Evident Ultrasonic Inspection Equipment
UT Technician

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
I am on a job and will finish soon.
Currently working but always looking.
I am willing to work overseas.
Certifications
QUALIFICATION

MLVK : Welding & Metal Fabrication (SKM level II)
: Mechanical Engineering Manufacturing (SKM level II)

ASNT : ASNT SNT-TC-1A – Ultrasonic Testing Level II
Certificate Number: CSNT/08/001

PCN : Ultrasonic Testing 3.1(Plate), 3.2(Pipe) & 3.9(Node)
Certificate Number: FO08S3326236

Education
APRIL 2008 : MINDT Training and Certification Sdn. Bhd
Sri Damansara, Kuala Lumpur.

JUNE 2002 : Inspections and Examination in Non-Destructive Testing By Ruane - TATI
Awana Kijal Kemaman


JAN 2001 : Mechanical Engineering manufacturing level II
By Inst Kemahiran Mara Tan Sri Yahya Ahmad

JAN 1999 : MLVK Basic & Intermediate in Metal

By Inst Kemahiran Belia Negara Terengganu
Experience
Working Experience
CARE ION TECHNOLOGIST SDN BHD
Referees : Zamri Md Isa (Manager)
Contact No : 087-416023 / +60138030161

Date: JAN 2009 – TO PRESENT
Project : CARIGALI PTTEPI OPERATING (CPOC) COMPANY B17 LATERAL
PIPELINE PROJECT
Client : REAL OFFSHORE INSTALLATION COMPANY (ROIC) SDN.BHD
Position: UT Technician
Scope of Work:
 Perform UT flaw on Plum structural. Carried out UT on lifting lug, Beam & T, K, Y Joint and various joint configurations
24 inch lateral pipeline UT lamination after bevel cutting, UT on weldment Accordance API 5LX 65, AWS D1.1

Project: 1) M2 – 133b –CILIPADI GAS FIELD DEVELOPMENT PROJECT
FUEL GAS SKIDS (A-6010)

2) M2 – 134 – GEMUSUT KAKAP SEMI FPS PROJECT
SABAH SHELL PETROLEUM CO. LTD.

3) M2 – 135 – KENCANA PETROLEUM DULANG FIELD
COMPRESSED GAS CAPACITY PROJECT PETRONAS CARIGALI SDN.BHD

4) M2 – 124A- SUPPLY PRSSURE VESSEL FOR TANGGA BARAT
CLUSTER DEVELOPMENT PROJECT
PETRONAS CARIGALI SDN.BHD.

5) M2 – 133a – SUPPLY OF PRESSURE VESSEL PAKAGE FOR CILIPADI
GAS DEVELOPMENT PROJECT SARAWAK SHELL BERHAD






Client : MSET ENGINEERING / PETRONAS CARIGALI SDN BHD
Position : UT TECHNICIAN
Scope of work:
 Perform UT flaw during the fabrication heavy vessel 100% Long seam & circ seam before and after PWHT.UT on nozzle, node joint.
Accordance ASME V, ASME VIII DIV1, APP12 & client specifications

Date: DEC 2008 – JAN 2009
Project : THE EPCC OF UNDERGROUND FUEL HYDRANT PIPELINE
AT KOTA KINABALU INTERNATIONAL AIRPORT
Client : PETRONAS DAGAGAN BERHAD
Position : MULTI TECHNICIAN
Scope of Work:
 As multi technician carry out UT Flaw on under ground piping
To perform holiday test after wrapping completed accordance
ASME B31.4/B31.8 process piping transportation

Date: JULY 2008 – DEC 2008
Project : LABUAN GAS TERMINAL UPGRADE & PIPELINE (PCC1)
Client : KEB VENTURES/PETRONAS CARIGALI SDN BHD
Position : MULTI TECHNICIAN
Scope of Work:
 Carried out UT flaw on piping carbon & stainless steel pipe size 8”Diax36mm,10”Dia x 48mm, 12”Dia x56mm.ut on Nozzle joint.
 Re-confirm defect after do TOFD inspection UT before & After PWHT .Accordance ASME B31.3 process piping.

