inspection on the raw mill fan, roller shaft, fan impeller, Kiln drive shaft, limestone mamuntur, VRM axle shaft, VRM roller, clinker hammer, plate feeder shaft EP fan, ID fan etc. electromagnetic yoke and red dye penetrant.
Project/ Location: Lafarge Cement Plant, Ewekoro-I, Ogun State
Company /Period: Linkso Nigeria Limited/ Dec 2010
Client: Lafarge-WAPCO
Accountabilities and responsibilities: Integrity and soundness check on the raw mill fan, roller shaft, fan impeller, Kiln drive shaft, limestone mamuntur, VRM axle shaft, VRM roller, clinker hammer, plate feeder shaft EP fan, ID fan etc. using ultrasonic flaw detector, permanent and electromagnetic yoke and red dye penetrant.
Project/ Location: Usan Project. / New Operation Base PHC
Company /Period: Saipem Contracting Nigeria Limited / Dec 2010-Dec 2012
Client: Total E $ P Nigeria limited
Accountabilities and responsibilities: Performing MT and PT on structural and piping weld during fabrication and erection stage in fabrication yard, which includes weld edge preparation, semi finished and finished butt weld and fillet weld and other various configurations like T, K, and Y for procedure qualification and during production as per approved work procedure, code, standard specification and work instruction.
Performing radiographic inspection on plates of various thickness, pipes of various diameter using either of the following techniques with respect to the nature of the job: directional exposure, panoramic technique, super imposed technique, ellipse technique, DWDI, DWSI and SWSI technique. Using Gamma ray source as per iridium192, selenium 75, cobalt60. X-ray as per 6-16inches crawler machine, panoramic tube & directional tube X-ray machine.

Project/ Location: Bonga Project / New Operation Base PHC
Company /Period: Saipem Contracting Nigeria Limited / Dec 2011-Jan 2013
Client: SNEPCO
Accountabilities and responsibilities: Ultrasonic inspection on pipes and plates of various diameter and thickness, thickness measurement, lamination check and TKY configuration. Performing MT and PT on structural and piping weld during fabrication and erection stage in fabrication yard. Performing radiographic inspection on plates of various thickness, pipes of various diameter,

Project/ Location Ofon Project Phase 2/ New Operation Base PHC
Company /Period: Saipem Contracting Nigeria Limited / Jan 2012- March 2013
Client: Total E $ P Nigeria limited
Accountabilities and responsibilities: Lamination check and thickness measurement, performing MT and PT, Performing RT / film interpretation and documentation.

Project/ Location: Lakatabu cement plant / WAPCO Lakatabu
Company /Period: NAU Technologies Nigerian Limited
Client: Lafarge-WAPCO
Accountabilities and responsibilities: Ultrasonic Inspection on 216FA60 NDE IMEPELER WEB, 216FA60 DE IMEPELER WEB, roller shaft, fan impeller, Kiln drive shaft, limestone mamuntur, VRM axle shaft, and VRM roller

Project/ Location: ASASA UPLIFT PIPELINE PROJECT. / ASASA- VA Platform
Company /Period: Oil Field Inspection Service Limited / April 2013-June 2013
Client: Exxon mobil
Accountabilities and responsibilities: Ultrasonic Inspection on pipes, which include risers and spool.

Project/ Location: Ashaka cement plant, Gombe state
Company /Period: NAU Technologies Nigerian Limited / Oct 2013 – Nov 2013
Client: AshakaCem
Accountabilities and responsibilities: Ultrasonic Inspection on roller shaft, Kiln drive shaft, and VRM roller

Project/ Location: DELTER SOUTH AND MEJI LIVING QUARTERS INSTALLATION PROJECT
Company /Period: Arco Pipeline Solution Nigerian Ltd. / Dec 2013 - Feb 2014
Project Owner: Chevron
Client: West African Venture (WAV)
position: NDT Coordinator
Accountabilities and responsibilities:
• Ultrasonic/Magnetic Particle Inspection on piles and structural joints.
• Ensure that the required technical competence in NDE works is maintained
• Ensure that the documentation related to NDE at the Worksite is properly filed which shall be provided as part of the as-built documentation.
• Reporting to the QC coordinator / Welding Engineer / Construction Superintendent on a regular basis, and to Project’s Management upon request
• Monitoring performance of NDE in terms of quality and frequency, ensuring conformity with relevant specifications and codes

Project/ Location: FSO UNITY/ OFFSHORE
Company /Period: Mcxen Nigeria Ltd. /
Client: Total E & P Nigeria
Position: UT Inspector
Accountabilities and responsibilities: Ultrasonic Inspection on modification line

Project/ Location: OFON PHASE 2/ OFFSHORE
Company /Period: Institut De Soudure ISN. / March 2014 – Till Date
Project Owner: Total E & P Nigeria
Client: HYUNDAI HEAVY INDUSTRIES CO LTD (HHI)
position: NDT Specialist
Accountabilities and responsibilities:
• Ensure that the required technical competence in NDE works is maintained by Contractor / Subcontractor at the Worksite.
• Carry out regular inspections and audits of platform facilities to ensure NDE works achievement.
• Ensure that the documentation related to NDE at the Worksite is properly filed by Contractor / Subcontractor which shall be provided as part of the as-built documentation.
• Reviewing and approving relevant NDE documents. This includes typically NDE specifications / procedures / qualifications reports.
• Monitoring performance of NDE in terms of quality and frequency, ensuring conformity with relevant specifications and codes
• Ensuring that Contractor maintains accurate NDE records throughout the contractual period
• Reporting to the QC coordinator / Welding Engineer / Construction Superintendent on a regular basis, and to Project’s Management upon request
• Review of Site Technical Queries and NCRs related to NDE activities.
Comments
A senior multi-disciplined Inspector in oil and Gas, petrochemical and utilities sectors in Nigeria. Able to work on its own initiative and as part of a team. Proven technical and leadership skills involving managing, developing and motivating teams to achieve their objectives. Dedicated to maintaining high quality standards. Having expertise in offshore-onshore process piping and pipeline, structural welding and fabrication, corrosion control(coating), Hot Tapping, the use of non-destructive and destructive methods in determining structure’s soundness/integrity, Quality Management and Assurance with the skills in the use of international codes, specifications and standards, with a proficient ability in Computer and data Management system
Curtiss Wright Nuclear