Certifications:

• API 510 inspector
• API 570 inspector
• API 571 supplemental certification
• CP (South Africa pressure vessel inspector)
• NACE coating inspector level one
• OSHA 10 hr.
• TWIC card
• Current USA Passport
Education
Areas of Expertise

• Repair recommendations
• Turnarounds/Expansions
• Maintenance Inspections
• Mechanical Integrity
• Quality Inspections


Professional Strengths

• Knowledge of industry standards and regulatory codes including API,
ASME, ASTM, OSHA, AWS and ASNT.
• Computer proficiency; familiarity with Microsoft applications and
inspection programs.
• Strong organizational skills, self-motivation, and ability to prioritize
tasks effectively.
• Solid communication and interpersonal skills; ability to form effective
working relationships with a diverse range of personalities.
Experience
Work Experience

July 2011-Present

Oxy (Occidental) Oil exploration and production for the Permian northern
fields
Duties include wellhead, flow line, water/CO2 injection lines, and satellite
battery pressure equipment internal/ external inspections with emphasis on
damage mechanisms and mitigation methods. The duties also included
issuing of repair recommendations and repair procedures. I currently am
responsible for over 2,000 oil production wells including over (40) production
batteries. It is also noted that several shop inspections are conducted monthly
for various pressure equipment & associated coating applications.

May 2011-June 2011
Lyondell- Channel view, TX. East plant turnaround (C-4 recovery & MTBE
units) full internal, external inspections and repair recommendations.

April 2011-May 2011
Suncor, Denver, CO. Crude (Asphalt) plant Turnaround API 510-570
inspections, and repair recommendations.

January 2011-March 2011
Conoco Phillips, Woodriver. Duties included the initiation and development of
a plant wide CUI inspection program for various pressure vessels.

December 2010
Holly Corp, Tulsa. Internal and external inspections on various pressure
equipment during the plant wide shutdown.

October 2010-November 2010
Valero, Texas city. Duties included internal and external inspections on
various reactors for train’s 1 & 2 located in the gas oil hydro-treater unit.

August 2010-September 2010
Sasol, South Africa. Rectesol turnaround. Duties included internal and external
inspection on various towers, drums and following various repairs.

July 2010-August 2010
Tesoro, Hawaii. Inspections and repairs on the bundle pad for plant wide
shutdown.




April 2010-May 2010
IENOS, Chocolate Bayou. The turnaround was for the Olefins #1unit; the
duties performed were inspections of various towers with the issuing of repair
recommendations and follow-ups.

March 2010-April 2010
Conoco Phillips, Woodriver. The turnaround included the FCCU2 unit in which
various inspections were performed according to API 510/570 codes.

January 2010-February 2010
Marathon, TX city. Lead inspector for the HF alky unit as it was in turnaround
status with extensive repairs made thought a majority of all pressure vessels.

December 2009-January 2010
Conoco Phillips, Woodriver, API 510 internal and external inspections were
performed with the issuing of repair recommendations and follow-ups. (NHT
Turnaround)

November 2009-December 2009
Conoco Phillips, Woodriver. Quality assurance for various piping projects in
the CR3 unit turnaround.

September 2009-October 2009
Conoco Phillips, Woodriver. API 510, 570 internal, external inspections, and
repair recommendations. (HCU, SMR, CR-1, and SGP Turnaround)

August 2009-September 2009
South Africa, Sasol. CP/API 510 internal & external inspections on various
pressure equipment. (Rectesol Turnaround)

March 2009-April 2009
Hunt, Tuscaloosa. API 510 internal and external inspections were performed
with the issuing of repair recommendations and follow-ups. (Hydrobon, DHT,
Hydrogen plant, and Coker units.

February 2009-March 2009
Conoco Phillips, Woodriver. API 510 internal and external inspections were
performed with the issuing of repair recommendations and follow-ups.
(Coker unit turnaround)



January 2009-February 2009
Navajo, Artesia. Lead inspector during the HF alky turnaround API 510 internal
and external inspections were performed with the issuing of repair
recommendations and follow-ups.

