Curtiss Wright Nuclear
Kerry Hearn Resume 2020

To see contact info and over 12,000 resumes Get a Level II Subscription or Call (415) 796-6446.
State: MA Massachusetts
Country: United States
Status:
I am willing to Travel.
I prefer permanent jobs.
Certifications
API 510 Pressure Vessel Inspector (Cert. # 37871) - Expiration Date: July-31-2022
API 570 Piping Inspector (Cert. # 39794) - Expiration Date: January-31-2023
API 653 Above Ground Tank Inspector (Cert. # 42216) - Expiration Date: November-30-2020
Education
The Ocean Corporation, NDT/Inspection Training; Houston, TX (Diploma)
Mark Smith API 510 Certification Training Class; Bartlesville, Ok
Mark Smith API 570 Certification Training Class; Bartlesville, Ok
Mark Smith API 653 Certification Training Class; Bartlesville, Ok
Chris Marler Visual Inspection of Internal and External Pressure Vessels; Houston, TX
Experience
IRISNDT at Valero Renewables July 2017 – Present
• Senior API 510/570/653 / East Crew Lead providing internal/external inspections on tanks, pressure vessels, heat exchangers, and PSM piping systems
• Lead API on turnarounds within the 14 Valero Ethanol plants scheduling API and NDE personnel for inspection tasks and ensure inspection plans are followed
• Reviewed inspection results and recommendations prior to submittal to the client
• Reviewed all written field reports and drawings prior to submittal to the client
• Responded to client requests for non-scheduled inspections
• Circuitization of three (3) newly acquired Ethanol Plants
• Managed the sketching of piping isometrics and equipment, establishment of CMLs and Redlining of P&IDs

ABS Group at Pfizer Pharmaceutical Plant; Barceloneta, PR October 2016 – July 2017
• Lead API 510/570/653 inspector providing internal/external inspections on tanks, pressure vessels, heat exchangers, and PSM piping systems
• Scheduled personnel for inspection tasks and ensured inspection plans are provided to define each task
• Established new Ultrasonic (UT) Condition Monitoring Locations (CML), approved and maintained documents of repairs potentially impacting the integrity of tanks, pressure vessels, heat exchangers, and PSM piping systems
• Recorded inspection results and recommendations
• Reviewed all written field reports and drawings prior to submittal to the client
• Performed internal/external inspection per the schedule per API 510, 570, and 653 site needs
• Responded to client requests for non-scheduled inspections

Stronghold Inspection at Valero Refining; PA, TX September 2016 – October 2016
• API 510/570 inspector for the bundle pad and the Crude unit providing internal/external inspections on piping, bundles and exchanger components

Weld Spec, Inc. at Valero Refining; PA, TX August 2016 – September 2016
• API 510 inspector for the GFU unit providing internal/external inspections on pressure equipment, vessels, columns, and exchangers

Mistras Group Inc. at Shell Refining; Martinez, CA May 2016 – June 2016
• API 510 inspector for the Sulfur Recovery Unit #3 & Scot Unit #3 providing internal/external inspections on pressure equipment, vessels, columns, and exchangers

Stronghold Inspection at Sinclair Refining; Casper, WY April 2016 – May 2016
• API 510 inspector for the bundle pad providing internal/external inspections on bundles and exchanger components

Mistras Group Inc. at Ineos LLC. Lima, OH March 2016 – April 2016
• API 510/653 inspector for the CAPU providing internal/external inspections on pressure equipment, vessels, columns, exchangers and tanks

Mistras Group Inc. at Big West Oil Refining; Salt Lake City, UT Feb 2016 – March 2016
• API 510/570 inspector for the MSCC Structure & Flue providing internal/external inspections on the Regenerator, Reactor, Orifice Chamber, Flue Gas Cooler, Air Preheater and Flue Gas Line

Mistras Group Inc. at Tesoro Refining; Carson, CA January 2016 – February 2016
• API 510/570 inspector for the #2 Crude & # 52 Vacuum units providing internal/external inspections on pressure equipment, vessels, columns, piping and exchangers

