Curtiss Wright Nuclear
NDT LEAD - ISO 9712 LEVEL III

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Nigeria
Status:
I am willing to Travel.
I prefer permanent jobs.
Certifications
PCN (PERSONAL CERTIFICATION FOR NON-DESTRUCTIVE TESTING
(www.bindt.org) PCN number: 320872
Phased Array Ultrasonic Testing PAUT – Level 2

CSWIP ISO 9712 CERTIFICATION FOR NDT PERSONNEL
(www.cswip.com) #000713975
Ultrasonic Testing Level 2
Dye Penetrant Testing Level 2
Magnetic Particle Inspection Level 2
Basic Radiation Safety Level 1

INDEPENDENT PERSONNEL CERTIFICATION ISO 9712 LEVEL 2
(www.iandtcb.org) #9100192
Radiographic Testing
Radiographic Film Interpretation

INDEPENDENT PERSONNEL CERTIFICATION ISO 9712 LEVEL 3
(www.iandtcb.org) #9100192
Phased Array Ultrasonic Testing
Ultrasonic Testing
Radiographic Testing
Magnetic Particle Testing
Dye-penetrant Testing

AMERICAN SOCIETY FOR NON-DESTRUCTIVE TESTING
ASNT Level 2
Ultrasonic Inspection For Plate, Pipe and Node
Phased Array Ultrasonic Testing
Radiographic Testing Inspection
Radiographic Film Inspection
Magnetic Particle inspection
Dye-penetrant Inspection
Education
National Technical Certificate May/June 2001
Federal Craft Certificate May/June 2001
Federal Ministry Of Labour and Productivity April 2005
Diploma (Mechanical Technology) 2004
Bachelor of Science Bsc in Mechanical Technology2012
Experience
Project/ Location: Saipem Contracting Nigeria Limited, Port Harcourt.
Period: Sept 2006 - March 2014
Position: NDT Technician
Accountabilities and responsibilities:
Magnetic Particle Testing Inspection - Fluorescent and Visible contrast Inspection using Yoke and Prod Technique on Excavated area, Bevel Joint, Temporary attachment, Plates (thickness 3mm – 120mm), pipes (Diameter 2Inches – 48inches), Tee Joint, Nozzles Joint and Node Joint configuration, Piles (3m – 4m Diameter), Circular and longitudinal seam, Forged and casting material on carbon steel.

Dye-Penetrant Inspection - Fluorescent and Visible contrast Inspection of Solvent Removable and water washable techniques on Excavated area, Bevel Joint, Plates, Pipes, Tee Joint, Nozzles and Node Joint. On Carbon steel, Stainless steel, Inconel, duplex, Aluminum, Forged and casting materials.

Ultrasonic Testing Inspection - A-scan Pulse Echo Techniques on Plates, Pipes, Tee Joints, Nozzles and Node (thickness 8mm-70mm, Diameter 3inche – 48inches), Piles 3m – 4m Diameter.

Radiographic Testing – Gamma-ray Inspection Using Ir-192 and Se-75 on plates (thickness 8mm-70mm), Pipes (Diameter 3/8inche – 48inche).
X-ray Inspection using 120KV – 360Kv and 0.5mA -5mA Panoramic and Directional X-ray tubes on tubes, Plates, Pipes and Tie-in Joint.
Techniques – SWSI, DWSI and DWDI.

Radiographic Film Interpreter – Interpretation of Radiograph for several materials like – Carbon steel, Inconel, SS, Duplex and Copper Nickel material welded with several welding process like: MMAW, FCAW, GTAW, MIG/MAG & SAW.

Project Execution.
PROJECT NAME SUBCONTRACTOR WORK LOCATION PROJECT OWNER PROJECT DURATION
Amenam Kpono Saipem New Operation Base Port Harcourt / Amenam Platform Offshore Total E $ P Sept 2006 - Dec 2007
Akpo Project Saipem New Operation Based Port Harcourt Total E $ P May 2007 – Feb 2008
Nembe Project. Saipem New Operation Based Port Harcourt SPDC Feb 2008 - July 2008
Gbaran Ubie Pipeline.. Saipem contracting Nig LTD / Yenegoa , Bayelsa State SPDC Nov 2008 - July 2010
Usan Project. Saipem Contracting Nig LTD, New Operation Based Port Harcourt Total E $ P Jan 2009 - Dec 2012
Bonga Project Saipem Contracting Nig LTD, New Operation Based Port Harcourt SNEPCO Dec 2011-Jan 2013
Ofon Project Phase 2 Saipem Contracting Nig LTD, New Operation Based Port Harcourt Total E $ P Jan 2012- March 2013
ASASA UPLIFT PIPELINE PROJECT. Saipem Contracting Nig LTD, New Operation Based Port Harcourt MPN April 2013-June 2013


Company /Period: Institut De Soudure ISN. / March 2014 – March 2019
Period: March 2014 – May 2019
Position: NDT Specialist / QC-NDT LEAD
Accountabilities and responsibilities:
• Ensure that the required technical competence in NDE works is maintained by Contractor / Subcontractor at the Worksite.
• Carry out regular inspections and audits of platform facilities to ensure NDE works achievement.
• Ensure that the documentation related to NDE at the Worksite is properly filed by Contractor / Subcontractor which shall be provided as part of the as-built documentation.
• Reviewing and approving relevant NDE documents. This includes typically NDE specifications / procedures / qualifications reports.
• Monitoring performance of NDE in terms of quality and frequency, ensuring conformity with relevant specifications and codes
• Ensuring that Contractor maintains accurate NDE records throughout the contractual period
• Reporting to the QC coordinator / Welding Engineer / Construction Superintendent on a regular basis, and to Project’s Management upon request
• Review of Site Technical Queries and NCRs related to NDE activities.
•Writing of UT, RT, MT, PT and VT procedure on Piping, structural, Pipeline and pressure vessel as per client Specification.
• Qualification of UT, RT, MT and PT Technique sheet.
• Radiographic film interpretation on various radiographic techniques:
• Qualification of UT, RT, MT and PT Personnel.

