Applied Technical Services
UT / WI Inspector

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
Currently working but always looking.
I am willing to work overseas.
I prefer temp jobs.
Certifications
Time Of Flight Diffraction (TOFD) training by NDT Instruments : 3 Days TOFD Training
NDT : Qualified PCN Level 2 (3.1, 3.2, 3.9) Ultrasonic Testing
: PCN Number ; 211639 (F006-332 1134)
:Qualified PCN Level 2 (Weld Inspector)
: Qualified ASNT Level 2 Magnetic Particle Inspection
(In-House)
: Qualified ASNT Level 2 Dye Penetrant Testing
(In-House)
Others

§ Driving License : B & D
§ Malaysia International Passport (Expiry Date : 14 April 2010)
Education
Technical Qualification & Course
Education : Higher National Diploma in Industrial Engineering
: Sijil Pelajaran Malaysia (SPM).
Experience
Over 5 years of experience for oil and gas industries, onshore and offshore in the field of Plant Inspection, Quality Assurance, Quality Control, Inspection of Materials, Welding inspection, and in the oil and gas related industries i.e. shop/yard fabrication, plant maintenance, plant turnaround, offshore hook-up/installation,and offshore maintenance work complying to the safety standards, clients specification requirement and relevant code of practice.

Code Familiarity: ASME 5, ASME 8, ASME9, ANSI B31.1, B31.3, AWS D1.1.,AS4037-1999, GIS 46-010, API RP2X.
Comments
July 2008-Present
Company : Malaysia Marine Heavy Engineering, MMHE(Contract Basis)
Position : UT Inspector
Project Details : Gumusut Kakap Project Semi FPS.
: To perform UT inspection on Hull & Topside structure, i.e T,K,Y joints, Lifting Tower parts (crane machinery parts and other parts as per project requirements.
Client : MISC Berhad & Shell Sabah Petroleum Company (SSPC)
Duties : Working together with UT Cross Checker of SSPC to carry out UT Inspection as per project specification for MMHE. Also, as per client requirement, do the UT Cross Checking on the Lifting Tower parts (crane machinery).


May 2008-June 2008
Company : Oilfield Pipeline Inspection Sdn Bhd (Contract Basis)
Position : NDT Tech
Project Details : NORTHERN ARTHIT DEV. AWP-2N PLATFORM JACKET INSTALLATION. (Thailand Offshore)
: To perform NDT inspection on the main structure of jacket and any other parts of platform.
Client : NIPON STEEL ENGINEERING CO. (NSEC)
Duties : Carry out Visual Inspection, Lamination Check, Ultrasonic Testing Flaw Detector (UTFD), and MPI inspection as per project specification for NSEC.


August 2007-May 2008
Company : Care Ion Technologist Sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : Various Project of Jord Malaysia
: To perform NDT inspection on the various parts of Air Cooler System.
: CCGT CONVERSION PROJECT-PLANT REGENERATION GAS COOLER CASE-KUPE GAS PROJECT-DAS ISLAND HABSAN ABU DHABI-MILA COMPRESSOR STATION & etc.
Client : JORD MALAYSIA SDN BHD (JMSB)
Duties : Carry out Visual Inspection, Ultrasonic Testing Thickness Measurement (UTTM), Ultrasonic Testing Flaw Detector (UTFD), MPI & DPI inspection as per project specification for JMSB.
: Prepare the Weld Traceability Record for NDT Inspection to ensure all parts for inspection are carried.

June 2007-July 2007
Company : Care Ion Technologist Sdn Bhd (Contract Basis)
Position : NDT Tech cum QC Inspector
Project Details : CRANE INSPECTION BUNGA RAYA ECHO (BRE)
: To perform NDT inspection on the Crane and Boom-Crane structure and also the Pedestal Crane structure.
: BRA-BRD BRIDGE INSPECTION (BRA)
: To perform Visual and NDT Inspection on the connection bridge.
Client : TALISMAN MALAYSIA LIMITED (TML)
Duties : Carry out Visual Inspection, Ultrasonic Testing Thickness Measurement (UTTM), Ultrasonic Testing Flaw Detector (UTFD), and MPI inspection as per project specification for Talisman. Took the picture from all joints inspected for the evidence to enclosed with the NDT report. Prepare the Final Inspection report by compiling all the visual, pictures and NDT inspection report for client and also give the recommendation to the client for the safety of the bridge structure.

May 2007- June 2007
Company : LJ Inspection Sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : 2007 TURNAROUND GPP 2
: Vessel, Reactor, Column and piping inspection for routine shutdown maintenance.
Client : Petronas Gas Berhad
Duties : Carry out Ultrasonic Testing Thickness Measurement (UTTM) inspection as per project specification for GPP 2.