Date: JUNE 2008 – JULY 2008
Project : BOKOR RE-DEVELOPMENT PROJECT PHASE II, LABUAN
Client : VASTALUX SDN BHD / PETRONAS CARIGALI SDN.BHD
Position : UT TECHNICIAN
Scope of Work:
 To perform UTFD inspection on Jacket Riser clamp, Beam, Various joint configurations welds joint for the project. Accordance AWS D1.1 2004




Date: MAY 2008 – JUNE 2008
Project : LG STORAGE BULLET TANK
Client : PETRONAS DAGANGAN BERHAD (JOHOR PORT)
Position : MULTI TECHNICIAN
Scope of Work:
 As multi Technician, Carried out UT, MT, PT on nozzle Joint. Carried out UT Thickness on dish head body and shell body
Accordance ASME V, ASME VIII DIV1, APP12, APP6, APP8.

Referees : Zamri Md Isa (Directors / Manager)
Contact No : +6098251616 / +60199322666

Date: MAC 2008 – MAY 2008
Project : 1) 2 - 119 BOKOR PROJECT-PETRONAS CARIGALI

2) 2 – 107 & 108 – MURPHY OIL

3)115 – MALAYSIA REFINING COMPANY SDN.BHD

4)120 – SKIP ANGSI PHASE PROJECT – PCSB
Client : MSET ENGINEERING / PETRONAS CARIGALI SDN BHD
Position : UT TECHNICIAN
Scope of work:
 Perform UT flaw during the fabrication heavy vessel 100% Long seam & circ seam before and after PWHT.UT on nozzle, node joint.
Accordance ASME V, ASME VIII DIV1, APP12 & client specifications

Date: JAN 2008 – MAC 2008
Project : STS CRANE QC-17 REPAIRS
Client : PELABUHAN TANJUNG PELEPAS JOHOR
Position : UT TECHNICIAN
Scope of work:
 Carry out UTFD at trolley house structure crane, crane Monorail and formed MPI/DPI at monorail beam. Accordance AWS D1.1 & Client specification



Date: APR 2006 – DEC 2007
Referees : Shamsuri Hj Saad (Area Manager, F.T Labuan)
Contact No : 087-416023 / +60138030161
Project 1) TELUK SALUT COMBINED 190MW CYCLE PROJECT
KOTA KINABALU, SABAH.

2) SEPAGAR BAY 100MW GAS FIRED POWER PLANT AT KOTA
KINABALU, SABAH

Position : NDT COORDINATOR/MULTI TECHNICIAN
Scope of work:
 To coordinate NDT and radiographic activity at site and make sure that all activities as per client Specification
 To perform radiographic film interpreter and multi discipline Technician to perform UT/MT/PT for the various configurations Welds joint for the project fabrication
Accordance ASME V, ASME B31.1, ASME B31.3

Project : TOP SIDE STRUCTURE MAINTENANCE TEMBUGO-A&B
PLATFORM (OFFSHORE)
Client : PETRONAS CARIGALI SDN.BHD.
Position : MULTI TECHNICIAN
Scope of Work:
 As Multi technician to carried out UT/MT/PT on conductor pile, Crane boom rest, pipe support UT thickness on port tank & Piping system Accordance AWS D1.1, ASME B31.3

Project : HOOK – UP & COMMISIONING AT BARAM B SKO WATER
(BARAM SOUTH DEVELOPMENT & PIPELINE REPLACMENT PROJECT
Client : PETRONAS CARIGALI (SARAWAK OPERATIONS)
Position : MULTI TECHNICIAN
Scope of work:
 As Multi technician carried out UT/MT/PT on the various Configuration welds joint UT on structure, conductor pile, pipe Support. Accordance ASME B31.3, AWS D1.1




Project : KIKEH –DTU SPAR Offshore PROJECT MURPHY OIL
Client : MURPHY OIL COPERATIONS (OFFSHORE)
Position : UT TECHNICIAN
Scope of work:
 Carried out UT flaw detection on TTR support frame DK.7 during installation modification KIKEH Platform
Accordance AWSD1.1 & Client specifications