October 2008-November 2008
Marathon- API 510 internal and external inspections were performed with the
issuing of repair recommendations and follow-ups. (HF alky unit)

August 2008- September 2008
South Africa, Sasol. API 510 internal and external inspections were performed
with the issuing of repair recommendations and follow-ups. (Rectesol unit)

May 2008-June 2008
Frontier, Cheyenne. API 510 internal and external inspections were performed
with the issuing of repair recommendations and follow-ups. The majority of
work was performed on the bundle pad. (Plat former & NHT units)

February 2008- April 2008
Sunoco, Philadelphia. API 510 internal and external inspections were
performed with the issuing of repair recommendations and follow-ups.
(FCCU and Crude units)

January 2008-February 2008
Exxon Mobil, Louisiana HF alky T/A API 570 inspections of various piping
flange faces including repair recommendations and follow-ups.

November 2007-December 2007
Marathon, HF alky T/A API 510/570 internal and external inspection of
various pressure equipment.

October2007-November 2007
Frontier, HF alky T/A API 510 internal and external inspections were
performed with the issuing of repair recommendations and follow-ups.

September 2007-October 2007
Conoco Philips, Woodriver. Duties performed were API 570 inspections and
data evaluation for tie in lines of new unit construction.



August 2007-September 2007
Sasol, South Africa. API 510/ CP internal and external inspections were
performed with the issuing of repair recommendations and follow-ups.
(Rectesol unit)

June 2007-Aug. 2007
Frontier Refinery, Eldorado. Duties performed were API 570 external
inspections plant wide and isometric drawings.

April 2007- June 2007
Conoco Phillips, Woodriver. Duties included establishment of TML selection
for various piping throughout the Coker and crude units, these areas were
identified and set forth as a standard for radiographs and ultra sonic
inspections.

February 2007-March 2007
Sasol, South Africa. API 510/ CP internal and external inspections were
performed with the issuing of repair recommendations and follow-ups.
(Rectesol unit)


Team industrial services / Conoco Phillips, Woodriver, IL
October 2001- January 2007

November 2006- January 2007
Conoco Phillips, Woodriver. Duties were plant wide structure inspection of
various unit and (IDP) piping structural supports and associated fireproofing.

October 2006—Catalyst Reformer 1 T/A internal and external on various
pressure equipment, and QA of Monel overlay project in our caustic water
wash column, inspection of flange make ups/ finishes, PRV installation,
exchanger and bundle inspection etc.

February 2006-September 2006
Implementations of plant wide mix point inspection RT digital profiles, and
UTT.

November 2005-February 2006
Cat cracker 3 at distilling west preliminary inspection and NDE of unit
equipment and piping to restart unit, @ time of inspection the unit has been
shut down for several years.

October 2005
CR 3 unit T/A inspection of vessels, piping, flange make-ups/ finishes.

January 2005- October 2005
Field services pipeline inspection RT weld quality, assist with GUL, worked at
various fabrication shops.

November 2003- December 2004
Plant wide run and maintain projects in Alky, aromatics, and CR units.

October 2003
Distillery 2 T/A assisted in internal inspections and performed various forms
of NDE for pressure equipment.

January 2003-October 2003
Field services worked at various fabrication shops, power plants
Etc. RT welds quality, MT, PT, PMI, and UTT.

May- 2002-January 2003
Plant wide run and maintain program, pipe rack inspection and several
different units, visual, profile RT and UT inspection of various piping.

April 2002
Cat cracker unit T/A (NDE)

Feb 2002
Hartford integration project- assisted in internal inspection of vessels, and
columns. (NDE)

Jan 2002
Coker unit Hartford integration project assisted in internal inspection of coke
drums, vessels, and columns. (Ultrasonic testing, MT, PT, and ACFM)

October 2001
DU1 T/A inspection of distillery and vacuum flasher unit, internals on vacuum
column, and several internals on exchanger shells. (Ultrasonic, MT, and
ACFM)