Stronghold Inspection at Marathon GBR; Texas City, TX January 2016 – January 2016
• API 510 inspector for the Alky 3 unit providing internal inspections on pressure equipment, vessels, columns and exchangers

Stronghold Inspection at Valero; Three Rivers, TX September 2015 – October 2015
• API 510 inspector for the BTX, CCR, NHT, LEU, HCU & SWS units providing internal inspections on pressure equipment, vessels, columns and exchangers

Mistras Group Inc. at Chevron Refining; Salt Lake City, UT August 2015 – Sept. 2015
• API 510 inspector for the SRU, Amine/TGU, SWS & VGO units providing internal/external inspections on pressure equipment, vessels, columns and exchangers

Stronghold Inspection at CHS Refining; Laurel, MT July 2015 – August 2015
• API 510 inspector for the bundle pad providing internal/external inspections on bundles and exchanger components

Team Industrial Services at Citgo Refining; Lemont, IL May 2015 – July 2015
• API 510 inspector for the Alky unit providing internal inspections on towers, drums and exchangers

Team Industrial Services at BP Refining; Birch Bay, WA April 2015 – May 2015
• API 510/570 inspector for the Sulfur unit providing internal/external inspections on pressure equipment, vessels, columns, piping and exchangers

Stronghold Inspection at Valero; Three Rivers, TX August 2014 – April 2015
• API 510/570/653 Capital project oversight and inspection
• Managing routine on-stream API inspections
• Provide inspection recommendations and support to the client
• T/A Inspection for outages and projects

Qualspec Group at Valero; Port Arthur, TX January 2014 – August 2014
• API 510/570/653 Unit inspector for HFAU 443 at Valero Port Arthur
• Provide API inspections on pressure equipment, vessels, columns, piping and exchangers along with setting the inspection interval based on the process, corrosion damage mechanism and the risk rank
• Provide inspections on non-pressure retaining components that affect the integrity of the pressure equipment including foundations, fireboxes, burners, stacks, dampers, structural members, tank seals and spring hangers
• Provide documentation, surveillance, and recommendations along with recommendation spread sheet log for the work that can be performed while the unit is operating verses the work for the 2015 T/A
• Provide T/A inspection coverage for CAT changes along with various outer outages

Stronghold Inspection at Valero; Port Arthur, TX October 2012 – January 2014
• API 510/570/653 Unit inspector for HFAU 443 at Valero Port Arthur
• Managing routine on-stream piping inspections
• Provide inspection recommendations and support to the client
• Created a piping recommendations log for the 2015 T/A
• Recircuitized the entire unit
• Sketching of piping isometrics and establishment of CMLs
• T/A Inspection of pressure vessels for outages and projects

Mistras Group Inc. at Pandora/OCI; Nederland, TX January 2012 – October 2012
• API 510/570/653 inspector representing Pandora Methanol for the recommissioning of the methanol and ammonia units
• Internal and external inspection of pressure vessels and piping systems including documentation of finding, repair recommendations, inspection of repairs and final sign off for client
• Equipment and piping system inspection and testing for the commissioning including; pre-hydro, hydro, post-hydro and final operations walk down
• Developing the on-stream inspection and mechanical integrity program including the implementation of the PCMS database

Metco Inspections at Flint Hills Resource; Port Arthur, TX April 2009 – January 2012
• API 510/570/653 inspector for the Light Olefins Unit providing internal/external inspections on tanks, pressure vessels, heat exchangers, and PSM piping systems

Gap Engineering & Inspections at Alon Refinery; Big Spring, TX April 2008 - April 2009
• UTSW, UTT, PT, MT, VT, PMI, hardness testing, on-stream inspections, turn around inspection, ISO drawings
• Walk down Relief Valves for visual inspection while recording servicing dates by servicing companies, serial numbers, psi and sizes
• Fire Assessment on Equipment and Piping

Team Industrial Services at Multiple Plants; Beaumont, TX September 2007 - April 2008
• UT-Thickness, PT, & MT, on-stream inspections, turnaround inspection, ISO drawings
Evident Ultrasonic Inspection Equipment