Mistras Group
Seasoned Level II MT PT UTT VT RT Asst.

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: NC North Carolina
Country: United States
Status:
I am willing to Travel.
I need a job as soon as possible.
I prefer permanent jobs.
Certifications
 Level IIA Ultrasonic Thickness (UTT) 40hrs/ Certified

 Level II Visual Testing (VT) 24hrs/Certified

 Radiation Safety Training 40hrs/Certified

 Level II Magnetic Particle Testing 24hrs/Certified 280
Documented on the job training hours for MT

 Level II Liquid Penetrant Testing (PT) 16hrs/Certified

Education
Level IIA Ultrasonic Thickness (UTT) 40hrs/ Certified

 Level II Visual Testing (VT) 24hrs/Certified

 Radiation Safety Training 40hrs/Certified

 Level II Magnetic Particle Testing 24hrs/Certified
280 Documented on the job training hours for MT

 Level II Liquid Penetrant Testing (PT)
16hrs/Certified

 Over 1000 OJT Hours for RT (Gamma Only)



 Replications/ Notis Training 40hrs
Experience
 International Paper Savannah,GA Full Unit Sweep 18
days
 International Paper Georgetown,SC MT, PT, UT, and VT
on Impregnation Vessel and Continuous Digester 14 days
 Southern Company/Georgia Power Macon,GA MT, PT, and
UT Profile of Power Boiler 14 days
 International Paper Augusta,GA MT, PT, and UT on
Digester and Impregnation Vessel 10 days
 Georgia Pacific Pennington,AL UT Profile of Recovery
Boiler 7 days
 Imperial Sugar Port Wentworth,GA UT on Power Boiler
Main Steam lines and Sprinkler Systems 5 days
 Weyerhaeuser Paper New Bern,NC UT Profile of
Recovery Boiler 14 days
 Mead Westvaco Covington,VA UT Profile of Power and
Recovery Boiler 14 days
 Eastman/Arkema Cortland,VA UT on 50% Caustic Tanks 5
days
 RT Shoot for full Nose Arch Replacement in Recovery
Boiler 3 Weeks
 RT Shoot for Full Main Steam Line Build 4 months
 RT Shoot for New Boiler Construction 1 year
 100% MT/VT Turbine Inspection/Boiler feed pump
Turbine Inspection 4 weeks

 Assisted in Performing an Auto Crawler Inspection of
a Chip Silo
 Collected “Raw” (never recorded by company in the
past) UTT Data from a horizontal middle economizer
 Assisted in Wire Rope inspection of Wood Yard Crane
 Assisted in Guided Wave Piping Inspection
 Internal and External MT/VT Dryer Can Inspection 20
cans in 2 days by myself.
Curtiss Wright Nuclear