Project : HOOK-UP & COMMISIONING AT ERB – WEST PROJECT
Client : PETRONAS CARIGALI SDN. BHD (SARAWAK OPRT)
Position : MULTI TECHNICIAN
Scope of work:
 As multi technician carried UT/MT/PT on piping system joint Nozzle joint, UT at beam, lifting lug, conductor pile and various Joint configuration during the fabrication for the project
As per ASMEB31.1, ASME VIII, DIV1 APP12, AWS D1.1

Referees : Zamri Md Isa (Directors / Manager)
Contact No : +6098251616 / +60199322666
MAC 2006 – APR2006
Project UT THICKNESS SURVEY AT DERIVITIES PLANT
Client : OPTIMAL CHEMICALS (M) SDN. BHD
Position : UT TECHNICIAN
Scope of work:
 To perform UT Thickness survey for piping system, tank
Vessel, column, Head exchanger As per Client specifications

Date: FEB 2005 – MAC 2006
Project 1)12 REACTORS & HEAVY VESSEL FOR SAUDI ARABIAN FETILIZER
COMPANY (SAFCO) FOR PLANT NH3/UREA COMPLEX

2) ALCAN G3 EXPENSION PROJECT, AT KNM/KPC

3) 2HP ABSOBERS FOR OGD_III ONSHORE GAS DEVELOPMENT PHASE III PROJECT, UEA AT KNM/GFS



Scope Of work:
 Perform UT flaw at KNM Process system during the Fabrication of absorber flash vessel and reactor & heavy vessel,
Thickness 147 mm carbon steel
Thickness 141 mm carbon steel + 3mm stainless steel
 UT before and after Post weld heat treatment (PWHT)
Accordance ASMEVIII DIV I, APP 12, 2002 ED, 2002 AD
And follow as per client specifications

Date: OCT 2004 – DEC2004
Project : OTWAY GAS PROJECT ON-SHORE GAS PLANT
Client : TECHNIP WINS
Position : MULTI TECHNICIAN
Scope Of work:
 Performed UT flaw during the fabrication of heavy vessel UT 100% all weldment long seam, circ seam, top head before & After PWHT .UT Lam. check before plate rolling and after Accordance ASMEVIII DIV I,APP 12,2002 ED ,2002 AD

Date: MEI 2004 – JULY 2004
Project : TELAGA USHA WORKOVER RIG
Client : SAAG DRILLING & WELL SERVICES
Position : MULTI TECHNICIAN
Scope of work:
 Carried out UT on crane boom rest, crane pedestal, lifting lug Beam & T, K, Y Joint and various joint configuration during to Installation jacket & rig Accordance AWS D1.1 Edition 2001

Date: MAC 2004 - APR 2004
Project : BP AMOCO TURNAROUND 2004
Client : BP AMOCO CHEMICALS (M) SDN. BHD
Company : OILFIELD PIPELINE INSPECTION SDN. BHD
Position : MULTI TECHNICIAN
Scope of work:
 Carried out UT thickness measurement on pressure vessel, column, Tanks, heat exchanger/tube and piping system
 Perform MPI/DPI on butt weld on piping, tube sheet/exchanger and all item during turnaround project as per ASME sect v, Sec VIII & ASME B31.3

Date: JAN 2004 - MAC 2004
Project : ANGSI PHASE 3 HOOK-UP COMMISIONING DEVELOPMENT
Client : PETRONAS CARIGALI SDN. BHD (1st trip)
Company : CARE ION TECHNOLOGIST SDN. BHD
Position : MULTI TECHNICIAN
Scope Of work:
 To perform UT FLAW on structure for monorail such as lifting, pipe support crane pedestal. Crane boom rest, conductor pile and various joint configurations
 Perform MPI/DPI butt joint conductor pile, beam stiffener Accordance AWSD11.specificatons.

