Evident Ultrasonic Inspection Equipment
API 653 / API 510 Inspector

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
Country: Malaysia
Status:
I am willing to Travel.
I am on a job and will finish soon.
I am willing to work overseas.
I prefer temp jobs.
Certifications
1. Course attended for ISO 9001:2000 Interpretation & Appreciation by Lloyd's Register.

2. Boiler Training Programmed (In-House) by Zainudin Zulkifli (BASF-Petronas Chemicals)

3. Risk Base Inspection Training (RBI) by Yuri Mazkovoi (SGS Australia), Nov 2007

4. Certified CSWIP 3.1 Welding Inspector-Steel (CSWIP CERT NO. 17068).

5. Certified API 510 Pressure Vessel Inspector (API 510 CERT NO. 27447).

6. Certified API 653 Above Ground Storage Tank Inspector (API 653 CERT NO. 32787)
Education
Level : Bachelor's Degree (Hons)
Field of Study : Engineering
Major : Mechanical
Graduation Date : April 2001
Name of Institution : Universiti Tenaga Nasional (UNITEN), Kajang, Malaysia
Experience
Mei 2009 to Present
Metalcare Services Asia Pte Ltd
Position : API Inspector (API 653 and API 510)
Work scope : Seconded to PT. Irsindo Inspeksi Utama for Chevron Pacific Indonesia (CPI) for Storage Tank Inspection Services. To perform tank assessment as per API 653 requirement on Tank out of service and in-service as well as MFL scanning and survey.

April 2009
Petrotechnical Inspection Sdn. Bhd (SGS Malaysia)
Position : Lead Inspection Engineer
Work scope : Seconded to BASF Petronas Chemical Sdn Bhd as Static Equipment Inspector during TAR April 2009 OXO Unit. Performing inspection and reports on heat exchanger and vessel as per API 510 (53 units of equipment).

March to April 2009
Petrotechnical Inspection Sdn. Bhd (SGS Malaysia)
Position : Lead Inspection Engineer
Work scope : Performing Tank assessment as per API 653 requirement on Tank out of service and in-service inspection as well as re-certification to API653 of Tank 13, 15 and 32 for PT. Vopak, Merak Terminal, Indonesia.

Feb to March 2009
Petrotechnical Inspection Sdn. Bhd (SGS Malaysia)
Position : Lead Inspection Engineer
Work scope : Seconded to BASF Petronas Chemical Sdn Bhd as Static Equipment Inspector during TAR 2009 AA/AE Unit. Performing inspection and reports on heat exchanger and vessel as per API 510 (87 units of equipment).

Nov 2008 to Present
Petrotechnical Inspection Sdn. Bhd (SGS Malaysia)
Position : Lead Engineer
Work scope : Performing Tank assessment as per API 653 requirement on Tank out of service and in-service inspection as well as re-certification to API653 Shell Asia Pacific MEA Contract.

April 2006 to Nov 2008.
SGS (Malaysia) Sdn. Bhd.
Seconded to Shell Refinery Co. (FOM) Berhad, Port Dickson)
Position : Inspection Engineer
LRCC MTA2008 from June – July 2008 as a Static equipment Inspector
Plant/RBI Inspector for routine maintenance work for Inplot Crude distiller and Platformer complex) from October 2006 to March 2007 and for LRCC complex from May 2007 to Nov 2008
CD-1 Shutdown March 2007 as a Static equipment Inspector for Vessels and Furnaces/Boiler.

Feb 2006 to April 2006.
Warga Hikmat Kejuruteraan Sdn. Bhd.
Position : QA/QC Inspector (Senior Engineer – QC)
Client : Petronas Penapisan (Melaka) Sdn. Bhd.
M/Contractor : Shinryo (M) – Steamline (M) Consortium
Project : PP(M)SB Cogeneration Project (Piping Fabrication & Installation)

June 2005 to Jan 2006
PT. Peremba Nusantara, Indonesia
Position : QA/QC Coordinator (Senior Engineer – QC)
Client : PT. Bhakti Mingasutama, Indonesia
Project : Erection of Two (2) Units LPG Sphere Tanks 5000M3

July 2001 to December 2004
Warga Hikmat Kejuruteraan Sdn. Bhd.
Position : QA/QC Inspector
Client : ESSO (M) Berhad /PFK / PPMSB / VCM
Scope of Work
Hydrocracker Metallurgy Upgrade Project – TAR 2004 Preparation.
Repair work of Sphere Tank OSS-8006 (Top Ring, Top side and Top center Crown)
PF-1 Shutdown 2004 Repair and upgrading Reactor R-6004, R-6005 and R-6006 (Bottom Head Shroud)
Piping work, Modification for Stable Reliable APS Unit Operation Piping system (Reused E-1127E).
MLNG-3 Plant (Mechanical work – piping fabrication, installation and commissioning.)
Piping work, Mogas Blending Facilities upgrade project.
Pre-Heater and Associated Piping during T/A 2002
Repair Works of 1-unit Column 'C-1854'
Mistras Group