Mac 2007- April 2007
Company : Intisari Mulia Engineering sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : Minor Inspection on Monorail Beam at CKR-CTOC PLATFORM (OFFSHORE).
: Troubleshoot inspection on 2” Ø of tubing on the Boiler in Engine Room at FPSO-PERINTIS.
Client : SIEMENS LTD, GERMANY.
Duties : Carry out Ultrasonic Testing Flaw Detector (UTFD) as per project specification for CTOC.
: Carry out Ultrasonic Testing Thickness Measurement (UTTM) as per project specification for FPSO-PERINTIS.

February 2007 - Mac 2007
Company : Care Ion Technologist Sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : DTU Flowlines – UT straight Beam Scan, Kikeh Platform (OFFSHORE) Labuan.
: TKJT-E-WORKOVER, TUKAU-E PLATFORM
Client : Murphy Sarawak Oil Co Ltd (KIKEH).
: Shapadu Energy Engineering Sdn Bhd (TUKAU-E)
Duties : Carry out Ultrasonic Testing Thickness Measurement (UTTM)
on Duplex lines as per project specification for KIKEH.
: Perform Magnetic Particle Inspection (MPI) on the structure, (stiffener) for TUKAU-E.

December 2006 - February 2007
Company : YTL Power Services Sdn Bhd (Contract Basis)
Position : NDT Tech cum QC Inspector
Project Details : Major Overhaul at Kuo Kuang Power Plant, Taiwan.
: Perform Visual inspection, Ultrasonic Testing (UT) Flaw, MPI Fluorescent, and DPI Fluorescent on the Gas Turbines and Steam Turbines machine such as the blade, bearing, bolt and nuts, turbine basing and etc.
: To ensure all the inspection are always on schedule and to perform all documentation task such Visual report, Fit-Up report etc.
: To prepare final documentation, summary and filing of reports in accordance to client reporting and documentation system.
: Monitor welding activities to maintain the production and report joint progress to lead inspector accordance of approved Welding Procedure
Specification (WPS).
Client : SIEMENS LTD, GERMANY.
Duties : Carry out visual inspection, ultrasonic testing (UT), Magnetic Particle Inspection (MPI), and Dye Penetrant Inspection (DPI) as per project specification.

October - December 2006
Company : Techscan Inspection Services Sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : Maari Field Development Wellhead Platform, Temporary Refuge Accommodation Module (TRAM), electrical & Instrument Switch Room (EISR), (Helideck Structures), Lumut Perak.
Maintenance Project at Dulang B Platform (OFFSHORE), Petronas.
: Perform Ultrasonic Testing (UT) Flaw on the Support Structure Beam for maintenance of the platform.
Client :Global Process system Pte Ltd, Transerve Pte Ltd, Intisari Mulia Engineering Pte Ltd.
Vastalux Engineering Sdn Bhd - Petronas Carigali Sdn Bhd.
Duties : Carry out ultrasonic testing (UT), Magnetic Particle Inspection (MPI),
and Dye Penetrant Inspection (DPI) as per project specification.

January 2006 – October 2006
Company : Total Sterling (M) Sdn Bhd (Contract Basis)
Position : NDT Inspector
Project Details : Petronas Ammonia, Kerteh, Terengganu
: To do Ultrasonic Testing Thickness Measurement, MPI and DPI on the Reactor, Tanker and Vessel for maintenance work.
Shell Refinery Company (M) Sdn Bhd, Port Dickson.
: To perform UT Thickness Measurement (UT), Magnetic Particle Inspection (MPI), and Dye Penetrant Inspection (DPI) as per project specification.
: Report to the QA/QC for any flaw or defect or ‘imperfect’ such as the “leakage of the tanker” in the plant to make sure no ‘major’ defect that can caused any hazard to the people.
Vinyl Chloride Malaysia (M) Sdn Bhd, 3rd Major Turnaround
: To perform UT Thickness Measurement, DPI and MPI as per requisition.
: Perform DPI and MPI on tube sheet exchanger, drum, boiler, storages tank, high pressure tank, column, vessel and item per request during plant turnaround.
Talisman Limited, Malaysia-Vietnam (OFFSHORE).
: To perform UT Flaw Detector, MPI and DPI on metal fabrication structure such ‘jacket leg’, support structure, and piping for T, K, or Y joints.
: Do the inspection on the items such as Nozzle (T joint) and Nod (K, Y joints), those items are usually been inspected on the oil exploration platform.
: To ensure the guaranteed quality, UT will be done before and after Post Weld Heat Treatment (PWHT) to make sure no major defect or ‘crack’ occur after PWHT are accepted as per specification of the Acceptance Criteria.
: Coordinate works with QC departments, Client, and QA/QC Inspectors to ensure quality level are achieved and the inspected item are acceptable to the code and specifications requirements as stipulated
Client : Transfield Services Sdn Bhd, Ramunia Fabricator Sdn Bhd, Tenaga Nasional Berhad, Germanishcer Lloyd etc.
July 2005-December 2005
Company : Global Inspection Services Sdn Bhd
Position : NDT Inspector (Team Leader)
Project Details : 3 X 700 MW Coal Fired Power Plant, Tanjung Bin Johor.
: To perform UT Flaw, MPI and DPI on structure and piping for metal works fabrication for the Power Plant project.
: Also, do the UT for Production Test in order to get the best method or welding process for the items that have been produce. So that, Welding Inspector and QA/QC department will know what are the best process of welding should be taken.
: Interact with client representative for daily activities, and to prepare final documentation, summary and filing of reports in accordance to client reporting and documentation system.
: Feature Wall- VIVOCITY, Teluk Blangah, Singapore.
: To perform Nondestructive Testing, UT, MPI, DPI on the structure of Shopping Complex at Singapore.
: The structure is made by carbon steel’s piping were fabricated to be the structure of the shopping complex where was inspected to ensure there is no defect that can causes the failure.
: To prepare final documentation, summary and filing of reports in accordance to client reporting and documentation system.


