Mistras Group
API 510-570-571 Inspector

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: IL Illinois
Country: United States
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
Certifications
Richard B. Burrow
1302 Main St.
S. Roxana IL 62087
618-917-4723
rburrow81@yahoo.com

I am a hard working individual who has 9 years experience in the refinery
inspection business, a team player, and task orientated.

Certifications:
*API 510 inspector
*API 570 inspector
*API 571 supplemental certification
*CP (South Africa pressure vessel inspector)
*OSHA 10 hr.
*TWIC card
*Current USA Passport

Areas of Expertise

• Repair recommendations
• Turnarounds/Expansions
• Maintenance Inspections
• Mechanical Integrity
• Quality Inspections

Professional Strengths

• Knowledge of industry standards and regulatory codes including API,
ASME, ASTM, OSHA, AWS and ASNT.
• Computer proficiency; familiarity with Microsoft applications and
inspection programs.
• Strong organizational skills, self-motivation, and ability to prioritize tasks
effectively.
• Solid communication and interpersonal skills; ability to form effective
working relationships with a diverse range of personalities.


January 2011-Present – Conoco Phillips, Wood river, IL. Initiation of a plant
wide CUI inspection program for various pressure vessels.

December 2010- Holly Corp, Tulsa. Plant wide shutdown API 510 inspections,
and repairs on vessels and drums.

October 2010-November 2010- Valero, TX city. GOHT turnaround API 510
internal and external inspections on various reactors on trains #1 & #2 repairs
etc.

August 2010-September 2010- Sasol, South Africa Rectosal Turnaround. API
510 / CP internal and external inspection on various towers, drums and
following various repairs.

July 2010-August 2010---Tesoro, HI plant wide turnaround. API 510
inspections exchangers/ bundle pad.

April 2010-May 2010--- IENOS Chocolate Bayou, TX. Olefins #1 TA API 510
inspections.

March 2010-April 2010—Conoco Phillips, Wood river IL. FCCU2 unit
Turnaround API 510/570 inspections.

January 2010-Febuary 2010—Marathon, TX city. HF alky unit Turnaround API
510 inspections.

December 2009-January 2010-Conoco Phillips, Woodriver, IL. NHT
Turnaround. API 510 internal and external inspections.

November 2009-December 2009-Conoco Phillips, Woodriver, IL. CR-3
Turnaround. API 570 inspections QA.

September 2009-October 2009—Conoco Phillips, Wood river, IL. HCU, SMR,
CR-1, and SGP Turnaround. API 510, 570 internal, external inspections, and
repair recommendations.

August 2009-September 2009— South Africa, Sasol T/A Rectosal unit. CP/API
510 internal & external inspections on various pressure equipment.

March 2009-April 2009—Hunt, Tuscaloosa. Hydrobon/DHT/ Hydrogen
plant/Coker T/A API 510 internal and external inspections.

Feb 2009-March 2009—Conoco Phillips, Woodriver. Coker T/A API 510/570
internal and external inspections.

Jan. 2009-Feb. 2009—Navajo refinery, Artesia, NM. HF alky T/A API 510/570
internal and external inspections of various pressure equipment.

October 2008-November 2008--Marathon, HF alky T/A API 510/570 internal
and external inspection of various pressure equipment.

Aug. 2008-Sept 2008—South Africa, Sasol T/A Rectosal unit. CP/API 510
internal & external inspections on various pressure equipment.

May 2008-June 2008—Frontier, Cheyenne. Plat former & NHT units T/A API
510 internal and external inspections of various pressure equipment. (Bundle
Pad)

Feb. 2008- April 2008----Sunoco, Philly. FCCU & Crude units T/A API 510
internal and external inspections of various pressure equipment.

January 2008-Feb. 2008—Exxon Mobil, HF alky T/A API 510/570 internal and
external inspections of various pressure equipment.

Nov.2007-Dec.2007---Marathon, HF alky T/A API 510/570 internal and
external inspection of various pressure equipment.

Oct.2007-Nov.2007—Frontier, HF alky T/A API 510 internal and external
inspections of various pressure equipment.

Sept. 2007-Oct. 2007—Conoco Philips, Woodriver, IL. API 570 inspections for
tie in lines of new unit construction.

Aug. 2007-Sept. 2007—South Africa, Sasol T/A Rectosal unit. CP/API 510
internal & external inspections on various pressure equipment.

June 2007-Aug. 2007--Frontier Refinery, Eldorado, KS. API 570-external’s
plant wide.

April 2007- June 2007- API 570 work, TML selection of piping and
components in the Coker and Crude units at Conoco Phillips refinery.

Feb. 2007- March 2007- South Africa, Sasol T/A Gasafyer. CP/API 510 work,
internals, & external inspections, hydros, Columns, drums, vessels, and heat
exchangers.

November 2006- Jan. 2007—Plant wide structure inspection of various unit
and IDP piping structural supports. (Conoco Phillips)

October 2006—Catalyst Reformer 1 T/A internal and external on various
pressure equipment, QA of monel overlay project in our caustic water wash
column, inspection of flange make ups/ finishes, PRV installation, exchanger
and bundle inspection etc.

Feb. 2006-Sept. 2006—Plant wide Mix point inspection RT profile, and UTT.

November 2005-Feb.-2006 --Cat cracker 3 at distilling west preliminary
inspection and NDE of unit equipment and piping to restart unit, @ time of
inspection the unit has been shut down for several years.

October 2005— CR 3 unit T/A inspection of vessels, piping, flange make-
ups/ finishes.

Jan. 2005- October 2005-Field services pipeline inspection RT weld quality,
assist with GUL, worked at various fabrication shops.

November 2003- December 2004—Plant wide run and maintain projects in
Alky,
Aromatics and CR units. (RT profile and UT testing.)

October 2003-- Distillery 2 T/A internal inspections and various NDE of
pressure equipment.

Jan. 2003-October 2003-Field services worked at various fabrication shops,
power plants
Etc. RT weld quality, MT, PT, PMI, UTT.

May- 2002-Jan. 2003- Plant wide run and maintain program, pipe rack
inspection and several different units, visual, profile RT and UT inspection of
various piping.

April 2002—Cat cracker unit T/A (NDE)

Feb 2002—Crude unit Hartford integration project, internal inspection of
vessels, and columns. (NDE)

Jan 2002 – Coker unit Hartford integration project, internal inspection of coke
drums, vessels, columns. Ultrasonic testing, MT, PT, and ACFM.

October 2001—DU1 T/A inspection of distillery and vacuum flasher unit,
internals on vacuum column, and several internals on exchanger shells.
(Ultrasonic, MT, and ACFM.)






Thank you for your time

Richard Burrow



Magnaflux