Date: 27 SEPT 2003 - DEC 2003
Project : ANGSI PHASE 3 HOOK-UP COMMISIONING DEVELOPMENT
Client : PETRONAS CARIGALI SDN. BHD (2nd trip)
Company : CARE ION TECHNOLOGIST SDN. BHD
Position : UT TECHNICIAN
Scope of work:
 Carried out UT flaw on conductor pile after completed Weldment on butt joint piping after PWHT for upgrade line ANPG-A
 To performed MPI/DPI test butt joint conductor pile after weld
Accordance ASME Sect v and ASME B31.3

Date: JUN 2003 - AUG 2003
Project : PIPING SURVEY ONBOARD TRENERGY F.P.S.O
Client : TRENERGY F.P.S.O
Company : CARE ION TECHNOLOGIST SDN. BHD
Position : UT TECHNICIAN
Scope of work:
 Carried out UT thickness on piping system, pressure vessel, tanks and heat exchangers refer making point by inspector as per client specifications






Date: APR 2003- JUNE 2003
Project : DUYONG DDP-B MODIFICATION FOR HYDRAULIC WORKOVER
Location : DUYONG –B PLATFORM PCSB OFFSHORE
Client : SHAPADU ENERGY / PETRONAS CARIGALI SDN.BHD
Company : VELOSI (M) SDN.BHD
Position : MULTI TECHNICIAN
Scope of work:
 To carried out UT flaw on tubular 45 Diameter, I-beam, Lifting lug, Crane pedestal. Jacket riser clamp and various joint configurations
 Also carry out MPI/DPI for top side joint, monorail Support and lifting lug, Accordance AWS DI.I specification

Date: SEPT 2002 - JAN 2003
Global Inspection Services Sdn. Bhd, Penang Malaysia.
Multi Technician

Referees : Meor Mazlan, Area Manager
Contact No : 0122218881
Project : MCISB / K1 Turnaround 2003, Langkawi Maintenance
Of 850 Limestone Crusher K1
Client : Malayan Cement Industries Sdn. Bhd, Langkawi
Scope of work:
 To perform UT flaw on 42’’ KILN shell external and perform UT Thickness measurement at raw mill and coal mill

Client : PSE Penang
Scope of work:
 UT flaw on butt joint during the fabrication of storage tanks Underground piping

Client : Lahazam Construction Sdn. Bhd
Project : Nibong Tebal Steel Bridge Project, Penang
Scope of work:
 As multi technician carried out UT/MT/PT on structure bridge. UT on beam joint Accordance AWS D1.1 2000




CH Steel Sdn Bhd (Penang Location):

Client : Ranhill Bersekutu Sdn. Bhd
Scope of work:
 UT flaw on structure such an I-beam, channel head and UT lam.Check for incoming plate before rolling process.

Client : Road Builders (M) Sdn. Bhd.
Project PUTRAJAYA Project Phase Z
Scope Of work:
 As multi technician .carried out UT/MT/PT on structure joint, Beam. Girder, support and various joint configuration accordance AWS D1.1 2000

Comments
SUMMARY OF TECHNICAL EXPERIENCE
More than seven (7) years working experience in Non-Destructive Testing and Engineering Inspections for Onshore / Offshore and refineries industries.
Worked with various major Client e.g. PETRONAS CARIGALI SDN BHD, PETRONAS GAS BERHAD, Optimal Chemicals (M) Sdn. Bhd, Exxon Mobil Exploration And Production Inc. BP Amoco Chemicals Sdn. Bhd, Murphy Oil, KRUPP UHDE GMBH, Ranhill Engineer & Constructors and Process/Chemical plant/refinery e.g. MTBE, BASF, ABF, GPP and etc. Worked major fabricators e.g. KNM Process System, AMB, AMC
Qualified PCN/ASNT Level II certificate for Ultrasonic Testing (UT), Magnetic Particle Testing (MT) undergo various project as UT Operator, MT Technician. The status of PCN (UT) Level II (3.1, 3.2, and 3.9) proves I is independently and suit working with any project being taken in past and in the future.

Mistras Group