Mistras Group
BSelby's Resume'

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: TX Texas
Country: United States
Status:
I am willing to Travel.
I am willing to work overseas.
Certifications
A.W.S Certified Welding Inspector Cert #93060341
A.W.S. Radiographic Interpreter Cert #1107006N
A.S.N.T ACCP Level II VT Cert #205093
Houston Area Safely Council Basic Plus. Exp. 08/2017
United State of America Passport Expiration 02-19-2026
TWIC Expiration 08-15-2018
2009 OSHA 30 Cert #600374271
Expired Certifications: Level III RT, PT, Level II UT, RT, MT, PT,
Level II Mechanical Certified per ANSI N45.2.6 and ASME NQA-1
Education
GED 1983
Experience
DOB 09/29/1964, with 30+ yrs. of QA, QC/NDE Inspection experience in Chemical Plant Upgrades, Solar plant construction, Nuclear power plant construction refuel and SGR outages, Fossil fuel and Refinery shutdown and construction on and operating offshore drilling platforms. Codes worked to ASME V, VIII Div.1, IX, XI, B31.1, B31.3, NBIC, A.W.S D1.1, D1.5, and D1.6, ABS
Comments
Brian Selby
5034 Boca Chica Blvd #67
Brownsville, Tx 78521
787-914-6859
BSelby0929@Gmail.com

Objective
QA/QC Oversite, QC Inspector

Certifications
A.W.S Certified Welding Inspector Cert #93060341
A.W.S. Radiographic Interpreter Cert #1107006N
A.S.N.T ACCP Level II VT Cert #205093
Houston Area Safely Council Basic Plus. Exp. 08/2017
United State of America Passport Expiration 02-19-2026
TWIC Expiration 08-15-2018
2009 OSHA 30 Cert #600374271
Expired Certifications: Level III RT, PT, Level II UT, RT, MT, PT,
Level II Mechanical Certified per ANSI N45.2.6 and ASME NQA-1

Summary
DOB 09/29/1964, with 30+ yrs. of QA, QC/NDE Inspection experience in Chemical Plant Upgrades, Solar plant construction, Nuclear power plant construction refuel and SGR outages, Fossil fuel and Refinery shutdown and construction on and operating offshore drilling platforms. Codes worked to ASME V, VIII Div.1, IX, XI, B31.1, B31.3, NBIC, A.W.S D1.1, D1.5, and D1.6, ABS

Work History

09/16- 11/16 ProEnergy (QC Inspector)
Contracted to Nooter Construction for the BP Whiting, Indiana turnaround. Preformed visual weld and
mechanical inspections on Heat Exchangers, Drums, Towers, Reactors and Pressure Vessels to ASME VIII Div.1 and NBIC code. Witnessed bolt torqueing and hydro testing. Worked directly with the BP API 510 inspectors on all repair code work.

03/16 -08/16 Zachry Group (QC Inspector)
Assigned to Chevron/Phillips Polyethylene Plant in Sweeny TX. To perform welding inspections on piping and related components for the construction phase. Perform fit up, root and final inspections on welds to ASME B31.3. Document all inspection on weld trackers and weld map on isometric drawings.

Belcan Corporation (Owners Representative)

03/15-12/15 Assigned to Monsanto chemical Plant in Muscatine, IA, for Global Engineering to oversee all fabrication activities on the Dicamba phase 2 project. Duties were the same as in phase 1 from 09/14-12/14.

01/15-03/15 Assigned to Monsanto Luling plant in Louisiana at the end of the Debottlenecking Project in CT-2 and CT-3 to witness the remaining Hydro testing, review the remaining Radiographic film and to review all the turnover packages for the plant.

09/14-12/14 Assign to Monsanto chemical plant in Muscatine, IA for Global Engineering to oversee all fabrication activities on the Dicamba formulation phase1 project. Duties include review of all WPS, PQR, MTR, welder qualification records, visual and NDE inspector’s certification and procedures. Monitor all welding and production activities daily to conform to ASME B31.3 code Review all quality control forms weld maps and radiographs. Witness pump alignment and bolt torque, perform final walk down on piping system for completion and punch list prior to and witness hydro testing. Review and prepare turnover packages and all related paperwork for Monsanto chemical plant at completion of job.






12/13-07/14 Brahma Group Inc. (QA/QC Inspector)
Assigned to the Crescent Dunes Solar Energy project in Tonopah, NV. Duties include Visual, Dimensional and Mechanical inspections on the construction of the project. Perform fit up, root and final inspection on large and small bore piping on A-106-Gr. B, 347 S/S, P-11, P-22 and P-91 material to ASME B31.1 Document all inspections on weld tackers and weld maps on isometric drawing. Witness flange torque, pump alignment and performed system walk down for hydro test, review all weld qualifications and production radiographs for quality.

