AWS- Certified Welding Inspector
NDE Level II MT-PT-UT-RT
Auditor
Education
High School
Some College - Design & Construction
Techincal School / Coorporate Training
Experience
24 years as QA/QC in the following industries for new construction and overhaul outages
· Power Generation: Nuclear, Fossil, Gas, Hydro and Geothermal (new construction and outages)
· Petro-Chemical: Refining, Pipeline and Compressor Stations

· Structural/Buildings: Pre-fab and on site building construction to 25 stories

Duties and Responsibilities have included but not limited to the following
· Preparation of “R” Stamp documentation for NBIC Inspector signoff.

· Monitor contractors for compliance to company QC Manuals, Quality Plans, contract and project specifications.


· Supervise/coordinate inspection and test data entries and documentation for erection and commissioning activities.
· Prepare, qualify and review welding procedures for code and project compliance and welder qualifications.
· Drawing and document review, research and verification of details, base and filler metals.
· Hands on inspections, mapping and documentation of pressure piping and structural welds.
· Site Quality Engineer performing documented surveillance’s, audits and implementation of Site Quality Plan.
· Research and verification of project specifications, code compliance, standards and materials.
· Assure environmental compliance of hazardous waste management by identifying, monitoring and proper disposal.

Education, Qualifications, Training and Certifications


· Member American Welding Society - AWS Certified Welding Inspector QC-1 Certificate #91070291
· Nondestructive Training and Certification for ASNT Level II MT-PT-UT (shear and straight beam) -RT-VT
· Auditor training with certificate of completion with Siemens Westinghouse Power Corporation
· Graduate MCHS and Design and Construction Certificate of Completion from San Juan Community College

Work history - 1981 to present..................

