Mistras Group
CWI will travel

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: OK Oklahoma
Country: United States
Status:
I am willing to Travel.
I need a job as soon as possible.
I prefer permanent jobs.
Certifications
AWS CWI
Education
Spartan College Of Aeronautics and Technology: Associate degree, Quality Control/TQM
Experience
Heath W Sunday
6772 Hwy 10.
Tahlequah Ok. 74464
Cell (918) 840-0281
linkedin Profile

OBJECTIVE: to obtain a position with a company that can provide opportunities for continued training, professional growth and advancements in the areas of Nondestructive testing and Quality Control.

EDUCATION: AWS CWI: code, API 1104, AWS Cert# 12042371 Exp.:4/1/2018
Tulsa Welding School. (Degree: Certified Master Welder)
Atlantic Marine (AWS: Visual Inspection Certification Class)
ASM International Certificate for Welding Inspection and Quality Control
Spartan College Of Aeronautics and Technology:
Course of study: AAS: Quality Control Technician, Major-Quality Assurance
Introduction to NDT: 94 hrs. 86 Lab hrs. Mag. Particle & Penetrant Testing
Leak Testing and Standards: 150 theory, 64 lab hrs.
Radiation Safety: 116 Theory, 64 Lab hrs.
Statistical Quality Control; 180 hrs.
Radiography: 180 hrs.
Ultrasonic Inspection: 180 hrs.
Metrology 90 hrs. /blueprints 90 hrs.
Eddy Current Inspection: 180 hrs.
T.Q.M. 90 hrs. / ISO 9000:2000 90 hrs.
Major GPA 3.84

EMPLOYMENT:

AWS Certified Welding Inspector
Private Contractor
August 2013 - Present

06/08/15 To 7-28-16 KBR: Nitrogen plant turn around, ASME B31.3 VT weld inspection process piping, witness hydros, VT civil work, walk down piping to verify correctness to ISO, weld mapping, weld testing, complete job packets.

10/01/14 To 6/05/15: Linde Process Plants: pipe walk downs to verify P&ID's, verify flanges and bolt torgues, verify fitup of pipe spools, verify valve types and flow direction, weld inspection B31.3, D1.1, PT, MT in process inspection, final inspections and dimensional inspection. Witness hydro's, receiving inspection, weld testing and verified to conform to WPS and code acceptance criteria.

2/14/14 to 3/15/14 Proenergy Services (Turnaround Shady Point power plant) Weld inspection, pipe walk downs to verify P&ID's, verify flange and bolt torgues, verify valve type and flow direction, verify spool fit up, weld mapping and PT, witness hydros, review job packets for turn over to plant at job completion.

9/2013- 11/2013 Linde Process Plants: verify P&ID's by pipe walk down, verify spool fit up, verify valve types and flow direction, verify mechanical placement and alignment, verify flanges and bolt torgues, weld mapping, witness Hydro's, weld testing and verified to conform to WPS and conform to code acceptance criteria.

9/2013 Embridge (ground disturbance training)

Sept. 25 2012 - April 2013 Natural Gas Services Group
CWI/QA (CODE ASME) verify pipe spool fit up, verify valve type and flow direction, verify mechanical placement and alignment, structural weld inspection, pressure vessel inspection, process pipe inspection, prepare U1A's, outside supplier inspections, weld testing and verified to conform to WPS and to conform to code acceptance criteria.

5-28-10 to 6-2-12 CRC Evans pipeline international
Supervisor: Charles Pendry (918) 438-2100
Position CWI/QA: Welding inspection (code D1.1), verify structural fit up, verify mechanical placement and alignment, Machine Shop Inspections: First Article Inspection, In Process Inspection, and Final Inspection. Tools used: Faro Arm, OD & ID Mics, Calipers (digital & Vernier) Depth Mics, Height gauge, ring gauges, plug gauges, profilometer, groove mic, Rockwell hardness tester...etc.

7-5-08 to 9-18-09 CRC EVANS PIPELINE INTERNATIONAL (Tulsa Ok.)
Supervisor: Al Martin (918) 438-2100
Position QA: Welding Inspection (Code D1.1), verify structural fit up, verify mechanical placement and alignment, Machine Shop Inspections: First Article Inspection, In Process Inspection, Final Inspection, and Supplier Assessments.

4-1-08 to 7-5-08 Paragon Industries, Sapulpa Ok.
Position: QA, Ultrasonic Testing.

Spartan College Of Aeronautics and Technology 2006-2008

Northeastern State College 2004-2006

02-99 to 01-02 Yuba, Tulsa, Ok. Supervisor-Robert Hendrix (918) 234-6000
Position: Fitter/ Code Welder
Field lead man (supervisor) led a crew of temp hires (10-15 hands) for the reconditioning of heat exchangers.
Dismantling heat exchanger for removal of tubes, cleaning of tube sheets, installing new tubes and reassembly of heat exchangers.

02-98 to 8-98 Earl Industries (Tide Water Temps) Jacksonville Fl.
Position Structural Ship Welder, and 13 years background of professional welding, structural, pipe, pressure vessels etc…
Comments
Willing to travel, short term, long term preferred.
Evident Ultrasonic Inspection Equipment