08/13-10/13 Engineering & Inspection (NDE Technician)
Performed RT, MT, PT and UT inspections at various facilities on the island on Oahu, Hawaii

02/13-07/13 Consulting and Field Services (QA/QC Oversite)
Assigned to NCRA refinery in McPherson, KS as third party inspector for the Coker replacement project. Duties included witnessing concrete placement and testing on foundations and columns. Monitor welding, NDE and QC activities on a daily basis to ASME B31.3 code and reviewed radiographs for quality.

07/12-11/12 Bureau Veritas (QA/QC Oversite)
Contracted to Exxon Mobil to monitor all quality activates on the construction of the marine containment systems in Lake Charles, LA. Duties included reviewing major repairs and all Radiographs, preform surveillances on contract quality inspectors and NDE technicians, witness bend test on new welder and report all finding directly to the QA/QC manager with weekly report on the quality of the project.

03/12-07/12 Project Assistance Corporation (QC Inspector)
Assigned to Shaw Modular Solutions in Lake Charles, La to Perform VT, MT, and PT inspection on structural steel components for the construction on VC Summer and Vogtle nuclear power plants.

02/12-03/12 URS/Washington Group (QC Welding/Mechanical Inspector)
Assigned to the MOXI Fuel Project at Savannah River Site in Aiken, SC to perform visual inspections on piping hangers and supports during construction.

06/10-12/11 International Quality Consultants (QC Welding Mechanical Inspector)
Assigned to the salt waste processing facility at Savannah River Site in Aiken, SC to perform inspections on piping and related equipment, review radiographs of welder qualifications and production welds with RT level III during the construction phase of the plant.

12/09-06/10 URS, Washington Group (NDE Technician)
Assigned to the Salt Waste Processing Facility at the SRS in Aiken, SC. to perform and interpret digital radiograph on piping during prefabrication on initial construction of the plant.

10/08-05/09 TRS Staffing/Fluor (QC Inspector)
Assigned to ConocoPhillips refinery in South Roxanna, IL to perform QC inspections on piping and related components for the core project.

07/08-09/08 Zachry Constructors (QC Inspector)
Assigned to Plum Point Power Plant in Osceola, AR to perform QC inspection on Balance of Plant Piping during construction.

02/08-05/08 Cunningham and Brown (QC Welding Inspector)
Assigned to Big West refinery, Bakersfield, CA. Duties include receiving inspection maintaining documentation, weld mapping, rod control, issuing RFI, NRC and verifying OS&D, certifying welder and other QC duties.

Hudson Global Resources (QC Welding/Mechanical Inspector)

11/07-01/08 Performed QC and NDE inspection on the steam generator replacement outage at Diablo Canyon Nuclear Power Plant in CA.



10/07-11/07 Performed QC and NDE inspection on pressurized surge nozzle and decay heat weld overlay, pressure relief flange replacement at Three-Mile Island 1 R 17 outage, in PA.

07/07-09/07 Foster Wheeler (QA/QC Oversite)
Responsible for oversight of numerous contractors at El Segundo, CA refinery. Performed random visual inspection on welds and equipment, verify completed work with P&ID’s to applicable codes, witness hydro inspection.

09/06-07/07 Total Western Incorporated (QC Inspector)
Assigned to GE Inland Empire Energy Center Power Plant at Romoland, CA, to perform visual weld and mechanical inspection during the construction phase.



08/06-10/06 Conam Inspections (NDE Technician)
Performed visual and NDE inspections for the steam generator replacement at Watts-Bar Nuclear Plant Unit 1, in Sweetwater, TN

03/06-06/06 International Quality Consultants (QC inspector)
Performed visual weld inspection for the construction phase at Council Bluffs Energy Center Unit 4, IA.

01/06-03/06 Wyatt VI (QC Inspector)
Perform Inspection on various turnarounds at Hovensa Refinery, St Crouis, VI.

07/05-12/05 Mechanical integrity Solutions (NDE Technician)
Performed visual and NDE inspection for Shell Chemical at Yabucoa, PR.



*worked for the following companies performing inspections as stated in summery

04/05-05/05 International Testing Laboratory Services
03/05-04/05 International Quality Consultant
03/04-03/05 Washington Group Intl
09/03-12/03 Steel Services
02/96-09/03 Letourneau Inc.
06/95-12/95 EFABCO
02/95-05/95 SGS Industrial Services
07/94-11/94 Conam Inspection
02/94-04/94 SGS industrial Services
01/92-02/94 Grimes Aerospace Company
10/91-01/92 Longview Testing company
07/91-09/91 Conam Inspection Company
04/91-06/91 Universal Testing Labs
11/90-03/91 Conam Inspection Company
08/90-10/90 United States Testing Company
05/90-06/90 Plant Inspection Company
03/90-05/90 Universal Testing Labs
09/89-02/90 United States Testing Company
05/88-07/89 Laws Engineering Testing Company
03/88-04/88 Unites States Testing Company
02/88-03/88 Nuclear Energy Services
03/87-12/87 Combustion Engineering Company
04/84-01/87 United States Testing Company
11/82-02/84 GEO Construction Testing

Evident Ultrasonic Inspection Equipment