2/23/04 – 5/1/04: POWERPLANT MAINTENANCE SPECIALISTS, Inc. – Public Service Company of Oklahoma Northeastern Station Unit #3 and DP&L J.M. Stuart Station Unit#4 as project QA/QC.
11/3/03 – 2/20/04: Great Basin Inspection – Southern Nevada Water Authority water system expansion Project SNWA-170A of 78” diameter piping as QC Welding Inspector.
9/15/03 – 10/20/03: POWERPLANT MAINTENANCE SPECIALISTS, Inc. - Muskogee Unit #4 as QC Welding Inspector for Economizer Replacement, Soot Blower and Boiler Access modifications with other associated work scope. Preparation of “R” Stamp documentation for NBIC Inspector signoff.
3/30/03 - 5/16/03: FYI Plant Services - Southern California Edison as AWS/CWI during 2003 Spring Outage monitoring outage activities and performing visual weld inspections of Rear Reheat assemblies replacement and other associated boiler areas.
5/20/02 - 3/21/03: CDI Corporation - SIEMENS Westinghouse at OPPD Cass County Project located in Plattsmouth, NE. Erection of two Westinghouse 501F Simple Cycle Gas Turbine Generators. Same duties as project below.
5/1/01 - 5/15/02: CDI Corporation - SIEMENS Westinghouse at AECI-Holden Project located in Holden, MO. as Site Quality Engineer. Erection of three, 100 megawatt each, V84.2 Simple Cycle Gas Turbine Generators. Performance of Site QE duties and additional daily QC duties, performing weld inspections, scheduling NDE vendor, ECC documentation of construction erection and testing, etc
6/15/00 - 4/6/01: CDI Corporation - SIEMENS Westinghouse at Great River Energy Pleasant Valley Project near Rochester, MN. as Site Quality Engineer. Erection of two 160 megawatt each V84.3A Simple Cycle Gas Turbine Generators. Performed Site QE duties monitoring contractor for compliance to QC Manual, Quality Plans, inspections, testing and adherence to project specifications, etc.
5/01/00 - 5/30/00: Powerplant Maintenance Specialists Inc. - QC/Welding Inspector during scheduled power boiler overhaul outage at Public Service Company of Oklahoma Northeastern Station Unit-3 in Oologah, OK. Prepared Boiler “R” Stamp documentation for A.I. review and signoff.
11/98 - 4/00: Power Industry Consultants - SIEMENS Power Corporation Fossil Division as Site Quality Engineer during Phase II erection of Combined Cycle Power Generation Plant consisting of two V84.3A gas turbines with heat recovery boilers providing steam for an additional steam turbine generator at Bridgeport Harbor Generator Station in Bridgeport, CT. Monitored site contractors for QC Manual compliance, inspection/testing for code and specification compliance. Supervised data and document ECC completion with extended assignment for supervision of detailed completion of construction and closeout of punchlist and warranty activities.
5/97 - 10/98: Western Technologies & Allied Inspection & Testing - Parsons Infrastructure and Technologies Group performing daily weld inspections and witness/monitor of contractor during construction of Southern Nevada Water Authorities expansion projects 110-H, 110-M, 110-G, 110-L, 070A and 120-BR.
4/97 - 5/97: FYI Plant Services - Assigned to So. Cal. Edison's Mohave Generation Station as QA/QC Welding Inspector during spring boiler overhaul outage of Unit-2.
10/96 - 4/97: TAD Technical Services - SRP’s Navajo Generating Station in Page, Arizona as Boiler and Power Block QA/QC Coordinator during overhaul outages of Units 1, 2 and 3. Performed pre-outage preparation of work packages and 100% visual weld inspections of fuel oil lines replacement prior to outage.
4/96 - 6/96: Irwin Industries - Jim Bridger Generating Station Units-1 & 3 boiler overhauls as QC/CWI Inspector during replacement of Lower Rear Waterwall, Steam Cooled Floor, Screen Tubes, R/H Crossovers, Division Panels and other boiler repairs.
2/96 - 4/96 & 6/96 - 9/96: American Stores - Provided CWI services and technical NDE support during construction of their new 25 story corporate headquarters located in downtown Salt Lake City, UT.
10/95 - 2/96: Western Technologies - SRP’s Navajo Generating Station Scrubber Project in Page, Arizona, providing QC inspections to various site contractors.
7/95 - 10/95: Reinhart and Associates - Turkey Point and Port St. Lucie Nuclear Generating Stations as shift lead for Turbine steam path inspections during scheduled outages.
11/94 - 4/95: Pace Power Constructors Inc. - So. California Edison’s Los Alimitos Generating Station Unit-3 major boiler overhaul as Lead QC Inspector and Welding Supervisor. Assigned applicable WPS’s and welders, performed weld inspections, verify base materials, drawing details, etc. Prepared “R” Stamp QC documentation for A.I. review and signoff.
8/94 - 10/94: Virginia Corp. of Virginia - Oyster Creek Nuclear Generating Station at Forked River, NJ performing inspections for balance of plant, dry-well and fuel loading deck, during refueling outage.
12/93 - 5/94: TAD Technical Services - SRP’s Navajo Generating Station in Page, Arizona as QC Coordinator for boiler and power block during overhaul outages. Assigned CWI’s and NDE Technicians daily work, provide technical support to site engineers, with pre-outage work preparing work packages and welder qualifications.
5/93 - 11/93: Mobile Inspection Services - Assigned to San Onofre Generating Station Units-2 & 3 for Feed Water, Gen. Feed Rings, etc. inspections during refueling outage.
1/93 - 5/93: TAD Technical Services - SRP’s Navajo Generating Station as QA/QC Coordinator during boiler and power block outage, coordinating NDE and CWI personnel and assignments.
8/92 - 12/92: National Engineering Resources - Assigned to Braun Intertech at Prairie Island Generator Station at Welch, MN. monitored welding and performed weld inspections at bleed steam piping replacement and M.S.R. modifications and document review of NDE inspections prior to acceptance.
11/91 - 5/92: Mobile Inspection Services – SRP’s Navajo Generating Station as Vendor Lead providing NDE and CWI services during spring boiler overhaul outages, interface with client, daily assignments to CWI’s and NDE technicians, etc.
12/81 - 10/91: Mobile Inspection Services in Farmington, NM – Level II NDE Technician training, experience and certification in all methods of NDE/Weld Inspection in all types of industries including electrical generation, chemical plants, refineries, mining, fab-shops, new construction and overhaul outages.

Projects - Overhaul Outages / References available upon request
Comments
Experience as Site QE monitoring all site subcontractors for compliance to contract, project quality plans and QC Manuals. Supervise satisfactory completion of construction commissioning documentation and verify satifactory closure of project RFI & NCR's for new powerplant construction with numerous plant outages completed.
Evident Ultrasonic Inspection Equipment