Evident Ultrasonic Inspection Equipment
API 570/QUTE,AWS CWI, Multi-cert Level II w/Level 1 Rope Access

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: IL Illinois
Country: United States
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
I prefer permanent jobs.
Certifications
• API 570 (87% cumulative score), API QUTE, AWS CWI
• Level II MT, PT, UT-S, RT, PMI, Hardness
• Level 1 Rope Access Technician
• OSHA 10 hr. safety certification.
• Transport Workers Identification Credential (T.W.I.C. card)
• ASM International (Materials Engineering Institute) certification for Welding Inspection and Quality Control.
• Texas Industrial Radiographer Card and reciprocity in Illinois.
• Guided wave Ultrasonics training, Phased Array ultrasonics training.
Education
•Elevated Safety, Glenview, IL, July 2011;
Rope Access Level 1
•Mark Smith Training Services, May 2011;
API 570 course
•Guided Ultrasonics Ltd., October 2009
GUL level 1
•University of Ultrasonics, April 2009 & August 2009
Shearwave Advanced Sizing & Detection(April)
Phased Array (August).
•Hobart Institute of Welding Technology, April 2007
CWI training & Certification
•Spartan School of Aeronautics, spring 2001,Tulsa, OK
4.0 G.P.A.; ASME Certified in Welding Inspection & Quality Control; 180 hours training to ASNT Level II in MT(60hrs), PT(60hrs), ET(60hrs), RT(180hrs), UT(180hrs), Codes & Standards(180 hrs), VT & LT (per SNT-TC-1A). 180 hours Radiation Safety.
•University of Missouri, August 1992 – May 1994 Rolla, MO
- Mechanical Engineering studies, 60 credit hours completed.
Experience
•6/15/08 – Present - Petrochem Inspection Services
7/29/11 –Acquired Rope Access Level 1
6/01/11 – Acquired API 570
4/30/10 – Acquired API QUTE
Multi-certified Level II Technician performing inspection for clients utilizing all current level II certifications as pertaining to client’s needs, including but not limited to visual weld inspection & Ultrasonic Shearwave Examination.
Site Manager, Exxonmobil-Joliet, IL: October 2009 – August 2010
6/17/09 – 8/1/09 MT & UT inspection of wind turbine tower sections, La Ventosa, Mexico

•3/28/08 - 6/12/08 - Conam Inspection, Chicago, IL
Multi-cert Level II Technician performing callout work for clients as required. Visual weld inspections, UT Shearwave, etc.
•09/20/06 – 03/24/08 - Acuren Inspection (formerly U.S. Inspection), Chicago, IL
Project lead on OSIP program @ ExxonMobil-Joliet, lead crew comprised of 6 technicians and assistants.
Level II RT inspection @ D.C. Cook Nuclear Plant fall outage ‘07
CWI visual weld inspection performed for clients in the Chicago area
Level II UT Shearwave inspection performed for various clients in the Chicago and Indianapolis areas.
Various level II inspections for clients of the Chicago & Indianapolis labs.

•08/29/05 – 09/16/06 - Longview Inspection/Acuren Inspection St. Croix, USVI
Contract Technician with Longview/Acuren Inspection at Hovensa Oil Refinery, St. Croix, U.S. Virgin Islands.
09/01/05 – 12/15/05 Contract Technician for Turnarounds, performing MT, PT, UT, VT & RT assist.
12/15/05 – 04/10/06 F.A.C. detection with Longview piping group.
04/10/06- 09/16/06 RT assist, MT, PT & UT with Longview base-plant group
•06/06/05 - 06/30/05 - Applied Technical Services, Marietta, GA
Contract technician performing F.A.C detection at Rayonier paper mill, Jesup, GA.
Performed UT, VT and MT inspections at Jefferson-Smurfit paper mill in Hopewell, VA.
•04/02/05 – 05/05/05 – Petrochem Inspection, Houston Tx
Contract Technician performed inspection at Cholla power plant, Holbrook, AZ and Four Corners Power Plant, Farmington, NM
Performed inspections as required per work scope including PT, MT, UTT, VT and remote visual inspection using the Storz Boroscope.
•03/09/05-03/21/05 – NER, Inc. subcontracted to ATS, Marietta, GA
Contract NDT Inspection at paper mills located in Northeastern Alabama & Southeastern Georgia.
Performed NDT inspections as required per project, including visuals.
•01/28/05-2/17/05 - IESCO- Page, AZ
Contract NDT Inspection at Salt River Project- Navajo Generating Station.
Performed UT thickness (including but not limited to F.A.C.) as well as VT, PT and MT.
•10/2004-11/2004 - ELITE INSPECTION SERVICES, INC. Hobart, IN
Contract NDT Inspection, Citgo Refinery, Lemont, IL for fall turnaround
Contract NDT Inspection at Marathon Ashland, Canton, OH-
Performed PT and UT Thickness, assisted in MT and RT
•9/2004- 10/2004 PDS Technical
Contract Level II PT Technician at Smith’s Aerospace in Terre Haute, IN



Comments
Currently working for Petrochem Inspection Services. I am primarily looking for Nuclear Outage work, as I have an agreement with my employer regarding such work. I've been trained in guided wave ultrasonics as well as phased array ultrasonics in addition to having been site manager at Exxonmobil Refinery in Joliet/Channahon, IL. I've been trained on GE's new DXR (digital radiography) system. Most recently I've obtained my API 570 and Level 1 Rope Access certification.
Mistras Group