Project Execution.
PROJECT NAME CONTRACTOR CLIENT PROJECT OWNER PROJECT DURATION
OFON PHASE 2/ OFFSHORE HYUNDAI HEAVY INDUSTRIES CO LTD NA TOTAL March2014-Sept2015
EGINA PROJECT AVEON OFFSHORE FMC TOTAL Sept2015 - June2019
EGINA OLT BOUY AVEON OFFSHORE NOV TOTAL Sept2015 – March 2019
OSO-QIT GAS PIPELINE PROJECT AVEON OFFSHORE DELTA AFRIK EXXON MOBIL May 2017 - May 2019
EAP-IGE REPLACEMENT PROJECT AVEON OFFSHORE DELTA AFRIK EXXON MOBIL Dec 2017 – Nov 2018
AGBAMI PHASE III AVEON OFFSHORE FMC CHEVERON Sept 2016 –Dec 2018
UBIT GP RESTORATION PROJECT AVEON OFFSHORE DELTA AFRIK EXXON MOBIL March 2018 – May 2019
SSSGEPP AVEON OFFSHORE SAIDEL SHELL Feb 018 – Dec 2018
Escravos Export System Project EESP AVEON OFFSHORE DeltaTek CHEVERON May 2018- May 2019
OML 52 TUBU WHP, PIPELINE & UMBILICAL EPCI PROJECT AVEON OFFSHORE AMNI INTERNATIONAL NNPC JUNE-2018 – May 2019
ANYALA WEST & MADU FIELDS PROJECT AVEON OFFSHORE AQUATERRA FIRST E & P
/ NNPC September 2018 - May 2019

Short Intermittent Work with ISN.
Project/ Location: Egina / Dermarlong Nigeria Limited, Agege Road Lagos
Company /Period: ISN / March 2015
Client: Total
Position: UT Cross checker
Accountabilities and responsibilities: Conducting UT and MT competency test on personnel.

Project/ Location: Egina / Nigerdock, Snake Island Lagos
Company /Period: ISN
Client: Total / April-June 2015
Position: UT Cross checker
Accountabilities and responsibilities: Conducting UT and MT competency test on personnel, UT cross check on all long seam and circumferential seam.

Project/ Location: Egina / EWT Yard, Nestoil, Abuloma, Rivers state.
Company /Period: ISN / June 2015
Client: Total
Position: UT Cross checker
Accountabilities and responsibilities: Conducting UT and MT competency test on personnel, UT cross check on all long seam, circumferential seam and top plate structure.


Project/ Location: PEWCAT LIMITED, Port Harcourt.
Period: June 2019 – Till Date
Position: QC-NDT LEAD
Accountabilities and responsibilities:

• Ensure the proper Non-Destructive Inspection Technique of PEWCAT product to meet industrial standards and customer specifications.
• Develops coordinate and directs the maintenance and calibration of NDT equipment to ensure proper inspection in compliance recommendations and industry standards
• Supervising all NDT Technician on site.
• Interviewing / qualifying prospective NDT candidates.
• Supervising / Monitoring the NDT works on site: Visual Testing, Radiographic Testing, Ultrasonic Testing, Phased Array Ultrasonic Testing, Magnetic Testing, Dye Penetrant Testing.
• Maintain an update inventory list of all NDT equipment.
• Provide expert advice with regards to NDT issues and QA-related projects involving manufacturer practice and the final decision for the acceptance or rejection of potentially nonconforming product.
• Mediate between client and Company.
• Preparation and review of NDT procedures.








Project
PROJECT NAME CONTRACTOR CLIENT PROJECT OWNER PROJECT DURATION
OML 52 TUBU WHP, PIPELINE & UMBILICAL EPCI PROJECT AVEON OFFSHORE AMNI INTERNATIONAL NNPC JUNE-2019 - Ongoing
ANYALA WEST & MADU FIELDS PROJECT AVEON OFFSHORE AQUATERRA FIRST E & P
/ NNPC JUNE-2019 - Ongoing
BONGA MAIN WELL DOUBLER AVEON OFFSHORE GE SHELL November 2019 – ongoing
Comments
To work in a global environment by utilizing my ability, knowledge and logical thinking to the best and to improve and upgrade my skills according to organizational needs.

I am familiar with welding processes like shielded metal arc welding (SMAW), Gas tungsten arc Welding (GTAW), Submerge arc welding (SAW), Flux core arc welding (FCAW), Gas Metal arc Welding (GMAW). Materials like, Low and medium carbon steel, ferritic stainless steel, austenitic stainless steel, etcetera. Including the use of international code such as: ASME B31.1, B31.3, B31.4, B31.8, ASME VIII, ISO, API 1104, AWS D1.1, API-RP-2X, ASME V, ABS Guide for NDT and others
Mistras Group