Mistras Group
NDE Coordinator/Supervisor

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: MS Mississippi
Country: United States
Status:
I am willing to Travel.
Certifications
UTSW/AUTPA II inspection, PT II, RT II, VT II
Education
M.G.C.C.C -Ass. Business/Construction Management, GED
Experience
Qualifications/Certifications:
API-RP-578 Positive Material Identification (PMI) XRF and OES Technologies
(Don Mears Certification)
Extensive knowledge of Niton Data Transfer software for all analyzer reports.

ASNT TC-1A N.D.T
-UT Level II straight beam/UTT and UTSW experience, automated UT(AUT),
Plate and Kraut Kramer experience, mild Phased Array and TO FD experience.

-RT Level II Industrial Digital radiography and film interpretation, familiar with
safety procedures and collection/documentation of film badges and
dosimeters.

-PT Level II Dye Pen and Fluorescent Experience

-VT Level II, spiral weld and girth weld submerged arch weld inspection
(DSAW).

-Proficient in Word, Excel, and Power Point, Familiar with in depth
work instructions and procedures, API-5L, API-1104, ISO 9001. Extensive
knowledge of AWS and ASME codes. Great organization/communication and
analyzing skills.

-Proficient in auditing, root cause analysis, configuration management,
corrective and preventive action, statistical processes and, process capability,
qualitative and quantitative analysis, QMS, calibration systems, conflict
resolution, gage r&r, and other standard quality tools and techniques.
Knowledge of reading and understanding blueprints, managing orders,
change orders, etc.

-In the process of receiving Six Sigma Black Belt certification looking to
receive late 2011

-OSHA 30 hr safety

-TWIC card

-Gulf Coast Safety Committee card

-Chevron Refinery IFF card

- Familiar with spiral and straight seam pipe-FBE and ARO Coating
Inspection, Gauze readings, holiday geeper calibration, Utility inspection,
project management and managing others.



NDE HOURS:
UTT: (10,000+)
UTSW: (8,000+)
AUTSW: (5,500+)
AUTPA: (3,000+)
RT: (1,200+)
PT: (1,000+)
MT: (400)
VT: (10,000+)
PMI: (120)

Employment History/ Job Duties:
02/2011-Present
American Inspection Services (AIS) Chevron Pascagoula
NDE Site Supervisor: utilize multiple NDT methods such as UTT, UTSW,
AUTPA, MT, PT inspection as well as visually inspection on tanks, vessels,
exchanges, ect. Conduct and coordinate all UTT, UTSW and AUT/Phased Array
inspections to be performed through Chevron reps. Create daily in-depth
inspection reports utilizing Omni scan and TomoView as well as auto-cad
designed diagrams of units inspected. Follow in depth prints to configure
designated UT/RT points of inspection. Meet with chevron reps daily for job
permits and designated control rooms for site/plant of inspection.
01/2011-02/2011
SPT Energy
A Global project service provider for the Oil and Gas Industry
NDE lead/coordinator, Witness all AUT/MUT & Skelp UT calibrations. Review
an interpret all x-ray film for end and repair shots. Monitor all lab hardness
test tensile test and all other destructive testing required per customer
specification. Create in depth daily with excel and ms word reports on the
mills production rate and downtime. Write NCR’s , whiteness , record and
collect all lab result charts such as clean out reports, charpies, hardness and
tensile test. Collect and file all AUT calibration strip charts.
11/2010-01/2011
National Engineering Resources
PDM Bridge (Palatka, FL)
Perform UTSW 70/60 degree inspection on all bridge components such as,
knuckle girders, stifners, webs, flanges, ect to AWS D1.1 code. Calibrate all UT
units (panametrics Epoch4B and KrautKramer USN58L) and create daily in
depth accept/reject reports with excel on all units that where scanned daily.
01/2010-11/2010
Moody International-
A leading third party inspection service.
Copano Project, Spiral Mill (DSAW)
Whiteness and record all calibrations for AUT Kraught Kramer unit, Phasar
hand held phased array units and hydrostatic testing, to assure all customer
specifications were meet and or exceeded. Interpret all digital x-ray shots and
record all rejects for AUT, MUT, RT, and hydro.
Sempra Project, Spiral Mill (DSAW)
Monitor and record all line pipe that is UT inspected (AUT and MUT), x-rayed
and hydro tested. Document all weld repair pipe and insure that all API and
customer standards are meet or exceeded. Give in depth daily reports on all
daily activity.
Enterprise Project
Monitor and record all pipe inspected with crab style UT and MUT per
Tuboscope. Document all acceptable/rejectable pipe. Whiteness all UT
calibrations to assure the customers requirements were meet or exceeded.
Copano Project, Spiral Mill(DSAW)
Whiteness and record all calibrations for AUT Kraught Kramer unit, Phasar
hand held phased array units and hydrostatic testing, to assure all customer
specifications were meet and or exceeded. Interpret all digital x-ray shots and
record all rejects for AUT, MUT, RT, and hydro.
Elpaso, Ruby Pipeline Project Spiral Mill(DSAW)
Third Party NDT/Phased Array(Omni scan and crab style units) and TOFD
Inspection/Audit, Double Jointer Inspector, Manual prove-up, AUT, and
Digital radiography inspection. Double Jointer visual inspector, logging all
heat numbers, pipe numbers and all double joint numbers with daily in depth
reports. Review x-ray film and interpret digital x-rays of girth welds and
make sure all pipe coincide with a minimum of API5L specifications. NCR’s as
needed.
Elpaso, SONAT Project, Straight Mill(DSAW)
Final Bench inspection/ computer entry of all dimensions and tracking of all
pipe numbers, load out tracking, and film interpretation.
BP Project
Coating inspection-verify all holidays, with two part patches or stick patches,
calibration of geepers, line speed/temp, track numbers per load out.

06/2009-01/2010
OMC Inspection- Straight Mill (DSAW)
A leading third party inspection company in the oil and gas industry.
ETC, Tiger Pipeline Project
Third party NDT & Final Bench Mill Inspection, Visual Coating Inspection,
logging and tracking of pipe numbers, heat numbers ect. In-depth daily
reports.

02/2007-05/2009
PSL North America, Spiral Mill (DSAW)
A leading spiral seam pipe mill (oil and gas)
Florida Gas Transmission Phase VIII Project
Mill jointing QC supervisor- Manually/automated UT and visually inspect
according to API 5L and API 1104, correlate different incoming pipe to
become
match able, create employee schedules and supervise others. NDT tech. UT,
RT, PT,VT. Run AUT Kraut Kramer unit and AUT inline skelp unit on a daily
basis along with Omni scan phased array MUT unit.

11/2006-02/2007
PSL North America –Construction Manager/coordinator – Read and follow blue
prints, manage others, coordinate incoming and outgoing orders and sub
contractors. Manage supply orders, change order, etc. soil inspection,
concrete/form inspection, structural steel inspection and all other phases of
construction.

01/2002-10/2006
F.E.M.A.
QA Engineer Assnt./Inspector-Assist with quality engineer extensive
paperwork and ROE’s , meet with homeowners, assess properties.

06/1999-12/2001
Manufab East
Visual weld inspector/NDT Level I– UT Thickness and PT inspect, submerged
arch, Flux core and stick welds. Visual inspection to meet all customer
specifications.



Education:
PRCC-GED
MGCCC- Associates Technical Science Construction/Business Management
PRCC- Six Sigma and all level II classes
4yrs. Vo-tech welding classes/certification
Comments
Great organization and communication skills
Evident Ultrasonic Inspection Equipment