Client : Jiwa Harmoni Offshore Sdn Bhd, Bureau Veritas Limited.
Duties : Carry out ultrasonic testing (UT), magnetic particle inspection (MPI),
and dye Penetrant testing (DPI) as per project specification.

June 2005-July 2005
Company : Global Inspection Services Sdn Bhd
Position : NDT Inspector
Project Details : Crane Fabrication – Perform NDT on the crane structure that will be used at oil plantation (offshore). Make sure all parts are safe and well kept of NDT activities.
Client : Victor Buyck Steel Construction Sdn Bhd, Favell & Co (FAVCO).
Duties : Carry out ultrasonic testing (UT), magnetic particle inspection (MPI),
and dye Penetrant testing (DPI) as per project specification.

August 2004-May 2005
Company : Global Inspection Services Sdn Bhd
Position : NDT Inspector
Project Details : KL Private Hospital Project – Perform NDT on the structure of metals fabrication for the project such as the H-Beam, I-Beam, and also the Plate Joints of the structure.
Client : Yuen Fee Engineering Sdn Bhd and Sedia Bena Offshore Sdn Bhd
Duties : Carry out ultrasonic testing (UT), magnetic particle inspection (MPI),
and dye Penetrant testing (DPI) as per project specification.
July 2004 - August 2004 (Contract Basis)
Company : NF Energy SDN. BHD
Position : QC Inspector
Duties : Perform welding inspection activities, fit up, visual inspection and
coordinate with client representative.
: Monitor welding activities to maintain the production and report joint progress to lead inspector accordance of approved Welding Procedure Specification (WPS)
: Reviews design drawings, engineering specifications for compliance to company standard.
: Interact with client representative for daily activities.
: Material inspection / verification and review film on any repaired joint for final endorsement.

May 2004-July 2004 (Contract Basis)
Company : FAR ENGINEERING Sdn Bhd
Position : Assistant QA/QC Inspector
Duties : Assist QA/QC Inspector to perform welding inspection activities, fit up, visual inspection and coordinate with client representative.
: Perform all documentation task such Visual report, Fit-Up report etc.
: To prepare final documentation, summary and filing of reports in accordance to client reporting and documentation system.
:Monitor welding activities to maintain the production and report joint progress to lead inspector accordance of approved Welding Procedure
Specification (WPS).

August 2003-January2004
Company : Inai Kiara Sdn Bhd
Position : Stock Control Executive
Duties : Perform stock analysis activities, data inventory and coordinate with client representative.
Project Details: Marine Construction.


Additional Info:
Expected Salary : Nego
Availability : Nego




References

1. Name : Mohd Ali Mohd
Mobile No. : 012-9017775
Email : Mohd_ali@tati.edu
Position : Senior Manager
Company : Ruane TATI Sdn Bhd

2. Name : Saharuddin Harun
Mobile No. : 013-6040484
Position : Director
Company : Global Inspection Services Sdn Bhd

3. Name : Zulkifli Abd Ghani
Mobile No. : 019-9502046
Position : NDT Supervisor
Company : Total sterling (M) Sdn Bhd

4. Name : Capt Guldzar Mohamad
Mobile No. : 019-2311111
Position : CEO
Company : Inai Kiara sdn Bhd

5. Name : H. Burchardt
Mobile No. : 03-27320551
Position : Senior Director
Company : YTL Power Services Sdn Bhd



TEAM Industrial Solutions